Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARBSEP-99-0168, Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with ML20212D0431999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Brunswick Steam Electric Plant,Units 1 & 2 ML20210R1191999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Bsep,Units 1 & 2 BSEP-99-0118, Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with ML20210R1311999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Bsep,Unit 2 BSEP-99-0095, Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-99-0075, Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With BSEP-99-0059, Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-99-0043, Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-99-0005, Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0231, Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0218, Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with BSEP-98-0202, Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0185, Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0164, Monthly Operating Repts for July 1998 for BSEP Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for BSEP Units 1 & 2 BSEP-98-0142, Monthly Operating Repts for June 1998 for BSEP Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for BSEP Units 1 & 2 ML20151S9041998-05-31031 May 1998 Revised Pages to Monthly Operating Rept for May 1998 for Brunswick Steam Electric Plant,Unit 1 BSEP-98-0129, Monthly Operating Repts for May 1998 for Bsep,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Bsep,Units 1 & 2 ML20151S8991998-04-30030 April 1998 Revised Pages to Monthly Operating Rept for Apr 1998 for Brunswick Steam Electric Plant,Unit 1 BSEP-98-0104, Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-98-0080, Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 2 BSEP-98-0055, Monthly Operating Repts for Feb 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-98-0038, Monthly Operating Repts for Jan 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-98-0007, Monthly Operating Repts for Dec 1997 for Brunswick Steam Electric Plant,Unit 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Brunswick Steam Electric Plant,Unit 1 & 2 BSEP-97-0528, Monthly Operating Repts for Nov 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0500, Monthly Operating Repts for Oct 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0456, Monthly Operating Repts for Sept 1997 for Brunswick Steam Electric Plant1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Brunswick Steam Electric Plant BSEP-97-0410, Monthly Operating Repts for Aug 1997 for Bsep,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Bsep,Units 1 & 2 BSEP-97-0373, Monthly Operating Repts for Jul 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0323, Monthly Operating Repts for June 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0266, Monthly Operating Repts for May 1997 for Brunswick Steam Electric Plant Units 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-97-0219, Monthly Operating Repts for Apr 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0142, Monthly Operating Repts for March 1997 for Bsep,Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Bsep,Units 1 & 2 BSEP-97-0105, Monthly Operating Repts for Feb 1997 for Bsep,Units 1 & 21997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Bsep,Units 1 & 2 BSEP-97-0055, Monthly Operating Repts for Jan 1997 for Brunswick Steam Electric Plant Units 1 & 21997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Brunswick Steam Electric Plant Units 1 & 2 ML20138H7881996-12-31031 December 1996 Corrected Monthly Operating Rept for Dec 1996 for Brunswick Unit 1 BSEP-97-0015, Monthly Operating Repts for Dec 1996 for Brunswick Steam Electric Plant Units 1 & 21996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-96-0451, Monthly Operating Repts for Nov 