Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000413/1986018 + (06:06:31, 24 May 2025)
- 05000423/LER-1997-055, :on 971105,discovered No Area Temp Monitoring within B & D Pump Recirculation Spray Sys Cubicle.Caused by Area Temp Monitoring Element Mounted in Wrong Location.Will Relocate Area Temp Monitor 3ECS-TE098 & Performed Walkdown + (06:06:36, 24 May 2025)
- A000122, Addendum 2 to Order 82-14 to NPDES Permit CA0001228,revising Order 82-14 to Reflect Change in Max Allowable Sewage Treatment Plant Flow for Facility,Issued to Southern California Edison Co + (06:06:38, 24 May 2025)
- ML20203D202 + (06:06:42, 24 May 2025)
- IR 05000324/1985040 + (06:06:55, 24 May 2025)
- ML20203D166 + (06:06:57, 24 May 2025)
- ML20203C998 + (06:08:10, 24 May 2025)
- ML20203C887 + (06:09:05, 24 May 2025)
- ML20203C867 + (06:09:16, 24 May 2025)
- 05000369/LER-1997-011, :on 971111,SSPS Surveillance Testing Was Noted to Be Inadequate.Caused by Inadequate Test Design Supplied by Vendor.Sps for Ssps Trains Were Revised + (06:10:30, 24 May 2025)
- TAC:57211 + (06:10:34, 24 May 2025)
- ML20203C577 + (06:10:55, 24 May 2025)
- IR 05000269/1985039 + (06:11:09, 24 May 2025)
- ML20203C468 + (06:11:31, 24 May 2025)
- ML20203C416 + (06:11:50, 24 May 2025)
- ML20203C263 + (06:12:36, 24 May 2025)
- ML20203C244 + (06:12:42, 24 May 2025)
- ML20203C161 + (06:13:05, 24 May 2025)
- L-99-009, Forwards Revised Response to NRC RAI Dtd 980320,to Clarify Measures That Exist or Have Been Taken to Assure,Containment Air Recirculation Coolers Will Not Be Used as Option to Mitigate Accident Conditions at Plant + (06:14:02, 24 May 2025)
- ML20203B980 + (06:14:11, 24 May 2025)
- IR 05000321/1986012 + (06:14:20, 24 May 2025)
- ML20203B927 + (06:14:35, 24 May 2025)
- IR 05000369/1986011 + (06:15:26, 24 May 2025)
- ST-HL-AE-4650, Forwards Insert to FSAR Section 14.2.2.8 Re Startup Personnel Qualifications.Two Yrs Related Experience for Level II Personnel W/Associate Degrees Required.Final Change Will Be Submitted W/Fsar Amend + (06:15:59, 24 May 2025)
- ML20203B700 + (06:16:05, 24 May 2025)
- 05000482/LER-1998-010, :on 981207,installation of Snubber with Defective Part Resulted in Violation of TS 3.7.8.Caused by Failure to Maintain Appropriate Tracking of Defective Part & Communication.Procedure Revised + (06:16:22, 24 May 2025)
- ML20203B563 + (06:16:59, 24 May 2025)
- 05000266/LER-1998-005, :on 980121,discovered That Control Rod Exercise Test Required Tech Specs Had Not Been Performed as Required. Caused Data Entry Error Into Computerized Maint Planning. Maint Planning Sys Revised + (06:17:29, 24 May 2025)
- 05000423/LER-1997-056, :on 971107,SWS Drainage Following Containment Depressurization Actuation & Loss of Power Resulted in Condition Outside Design Basis.Caused by Design Deficiency in Sws.Design Mod Will Be Implemented Prior to Mode 4 + (06:18:20, 24 May 2025)
- 05000346/LER-1998-007-01, Forwards LER 98-007-01,submitted to Provide Addl Info Re Corrective Actions Taken for Occurrence.Changes Marked with Rev Bar in Margin + (06:18:27, 24 May 2025)
- 05000282/LER-1998-003, :on 980122,routing of Containment Dome Fan Coil Unit Exhaust Dampers Control Circuit Wiring Contrary to Configuration Described in USAR Occurred.Investigation Produced No Conclusive Evidence for Cause.Procedure Revised + (06:18:42, 24 May 2025)
- TXX-9901, Forwards Comments on Draft SE Re Proposed Conversion to ISTS + (06:19:54, 24 May 2025)
- IR 05000320/1985099 + (06:20:02, 24 May 2025)
- 05000461/LER-1998-001, :on 970929,failure of Division 2 SR Battery Charger Was Noted.Caused by Deficient Supplier Soldered Connections.Insp of Division 1,2 & 4 SR Battery Chargers Are Complete & Have Been Reworked & Repaired + (06:20:04, 24 May 2025)
- ML20203B129 + (06:20:29, 24 May 2025)
- ML20203B076 + (06:20:52, 24 May 2025)
- 05000336/LER-1997-009-01, :on 970325,insufficient ESFAS Surveillance Testing,Per GL 96-01,noted.Caused by Inadequate Program to Ensure Sps Fully Implement TS Requirements.Operational Surveillances Will Be Revised + (06:21:13, 24 May 2025)
- IR 05000456/1997020 + (06:21:18, 24 May 2025)
- 05000499/LER-1998-001, :on 980115,failure to Meet TS Requirements for Inoperable Sdg 21 Noted.Caused by Failure of U3 Operational Amplifier in DG Voltage Regulator Circuit.Replaced Voltage Regulator Board for Sdg 21 & Complete Post Maint Test + (06:21:24, 24 May 2025)
- ML20203A932 + (06:21:37, 24 May 2025)
- ML20203A824 + (06:22:12, 24 May 2025)
- 05000423/LER-1998-004, :on 980114,EDG Intercoolant Coolers Were Not Capable of Meeting Design Criteria.Caused by Inadequate Implementation of GL 89-13 Section II Testing.Diesels Operability in Modes 5 & 6 Was Documented Via CAP + (06:22:42, 24 May 2025)
- ML20203A766 + (06:22:43, 24 May 2025)
- ML20203A755 + (06:22:46, 24 May 2025)
- IR 05000445/1997020 + (06:23:03, 24 May 2025)
- L-98-011, Annual Rept of Number of Personnel Receiving Greater than 100 Mrem & Associated Exposure by Work Function at BVPS for CY97 + (06:24:31, 24 May 2025)
- 05000254/LER-1998-007, :on 980115,design Basis of RB Superstructure Was Not in Literal Conformance W/Ufsar.Caused by Original FSAR Lacking Sufficient Detail Class I Loading Combinations. Operations Placed RB Overhead Crane OOS in Parked Position + (06:24:36, 24 May 2025)
- 05000302/LER-1997-041, :on 971110,discovered That Control Complex Chiller May Be Rendered Unavailable Due to Design Error in pre-1997 Mod.Will Implement Mod to Remove Subsequent Es Actuation Load Shedding Prior to Restart of Plant + (06:24:47, 24 May 2025)
- IR 05000321/1997009 + (06:25:12, 24 May 2025)
- ML20203A358 + (06:25:16, 24 May 2025)
- L-98-023, Informs That Util Received Results of Chemical Composition Analysis & Results Favorable Re Thermo-Lag 330-1 Fire Barrier Issues at Plant + (06:25:58, 24 May 2025)