7,7 CP&L C0 PLANT PERFORMANCE DATA SYSTEM PAGE 9
RON DATE 03/04/06 APPENDIX U - AVERAGE DAILY POWER LEVEL RPD39 RUN tit 1E i+1:44:01 BRUNSWICK UNIT 1 DOCKET NO. 050-0325 COMPL.ETED BY FRANCES HARRISON TELEPHONE (919)457-9521 FEDRUARY 1986 DAY AVG. DAILY POWER LEVEL.
DAY AVG. DAILY POWER LEVEL (MWE-NET)
(MWE-NET) i 772 17 779 2
775 10 770 3
773 19 774 4
774 20 779 5
7 /2 21 777 6
769 22 773 7
769 23 776 8
767 24 776 9
771 25 773 10 773 26 775 11 773 27 700 12 779 20 779 13 770 14 700 15 763 16 676 1.16 - G B603180333 860228 64 PDR ADOCK 05000324
%' 1i R
\\l
CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE i
RON DATE 03/04/06 OPERATING DATA REPORT RPD36 RUN TIliE 11:44:02 BRUNSWICK UNIT i DOCKET NO. 050-0325 COMPLETED BY FRANCES HARRISON OPERATING STATUS TELEPHONE (91'?)4S7-9521
- i. UNIT NAME: BRUNSWICK UNIT 1 l NOTES I
2.
REPORTING PERIOD: FEDRUARY 06 I
l 3.
LICENSED THERMAL POWER (MWT) 2436 l
l 4.
NAMEPLATE RATING (GROSS MWE) 067.0 1
1 5.
DESIGN ELECTRICAL RATING (NET MWE) 021.0 l
l 6.
MAX DEPENDABLE CAPACITY (GROSS MWE) 015.0 i t
7.
MAX DEPENDADLE CAPACITY (MET MWE) 790.0 O.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMi 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE AIIVE i1. HOURS IN REPORTING PERIOD 672.00 1416.00 7040i.00
- 12. NUMBER OF HOURS REACTOR CRITICAL 672.00 1416.00 40247.40
- 13. REACTOR RESERVE SHUTDOWN HRG
.00
.00 1647.10
- 14. HOURS GENERATOR ON LINE 672.00 1416.00 45553.30
- 15. UNIT RESERVE SHUIDOWN HOURS
.00
.00
.00
- 16. GROSS THERMAL ENERGY GEN. (MWH) 16i0301.06 3390455.90 934971IV.63
- 17. GROSS ELEC. ENERGY GEN. (MWH) 532323.00 ii22697.00 300~/3Y70.00
- 10. NET ELEC. ENERGY GENERATED (MWH) 510017.00 1092227.00 29650924.00-
- 19. UNIT SERVICE FACTOR 100.00 100.00 50.04
- 20. UNIT AVAILADILITY FACTOR 100.00 100.00 50.04
- 22. UNIT CAP. FAC10R (USING DER NET) 93.09 93.95 46.02
- 23. UNIT FORCED OUTAGE RATE
.00
.00 19.49
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ECTIMAIED DAYE OF START UP
- 26. UNITS IN TEST STATUS (PRIOR TO COMiiLRCIAL UPERATION)
FORCAST ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9
DOCKET NO.:.050-0325 UNIT:
Brunswick 1 DATE: February 1986 l
COMPLETED BY: Frances Harrison OPERATIONS
SUMMARY
BRUNSWICK UNIT 1 Brunswick Unit 1 operated at a 100 percent availability factor for the month of February with a 97.6 percent capacity factor. There were two power reductions.
Details are in the Unit Shutdowns and Power Reductions sheet.
I l
l
'There are 840 BWR and 160 PWR spent fuel bundles in the Brunswick Unit 1 fuel
[
pool.
I l
l I
i
\\
h
050-0325 UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAbdE Brunswick I DATE March 1986 REPORT h80 NTH February 1986 COhrLETED BY _ Frances Harrison TELEPHONE 919-457-9521 e
e.