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Brunswick Steam Electric Plant,Units 1 & 2 ML20138H7821996-11-30030 November 1996 Corrected Monthly Operating Rept for Nov 1996 for Brunswick Unit 1 BSEP-96-0422, Monthly Operating Repts for Oct 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0375, Monthly Operating Repts for Sept 1996 for Brunswick Steam Electric Plant Unit 1 & 21996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Brunswick Steam Electric Plant Unit 1 & 2 BSEP-96-0330, Monthly Operating Repts for Aug 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0295, Monthly Operating Repts for July 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0253, Monthly Operating Repts for June 1996 for Brunswick Steam Electric Plant Units 1 & 21996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-96-0236, Monthly Operating Repts for May 1996 for Brunswick Steam Electric Plant Units 1 & 21996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-96-0204, Monthly Operating Repts for April 1996 for BSEP1996-04-30030 April 1996 Monthly Operating Repts for April 1996 for BSEP BSEP-96-0146, Monthly Operating Repts for Mar 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0097, Monthly Operating Repts for Feb 1996 for BSEP1996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for BSEP BSEP-96-0053, Monthly Operating Repts for Jan 1996 for BSEP Units 1 & 21996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for BSEP Units 1 & 2 BSEP-96-0008, Monthly Operating Repts for Dec 1995 for Brunswick Steam Electric Plant1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Brunswick Steam Electric Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N3271999-10-21021 October 1999 Part 21 Rept Re non-linear Oxygen Readings with Two (2) Model 225 CMA-X Containment Monitoring Sys at Bsep.Caused by High Gain Produced by 10K Resistor Across Second Stage Amplifier.Engineering Drawings Will Be Revised BSEP-99-0168, Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with ML20212D0431999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Brunswick Steam Electric Plant,Units 1 & 2 ML20210P9441999-08-10010 August 1999 Safety Evaluation Accepting Licensee Assessment of Impact on Operation of Plant,Unit 1,with Crack Indications of 2.11, 6.36 & 1.74 Inches in Three Separate Jet Pump Risers ML20210P9181999-08-10010 August 1999 Safety Evaluation Authorizing Request for Reliefs CIP-01,02, 06,07,08,09,10 & 11 (with Certain Exceptions) & 12-18,for Second 10-year ISI Interval.Request CIP-04 & 05 Would Result in hardship,CIP-03 Not Required & CIP-11 Denied in Part ML20210N2341999-08-0505 August 1999 SER Accepting Response to NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issues (USI) A-46 ML20210R1191999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Bsep,Units 1 & 2 ML20210R1311999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Bsep,Unit 2 BSEP-99-0118, Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with BSEP-99-0095, Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20210M8581999-05-14014 May 1999 B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, Rev 0 ML20211L3711999-05-10010 May 1999 Rev 0 to ESR 98-00333, Unit 2 Invessel Feedwater Sparger Evaluation ML20206G1871999-05-0404 May 1999 Safety Evaluation Approving Third 10-year ISI Program Requests for Relief (RR) RR-08,RR-15 & RR-17 BSEP-99-0075, Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With ML20206N1791999-04-23023 April 1999 Rev 0 to 2B21-0554, Brunswick Unit 2,Cycle 14 Colr BSEP-99-0059, Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20205F9031999-03-30030 March 1999 Safety Evaluation Supporting Proposed Rev to BSEP RERP to Licenses DPR-62 & DPR-71,respectively ML20206N1831999-02-28028 February 1999 Rev 0 to Suppl Reload Licensing Rept for Bsep,Unit 2 Reload 13 Cycle 14 BSEP-99-0043, Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20203D7061999-02-0909 