Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-424/86-11 & 50-425/86-06.Response to Violations 1 & 3 Satisfactory. Supplemental Response to Violation 2 Re Welds Requested
ML20203C161
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 07/09/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
References
NUDOCS 8607180368
Download: ML20203C161 (3)


See also: IR 05000424/1986011

Text

Yll0u)

\\*

,

!

JUL9

1986

- Gporgia Power Company

MTTN: Mr. J. H. Miller, Jr.

President, Power Supply

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: REPORT NOS. 50-424/86-11 AND 50-425/86-06

Thank you for your response of May 23, 1986 to our Notices of Violation and

Deviation, issued on April 24, 1986, concerning activities conducted at your

Vogtle facility under NRC Construction Permit Nos. CPPR-108 and CPPR-109.

We

have evaluated your response and found it meets the requirements of 10 CFR 2.201

for violations 1 and 3.

We will examine the implementation of your corrective

actions for Violations 1 and 3 during future inspections.

With regard to Violation 2, we request that you provide a supplementary response

addressing the following questions:

(1) What will be your action to correct the undersize conditions identified

for the subject welds?

(2) When repairs were made to correct the undercut, slag and arc strikes

,

which you previously discovered, was weld material removed and should

there have been a weld size examination performed?

(3) Your response indicates that the only previous deficiencies identified

at the site on the vessel welds were identified in receipt inspection.

Is this correct?

Our review suggested that vessel weld deficiencies

had been discovered during other inspections.

We have performed a preliminary review of your denial of the Deviation. We still

have the matter under review and will inform you of our decision at a later date.

We appreciate your cooperation in this matter.

Sincerely,

CRIS;;;Al. S!GilED BY:

J. HELSON GRACE

J. Nelson Grace

Regional Administrator

cc:

(See page 2)

8607180368 860709

PDR

ADOCK 05000424

i a

G

PDR

IEol

-..

N

,

Georgia Power Company

2

JUL 9

1986

cc: -- R. E. Conway, Senior Vice President &

Project Director

-D. O. Foster, Vice President, Project

Support

- P. D. Rice, Vice President, Project

Engineering

-R. H. Pinson, Vice President, Project

Construction

-J. T. Beckham, Vice President &

General Manager - Operations

R. A. Thomas, Vice President,

Licensing

- D. S. Read, General Manager,

Quality Assurance

vC. W. Hayes, Vogtle Quality

Assurance Manager

vW. C. Ramsey, Manager -

Readiness Review

A . B. Bockhold, General A nager,

Nuclear Operations

4. Gucwa, Manager, Nuclear Safety

and Licensing

yM. H. Googe, Project

Construction Manager

vE. D. Groover, Quality

Assurance Site Manager -

Construction

W . A. Bailey, Project Licensing

Manager

vG. F. Trowbridge, Esq., Shaw,

, Pittman, Potts and Trowbridge

"B. W. Churchill, Esq., Shaw,

Pittman, Potts and Trowbridge

vf. L. Blake, Jr. , Esq. , Shaw,

Pittman, Potts and Trowbridge

J . E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

/ J. G. Ledbetter, Commissioner,

Department of Human Resources

<C. H. Badger, Office of Planning

and Budget

vD. Kirkland, III, Counsel,

Office of the Consumer's Utility

Council

J C. Teper, Georgians Against

, Nuclear Energy

"M. B. Margulies, Esq., Chairman,

Atomic Safety and Licensing Board

Panel

(cc cont'd - see page 3)

. .-

\\

-

job 9

100b

Georgia Power Company

3

(cccont'd)

vDr. 0. H. Paris, Administrative Judge-

Atomic Safety and Licensing Board

Panel

A A. Linenberger, Jr., Administrative Judge

Atomic Safety and Licensing Board

Panel

J'. P. Garde, Citizens Clinic, Director

Government Accountability Project

,

bec:J . Reis, ELD

vW. M. Hill, IE

vM. Miller, NRR

vW. Brach, ED0

.M. Sinkule, RII

vE. Christnot, RII

,NRC Resident Inspector

Document Control Desk

State of Georgia

..

l

RII

RII

RII

RII

RII h ,),

{y/(g.-

GMPP

)

EGirard:er

JBlake

AHerut

VP pciera

VBrownlee

avgs

06/9f/86

06/vf/86

06 gT/86

0 /\\2 86

06/g 86 .

6

y

(y J e rf!"

kW

\\

7///86

'7i 9 Je6

\\