Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-456/97-01 & 50-457/97-01
ML20141K425
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 05/21/1997
From: Pederson C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Stanley H
COMMONWEALTH EDISON CO.
References
50-456-97-04, 50-456-97-4, 50-457-97-04, 50-457-97-4, NUDOCS 9705290104
Download: ML20141K425 (2)


See also: IR 05000456/1997001

Text

-

.

.

.

.

.

. . .

a

9

'

,

May 21, 1997

Mr. H. G. Stanley

'

Site Vice President

Braidwood Station

Commonwealth Edison Company

i

R.R. #1, Box 84

Braceville,IL 60407

'

SUBJECT:

NOTICE OF VIOLATION (NRC INSPECTION REPORTS 50-456/97004(DRS);

50-457/97004(DRS))

Dear Mr. Stanley:

This will acknowledge receipt of your letter dated April 28,1997, in response to

1

i

our letter dated April 8,1997, transmitting a Notica of Violation associated with the failure

to evaluate, document, and report to corporate and plant management the adequacy of

interface with the State government. We have reviewed your corrective actions and have

no further questions at this time. These corrective actions will be examined during future

,

inspections.

Sincerely,

/s/ Cynthia D. Pederson

Cynthia D. Pederson, Director

Division of Reactor Safety

Docket Nos. 50-456; 50-457

Licenses No. NPF-72; NPF-77

Enclosure:

Ltr dtd 4/28/97 H. G. Stanley

Braidwood to USNRC

r

See Attached Distribution

g

d

DOCUMENT NAME: G:DRS\\ BRA 97004.DRS

To receive a copy of this document, indicate in the box: "C" = Copy without

attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy =o

0FFICE

RIII

RJ.Il m/f

RIIItWehr

E RIII / F

l

NAME

RJickling:jpl/V

JCMF

RLanksbury

CPedhs'on

DATE

05//5 /97

U

05/7)o/97

~ 05/'}o /97

05/J /97

0FFICIAL RECORD COPY

f

9705290104 970521

'

I

PDR

ADOCK 05000456

l l llll]lfllllllll,llllllll,l

G

PDR

-

- .-

.

-

-

-

-

-

_=_

.

.

. - -

-

.--

.

e

H. G. Stanley

-2-

May 21,1997

cc w/o enci: T. J. Maiman, Senior Vice President,

'

Nuclear Operations Division

D. A. Sager, Vice President,

Generation Support

H. W. Keiser, Chief Nuclear

Operating Officer

T. Tulon, Station Manager

T. Simpken, Regulatory Assurance

Supervisor

1. Johnson, Acting Nuclear

Regulatory Services Manager

Document Control Desk - Licensing

cc w/ encl:

Richard Hubbard

,

Nathan Schloss, Economist,

i

l

Office of the Attorney General

i

State Liaison Officer

'

Chairman, Illinois Commerce Commission

Distribution:

!

Docket File w/ encl

Rlli PRR w/enci

J. L. Caldwell, Rllt w/enci

!

PUBLIC IE-35 w/ encl

SRis, Braidwood, Byron,

Rill Enf. Coordinator w/ encl

OC/LFDCB w/enci

Zion w/enct

R. A. Capra, NRR w/enci

DRP w/enci

LPM, NRR w/enci

TSS w/enci

!

DRS w/enci

CAA1 w/ encl

A. B. Beach, Rlli w/ encl

1

l

l

-

- . .

4\\o

...

Commonwealth liimn Compan)

firanlu ood 6tnerating Station

j

Route al, Il.n H #

%

lir.n es ille,11. m iONm19

Tel HI ks W.!801

1

1

April 28,1997

t

Document Control Desk

U.S. Nuclear Regulatory Commission

i

'

Washington, D.C. 20555

!

Subject:

Reply to Notice of Violation

NRC Inspection Report 50-456(457)/97004

Braidwood Nuclear Power Station Units I and 2

NRC Docket Numbers 50-456 and 50-457

l

Reference:

G. E. Grant letter to H.G. Stanley dated April 8,1997, transmitting

Notice of Violation from NRC Inspectian Repon 50-456(457)/97004

During the week of March 3,1997, an Emergency Preparedness (EP) Inspection was

conducted. The results from this inspection were documented in the referenced Inspection

Repon.

Overall, the results from the inspection were positive and indicated that

Braidwood's EP program has been effective. However, a problem was noted related to

the Station's failure to document the adequacy of the interface between the State

government and the Station. This resulted in a Severity Level IV violation which was

transmitted with the Inspection Report.

The concern identified during the audit period was immediately acted upon and an

evaluation of the interface between the Station and the State was conducted.

No

significant problems were communicated during these discussions.

The following commitment is included in the attached response:

The evaluation of the adequacy of the interface between the State Government and

l

Comed's six nuclear facilities will be included as a permanent audit checklist question

in Corporate Emergency Preparedness Audits.

q te QQ g

(l^{ M r/

f

m ,-_ n.m ,

wom

. _ _ _ _ . . _ . - .