February 1999 SER Accepting Proposed Alternatives Contained in Relief Requests PRR-04,VRR-04,VRR-13,PRR-01,PRR-03,VRR-01.VRR-07, VRR-08 & VRR-09 Denied BSEP-99-0005, Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0231, Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0218, Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with BSEP-98-0210, Special Rept:On 980824,temp Element 2-CAC-TE-1258-22 Failed. Cause of Failed Temp Element Cannot Be Conclusively Determined.Temp Element Will Be Replaced & Cable Connections Repaired1998-10-30030 October 1998 Special Rept:On 980824,temp Element 2-CAC-TE-1258-22 Failed. Cause of Failed Temp Element Cannot Be Conclusively Determined.Temp Element Will Be Replaced & Cable Connections Repaired ML20154P8151998-10-16016 October 1998 SER Accepting Revised Safety Analysis of Operational Transient of 920117,for Plant,Unit 1 ML20154P8591998-10-16016 October 1998 SER Accepting Equivalent Margins Analysis for N-16A/B Instrument Nozzles for Plant,Units 1 & 2 BSEP-98-0202, Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20151Y6211998-09-14014 September 1998 BSEP Rept Describing Changes,Tests & Experiments, for Bsep,Units 1 & 2 ML20151Y6371998-09-14014 September 1998 Changes to QA Program, for Bsep,Units 1 & 2 BSEP-98-0185, Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20151T5021998-08-0505 August 1998 Project Implementation Plan, Ngg Yr 2000 Readiness Program, Rev 2 BSEP-98-0164, Monthly Operating Repts for July 1998 for BSEP Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for BSEP Units 1 & 2 ML20236T1961998-07-0101 July 1998 Rev 1 to 2B21-0088, Brunswick Unit 2,Cycle 13 Colr ML20236T1921998-07-0101 July 1998 Rev 1 to 1B21-0537, Brunswick Unit 1,Cycle 12 Colr BSEP-98-0142, Monthly Operating Repts for June 1998 for BSEP Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for BSEP Units 1 & 2 ML20236T1971998-06-30030 June 1998 Rev 2 to 24A5412, Supplemental Reload Licensing Rept for Brunswick Steam Electric Plant Unit 2 Reload 12 Cycle 13 ML20249B9691998-06-11011 June 1998 Rev 1 to VC44.F02, Brunswick Steam Electric Plant,Units 1 & 2,ECCS Suction Strainers Replacement Project,Nrc Bulletin 96-003 Final Rept BSEP-98-0129, Monthly Operating Repts for May 1998 for Bsep,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Bsep,Units 1 & 2 ML20151S9041998-05-31031 May 1998 Revised Pages to Monthly Operating Rept for May 1998 for Brunswick Steam Electric Plant,Unit 1 BSEP-98-0104, Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 2 ML20151S8991998-04-30030 April 1998 Revised Pages to Monthly Operating Rept for Apr 1998 for Brunswick Steam Electric Plant,Unit 1 ML20247N7501998-04-30030 April 1998 Rev 0 to BSEP Unit 1,Cycle 12 Colr ML20247N7721998-04-30030 April 1998 Rev 0 to J1103244SRLR, Supplemental Reload Licensing Rept for BSEP Unit 1,Reload 11,Cycle 12 ML20217K8461998-04-24024 April 1998 Safety Evaluation Approving Proposed Use of Code Case N-535 at Brunswick Unit 1 During Second 10-yr Interval,Pursuant to 10CFR50.55a(a)(3)(i).Authorizes Use of Code Case N-535 Until Code Case Included in Future Rev of RG 1.147 ML20217K3941998-04-24024 April 1998 SER Approving Relief Request for Pump Vibration Monitoring, Brunswick Steam Electric Plant,Units 1 & 2 ML20217E6841998-04-23023 April 1998 Safety Evaluation Accepting Code Case N-547, Alternative Exam Requirements for Pressure Retaining Bolting of CRD Housings ML20217E7471998-04-21021 April 1998 Safety Evaluation Accepting Alternative to Insp of Reactor Pressure Vessel Circumferential Welds ML20217B5241998-04-20020 April 1998 SE Accepting Licensee Request for Approval to Use Alternative Exam Requirement for Brunswick,Unit 1,reactor Vessel Stud & Bushing During Second 10-yr ISI Interval Per 10CFR50.55a(a)(3)(ii) BSEP-98-0080, Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 2 ML20216B1041998-03-0404 March 1998 SER Approving Alternative to Insp of Reactor Pressure Vessel Circumferential Welds for Brunswick Steam Electric Plant, Unit 1 1999-09-30