= -. :
5
.2 E E
E4 Licensee
[*,
{3
~.
Cause & Corrective No.
Date g
3g
(
.g g &
Eient 3Y Action to
$E 5 jgg Reput #
,# G fu p,,,,,,g,c,,,,,,,
6 85-010 860215 F
0.00 B
5 Performed scram time on one rod that had maintenance work done.
1 I
2 3
4 F: Forced Reason:
heethod:
Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) l-heanual for Preparation. of Data B mi=a*==ce of Test 2-heanual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Repor (LER)FileINUREG-D-Regulatory Restriction 0161) l EOperator Training & Ucense Emanuaation 4-Continuations F-Administrative 5-Load Reductions 5
GOperational Error (Emplain) 6-Other Exhibit I.Same Source l'3/77)
HOther(Emplain) u" i
l DOCKET NO.
050-032s UNITSHUTDOWNS AND FOWER REDUCTIONS UNIT NAME Brunswicic T DATE March 1986 REPORT MONDg February 1986 COtrl ETED gy Frances Harrison TEI.ErlGONE 919-457-9521 l
n.
t.. E e
c_
r, "O
C*" A C"'"C85
3 En Ei Action to l
$5 E
E d :!!
Report a NG Ed Prevent Recurrence 2
6 6
t 1
I 86-009 860207 S
0.00 B
5 NA Reduced power for routine turbine, SV, CIV, and bypass valve testing.
t i
l i
I I
2 3
4 F: Forced Reason:
Method; Exhibit G-Instructions S: Scheduled A-Equipenent Failure (Explain) 1-Manual for Preparation of Data l
B-Mainsemance of Test 2-Manual Scram.
Entry Sheets for Licensee l
C-Refuetag 3-Autosnatic Scram.
Event ReporilLERIFileINUREG-D-Regulatory Restriction 0161) t 4-Continuations l
sM)perator Training & Ucense Exavanation F-Administrative 5-Load Reductions 5
l GOperational Error (Explain) 6-Other Exhibit I - Same Source l'8/77)
HOther(Explain)
N -
.a
~
- 7. -
LCP&L.C0 PLANT PERFORMANCE DATA SYSTEM PAGE 2
'lWUN DATE' 03/04/06 1 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39 RUN TEME-11:44:01 DRUNSWICK UNIT 2 DOCKET NO. 050-0324 COMPLETED DY FRANCES HARRISON TELEPHONE ( 919 ) 45'< -9521 FEDRUARY 1986 DAY AVG.' DAILY. POWER LEVEL DAY
~ AVG. DAILY POWER LEVEL (MWE-NET)
(MWE-NET).
1
-4 17-
-4 2
-4 10
-4 3
-5 19.
-4 4
-5 20
-4 5
-4 21
-4 6
-4 22
-4 7
-4 23
-4 0
-4 24
-4 9
-3 73
-4 10
-3 26
-4 11
-4 27
-4 12
-3 20 4
13-
' -3 14
-4 15
~4 16
-4 r
1.16 - O t
.. m
. m --..