_ _ . - - _ _ _ _ _ _ _ _ _ _ _ -

_ - _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . _ _ . _ _ _ _

,

.

,

-Q

\\

,h

Document Control Desk

C

Page 2

.

If your staff has any questions or comments concerning this letter, please refer them to

Terrence Simpkin, Braidwood Regulatory Assurance Supervisor, at (815) 458-2801,

extension 2980.

A

t

'

ene Stanley

ite Vice Presiden

Braidwood Nuclear Generating Station

Attachment

A.B. Beach, NRC Regional Administrator, Region III

cc:

G.F. Dick, Jr., Project Manager, NRR

C.J. Phillips, Senior Resident Inspector

F. Niziolek, Division ofEngineering, Office of Nuclear Safety, IDNS

c:confidsitevysortesp l 99797039 Ax

i

!

I

i

(

l

l

..

- - - .

-

-

.

. . - -

_.

-

--

..

l-

-

.

,

ATTACHMENT 1

,

s

REPLY TO NOTICE OF VIOLATION

VIOLATION (50-456(457)/97nn44 Q

10 CFR 50.54(t) requires that the 12 month review of the emergency preparedness

program shall include an evaluation for adequacy of interfaces with State and local

i

l

governments and oflicensee drills, exercises, capabilities, and procedures. The results of

l

the review, along with recommendations for improvements, shall be documented, reported

to the licensee's corporate and plant management, and retained for a period of five years.

Contrary to the above, Site Quality Verification Audit Report QAA-#20-96-05,

" Emergency Plan and Implementing Procedures," dated March 22,1996, the 12

month resiew of the emergency preparedness program did not include an

evaluation of the adequacy ofinterface with the State ofIllinois. (50-456/97004-01

and 50-457/97004-01)

i

i

REASON FOR THE VIOLATION

!

A documented evaluation of the adequacy of the interfaces between the State Government

and Braidwood Station was not done in the required twelve month time frame. Several

opportunities to document this interface were missed during that time period, including

two audits of the Emergency Preparedness (EP) Program. Observations made were either

not documented or the documentation did not reflect an evaluation of the interface.

During a Corporate Audit of the Emergency Preparedness Program, QAA # CE 96-03,

the audit team was aware of the requirement to evaluate the interface between State and

local governments and the nuclear facilities, however the team made a conscious decision

not to include this requirement in the audit scope because they believed this review would

,

be redundant. The audit team felt that each site satisfied this requirement in their site EP

l

Audits.

The audit scope for the Braidwood's Site Quality Verification Audit QAA # 20-96-05,

" Emergency Plan and Implementing Procedures," included a review of the adequacy of

interfaces with off-site agencies. The audit team's audit preparation notes referenced the

l

wording from 10CFR 50.54(t) to evaluate the adequacy of the interface between the

l

Station and State and local governments. However, when the audit checklist question and

l

method of verification (steps the auditor is to take to answer an audit checklist question)

l

for this requirement were written, the full scope of the regulatory requirement was not

l

reflected in the method of verification. The requirement to evaluate the interface between

l

the Station and State and local governments was replaced with evaluating the adequacy of

l

the interface between the Station and a sample of off-site agencies.

I

1

-.

_ -

--_

,-

.

.

{

ATTACHMENT 1

.

REPLY TO NOTICE OF VIOLATION

VIOL ATION (50-456(457)/97004-01)

CORRECTIVE ACTIONS TAKEN AND RESULTS ACHIEVED

Representatives from the Illinois Department of Nuclear Safety (IDNS) and the Illinois

Emergency hianagement Agency (IEh1A) were called on hiarch 6,1997. Individuals

from these agencies were asked questions taken from a questionnaire used during the site

audit to evaluate the adequacy of the interface between the Station and the State and local

governments.

No significant interface concerns were discussed during the phone

interviews.

l

l

ACTIONS TO PREVENT RECURRENCE

A discussion was held with the Audit Team Leader from the Corporate Audit Group to

l

determine appropriate corrective actions to prevent recurrence. It was decided that the

evaluation of the adequacy of the interface between the State Government and Comed's

six nuclear facilities would be included

a.= a permanent audit checklist question in

Corporate Emergency Preparedness Audits. A letter was sent to the Corporate Audit

Group to document the agreement made during the earlier discussion. This letter will be

placed in the audit preparation file at Corporate Nuclear Oversight. Each site remains

responsible for assessing the adequacy of the interface between the station and local

governments.

l

A tailgate was conducted with Site Quality Verification personnel regarding the

importance of documentation, including stating regulatory requirements in audit checklist

l

questions and in Field hionitoring Reports.

t

,

DATE WHEN COMPLIANCE WAS ACHIEVED

'

Compliance was achieved once the adequacy of the interface between Braidwood Station

and the State government was determined to be acceptable and this information was

properly documented.

2