[Table view] |
Text
-
7,7 CP&L C0 PLANT PERFORMANCE DATA SYSTEM PAGE 9 RON DATE 03/04/06 APPENDIX U - AVERAGE DAILY POWER LEVEL RPD39 RUN tit 1E i+1:44:01 BRUNSWICK UNIT 1 DOCKET NO. 050-0325 COMPL.ETED BY FRANCES HARRISON TELEPHONE (919)457-9521 FEDRUARY 1986 DAY AVG. DAILY POWER LEVEL. DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) i 772 17 779 2 775 10 770 3 773 19 774 4 774 20 779 5 7 /2 21 777 6 769 22 773 7 769 23 776 8 767 24 776 9 771 25 773 10 773 26 775 11 773 27 700 12 779 20 779 13 770 14 700 15 763 16 676 1.16 - G B603180333 860228 PDR ADOCK 05000324 64 R PDR
%' 1i
\l
CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE i RON DATE 03/04/06 OPERATING DATA REPORT RPD36 RUN TIliE 11:44:02 BRUNSWICK UNIT i DOCKET NO. 050-0325 COMPLETED BY FRANCES HARRISON OPERATING STATUS TELEPHONE (91'?)4S7-9521
- i. UNIT NAME: BRUNSWICK UNIT 1 l NOTES I
- 2. REPORTING PERIOD: FEDRUARY 06 I l
- 3. LICENSED THERMAL POWER (MWT) 2436 l l
- 4. NAMEPLATE RATING (GROSS MWE) 067.0 1 1
- 5. DESIGN ELECTRICAL RATING (NET MWE) 021.0 l l
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE) 015.0 i t
- 7. MAX DEPENDADLE CAPACITY (MET MWE) 790.0 - - - - - - - - - - - - - - - - - - - - - - - - -
O. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMi 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE AIIVE i1. HOURS IN REPORTING PERIOD 672.00 1416.00 7040i.00
- 12. NUMBER OF HOURS REACTOR CRITICAL 672.00 1416.00 40247.40
- 13. REACTOR RESERVE SHUTDOWN HRG .00 .00 1647.10
- 14. HOURS GENERATOR ON LINE 672.00 1416.00 45553.30
- 15. UNIT RESERVE SHUIDOWN HOURS .00 .00 .00
- 16. GROSS THERMAL ENERGY GEN. (MWH) 16i0301.06 3390455.90 934971IV.63
- 17. GROSS ELEC. ENERGY GEN. (MWH) 532323.00 ii22697.00 300~/3Y70.00
- 10. NET ELEC. ENERGY GENERATED (MWH) 510017.00 1092227.00 29650924.00-
- 19. UNIT SERVICE FACTOR 100.00 100.00 50.04
- 20. UNIT AVAILADILITY FACTOR 100.00 100.00 50.04
- 21. UNIT CAP. FACTOR (USING MDC NET) 97.50 97.64 47.02
- 22. UNIT CAP. FAC10R (USING DER NET) 93.09 93.95 46.02
- 23. UNIT FORCED OUTAGE RATE .00 .00 19.49
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ECTIMAIED DAYE OF START UP
- 26. UNITS IN TEST STATUS (PRIOR TO COMiiLRCIAL UPERATION) FORCAST ACHEIVED INITIAL CRITICALITY - - - - - - - - - - - - - - - -
INITIAL ELECTRICITY --- - - - - - - - - -
COMMERCIAL OPERATION - - - - - - - -- - --
1.16 - 9
DOCKET NO.: .050-0325 UNIT: Brunswick 1 DATE: February 1986 l
COMPLETED BY: Frances Harrison OPERATIONS
SUMMARY
BRUNSWICK UNIT 1
. Brunswick Unit 1 operated at a 100 percent availability factor for the month of February with a 97.6 percent capacity factor. There were two power reductions.
Details are in the Unit Shutdowns and Power Reductions sheet. I l
l 'There are 840 BWR and 160 PWR spent fuel bundles in the Brunswick Unit 1 fuel
[ pool.
I l
l I
i *
\
h
DOCKET NO.
050-0325 UNITSHUTDOWNS AND POWER REDUCTIONS UNIT NAbdE Brunswick I .
DATE March 1986 REPORT h80 NTH February 1986 COhrLETED BY _ Frances Harrison TELEPHONE 919-457-9521 e e. =~. -. : 5
.2 E E E4 Licensee [*, ., Cause & Corrective
{3 No. Date g 3g ( .g g & Eient 3Y Action to
$E 5 jgg Reput # ,# G fu p,,,,,,g,c,,,,,,,
6 85-010 860215 F 0 .00 B 5 Performed scram time on one rod that had maintenance work done. ,
1 I 2 3 4 F: Forced Reason: heethod: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) l-heanual for Preparation. of Data B mi=a*==ce of Test 2-heanual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Repor (LER)FileINUREG-D-Regulatory Restriction 0161)
EOperator Training & Ucense Emanuaation 4-Continuations l
F-Administrative 5-Load Reductions 5 GOperational Error (Emplain) 6-Other Exhibit I .Same Source l'3/77) HOther(Emplain) i _, u" . . .- . . . _ . . _ _ . . . . _ . . . . . . . ..