CPAL 60
.PLANTLPERFORMANCE DATA SYSTEM PACE 2
RUN'DATE~ 03/04/06' OPERATING DATA REPORT RPD36 RUNLTIME ti:44:02 BRUNSWICK UNIT 2 e
DOCKET NO. 050-0324 i
COMPLETED DY FRANCES HARRISON OPERATING STATUS TELEPHONE (919)457-9521 l
- i. UNIT.NAME!'DRUNSWICK UNIT 2 l NOTES l
2' REPORTING PERIOD: FEBRUARY. 86 l
l
- 3. LICENSED THERMAL POWER (MWT): 2436 l
l
- 4. NAMEPLATE RATING-(GROSS'MWE): 867.0 l
l 5.. DESIGN ELECTRICAL RATING (NET MWE): 821.0 l
l
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE)? 015.0 l l
i
- 7. MAX DEPENDADLE CAPACITY (NET MWE): 790.0 0 ~. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE' REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
l
- 10. REASONS FOR RESTRICTION IF ANY:
l THIS YR TO CUMUL MONTH DATE ATIVE
{
.11. HOURS IN REPORTING' PERIOD 672.00 1416.00 90505.00
- 12. NUMBER OF HOURS REACTOR CRITICAL
.00
.00 54512.36
- 13. REACTOR RESERVE GHUTDOWN HRS
.00
.00
.00
- 14. HOURS GENERATOR ON LINE
.00
.00 51011.09 l
15.. UNIT RESERVE SHUTDOWN HOURS
.00
.00
.00
- 16. GROSS THERMAL ENERGY GEN. (MWH)
.00
.00 90029072.53
- 17. GROSS ELEC. ENERGY GEN. (MWH)
.00
.00 32795404.00 4
- 18. NET ELEC. ENERGY GENERATED (MWH)
-2651.00
-6201.00 31431798.00
- 19. UNIT SERVICE FACTOR
.00
.00 56.36
- 20. UNIT AVAILABILITY FACTOR
.00
.00 56.36
.50
.55 43.96
- 22. UNIT CAP. FACTOR (USING DER NET)
.48
.53 42.30
- 23. UNIT FORCED OUTAGE RATE
.00
.00 15.40
- 24. SHUTDOWNG SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIHATED DATE OF START UP:
[
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORCAST ACHEIVED i
INITIAL CRITICALITY
~~
INITIAL ELECTRICITY COMMERCIAL.0PERATION
~~~~~~~-
1.16 - 9
4 DOCKET NO.: 050-0324 UNIT: Brunswick 2 DATE: March 1986 COMPLETED BY: Frances Harrison i
OPERATIONS
SUMMARY
BRUNSWICK UNIT 2 The unit was removed from service on November 30, 1985, for the refueling /
maintenance outage.
There are *1168 BWR and 144 PWR spent fuel bundles in the Brunswick Unit 2 fuel pool.
- 560 bundles have been moved to spent fuel during refueling.
I
[
P l
t k.
m m m m.
m
'JNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
050-0324 UPWT nab 8E Brunswick TT DATE March 1986 REPORT 900 NTH February 1986 CORWLETED BY Frances H m* on TELErit0NE 919-457-952I jg 3
E Licensee
,Ev, Cause & Corrective N.
Diane g
3g 4
.3 s &
Ev'ent g3 3
Action to f5 5
ggg Report a mO U
Prevent Recurrence g
d 85-078 851130 S
In C
4 NA RC FUELXX Refueling / Maintenance Outage.
Progresa I
2 3
4 F: F.wced Reason:
hierhod:
Exhibit G - lastructions S: Scheduled A-Eq=paient Failure (Explain) 1-Manual for Preparation of Data B-tenintenance of Test 2-henaual Scram.
Ents) Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Repsxt (LERI File (NUREG-D-Regulatory Restriction 0161)
E4)perator Training & Ucense Exarranation 4-Continuations F-Adaniastrative 5-Load Reductions 5
G4)perational Error (Emplain) 6-Other Exhibit I - Sanw Source (4/77)
H4)ther (Emplain) r
{
~
Cp&L Carolina Power & Light Cor. t 'ny a
Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429 March 5, 1986 FILE: B09-13510C SERIAL: BSEP/86-0260 Mr. J. M. Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT UNITS 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 l
MONTHLY OPERATING REPORT l
Dear Mr. Taylor:
In accordance with Technical Spscification 6.9.1.6 for the Brunswick Steam Electric Plant, Units 1 and 2, Carolina Power & Light Company herewith submits the report of operating statistics and shutdown experience for the month of February 1986.
Very truly yours, d
C. R. Dietz, General Manager Brunswick Steam Electric Plant FH/mbh MSC/85-0014 Enclosures cc:
Mr. M. R. Beebe Dr. J. N. Grace Mr. M. D. Hill Mr. P. W. Howe Mr. C. F. Lassiter Mr. R. G. Oehl Ms. D. J. Vicks INPO
'//