DOCKET NO. 050-032s UNITSHUTDOWNS AND FOWER REDUCTIONS UNIT NAME Brunswicic T DATE March 1986 COtrl ETED gy Frances Harrison REPORT MONDg February 1986 TEI.ErlGONE 919-457-9521 l '
n.
e c_ r, t .. E C*" A C"'"C85
Ei "O
' 3 En Ed Action to l * $5 E Report a NG Prevent Recurrence 2E d :!! 6 6 .
t 1
I 86-009 860207 S 0.00 B 5 NA Reduced power for routine turbine, SV, CIV, and bypass valve testing. ,
t i
l i
I I 2 3 4 F: Forced Reason: Method; Exhibit G-Instructions S: Scheduled A-Equipenent Failure (Explain) 1-Manual for Preparation of Data l B-Mainsemance of Test ., 2-Manual Scram. Entry Sheets for Licensee l C-Refuetag 3-Autosnatic Scram. Event ReporilLERIFileINUREG-t D-Regulatory Restriction 0161) sM)perator Training & Ucense Exavanation 4-Continuations l
F-Administrative 5-Load Reductions 5 l GOperational Error (Explain) 6-Other Exhibit I - Same Source l'8/77) HOther(Explain)
N_-______________- _ _ _ _ __
.a - - - . ~ -
- 7. -
LCP&L.C0 PLANT PERFORMANCE DATA SYSTEM PAGE 2
'lWUN DATE' 03/04/06 1 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39 RUN TEME- 11:44:01 DRUNSWICK UNIT 2 DOCKET NO. 050-0324 COMPLETED DY FRANCES HARRISON TELEPHONE ( 919 ) 45'< -9521 FEDRUARY 1986 DAY AVG.' DAILY. POWER LEVEL DAY ~ AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET).
1 -4 17- -4 2 -4 10 -4 3 -5 19. -4 4 -5 20 -4 5 -4 21 -4 6 -4 22 -4 ,
7 -4 23 -4 0 -4 24 -4 9 -3 73 -4 10 -3 26 -4 11 -4 27 -4 12 -3 20 4 13- ' -3 14 -4 15 ~4 16 -4 r 1.16 - O t
-_ _ . . _ - . _ _._____________._._m___ ._m_--..___________ _ _ _ _ .
CPAL 60 .PLANTLPERFORMANCE DATA SYSTEM PACE 2 RUN'DATE~ 03/04/06' OPERATING DATA REPORT RPD36 RUNLTIME ti:44:02 BRUNSWICK UNIT 2 .
e .
DOCKET NO. 050-0324 i COMPLETED DY FRANCES HARRISON
- OPERATING STATUS TELEPHONE (919)457-9521 l
- i. UNIT.NAME!'DRUNSWICK UNIT 2 l NOTES l 2' REPORTING PERIOD: FEBRUARY. 86
. l l
- 3. LICENSED THERMAL POWER (MWT): 2436 l l
- 4. NAMEPLATE RATING-(GROSS'MWE): 867.0 l l 5.. DESIGN ELECTRICAL RATING (NET MWE): 821.0 l l
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE)? 015.0 l l i
- 7. MAX DEPENDADLE CAPACITY (NET MWE): 790.0 --------------------------- ---
0 ~. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE' REASONS: ,
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
l 10. REASONS FOR RESTRICTION IF ANY:
l THIS YR TO CUMUL MONTH DATE ATIVE
{
> .11. HOURS IN REPORTING' PERIOD 672.00 1416.00 90505.00
- 12. NUMBER OF HOURS REACTOR CRITICAL .00 .00 54512.36
- 13. REACTOR RESERVE GHUTDOWN HRS .00 .00 .00
- 14. HOURS GENERATOR ON LINE .00 .00 51011.09 l 15.. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
- 16. GROSS THERMAL ENERGY GEN. (MWH) .00 .00 90029072.53 ,
- 17. GROSS ELEC. ENERGY GEN. (MWH) .00 .00 32795404.00 4
- 18. NET ELEC. ENERGY GENERATED (MWH) -2651.00 -6201.00 31431798.00
- 19. UNIT SERVICE FACTOR .00 .00 56.36
- 20. UNIT AVAILABILITY FACTOR .00 .00 56.36
- 21. UNIT CAP. FACTOR (USING MDC NET) .50 .55 43.96
- 22. UNIT CAP. FACTOR (USING DER NET) .48 .53 42.30
- 23. UNIT FORCED OUTAGE RATE .00 .00 15.40
- 24. SHUTDOWNG SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIHATED DATE OF START UP: [
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORCAST ACHEIVED i
INITIAL CRITICALITY -------- ------~~
INITIAL ELECTRICITY - - - - - - - - --------
COMMERCIAL.0PERATION ~~~~~~~- --------
1.16 - 9
4 DOCKET NO.: 050-0324 UNIT: Brunswick 2 DATE: March 1986 COMPLETED BY: Frances Harrison i
OPERATIONS
SUMMARY
BRUNSWICK UNIT 2 The unit was removed from service on November 30, 1985, for the refueling /
maintenance outage.
There are *1168 BWR and 144 PWR spent fuel bundles in the Brunswick Unit 2 fuel pool. -
- 560 bundles have been moved to spent fuel during refueling.
I
[
P l
t k.
DOCKET NO. 050-0324 -
'JNIT SHUTDOWNS AND POWER REDUCTIONS
- UPWT nab 8E Brunswick TT DATE March 1986 REPORT 900 NTH February 1986 CORWLETED BY Frances H m* on TELErit0NE 919-457-952I
- jg 3 E Licensee ,Ev, *
. Cause & Corrective N. Diane g 3g 4 .3 s & Ev'ent g3 3 Action to U
f5 5 ggg Report a mO g Prevent Recurrence d '85-078 851130 S In C 4 NA RC FUELXX Refueling / Maintenance Outage.
Progresa ,
I 2 3 4 F: F.wced Reason: hierhod: Exhibit G - lastructions S: Scheduled A-Eq=paient Failure (Explain) 1-Manual for Preparation of Data B-tenintenance of Test 2-henaual Scram. Ents) Sheets for Licensee C-Refueling 3-Automatic Scram. Event Repsxt (LERI File (NUREG-D-Regulatory Restriction 0161)
E4)perator Training & Ucense Exarranation 4-Continuations F-Adaniastrative 5-Load Reductions 5 G4)perational Error (Emplain) 6-Other Exhibit I - Sanw Source (4/77) H4)ther (Emplain)
__ ___ r_ - - - - --
~
{ ,
Cp&L Carolina Power & Light Cor. t 'ny a
Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429 March 5, 1986 FILE: B09-13510C SERIAL: BSEP/86-0260 Mr. J. M. Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT UNITS 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 l
MONTHLY OPERATING REPORT l
Dear Mr. Taylor:
In accordance with Technical Spscification 6.9.1.6 for the Brunswick Steam Electric Plant, Units 1 and 2, Carolina Power & Light Company herewith submits the report of operating statistics and shutdown experience for the month of February 1986.
Very truly yours, d
C. R. Dietz, General Manager Brunswick Steam Electric Plant FH/mbh MSC/85-0014 Enclosures cc: Mr. M. R. Beebe Dr. J. N. Grace Mr. M. D. Hill ,
Mr. P. W. Howe Mr. C. F. Lassiter Mr. R. G. Oehl Ms. D. J. Vicks INPO
, '//