Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19345B006 + (15:33:03, 24 December 2024)
- ML19345B005 + (15:33:04, 24 December 2024)
- ML19345B003 + (15:33:05, 24 December 2024)
- ML19345B002 + (15:33:08, 24 December 2024)
- ML19345A998 + (15:33:09, 24 December 2024)
- ML19345A997 + (15:33:10, 24 December 2024)
- ML19345A996 + (15:33:11, 24 December 2024)
- ML19345A995 + (15:33:12, 24 December 2024)
- ML19345A994 + (15:33:12, 24 December 2024)
- ML19345A993 + (15:33:13, 24 December 2024)
- 05000249/LER-1980-037-03, /03L-0:on 801020,during Normal Operation W/Dis 500-2 in Progress,Level Switch LIS 263-57B Was Found to Trip at Differential Pressure Less than Tech Specs.Caused by Instrument Drift.Instrument Readjusted + (15:33:15, 24 December 2024)
- 05000320/LER-1980-048-03, /03L-0:on 801017,after Sampling a Core Flood Tank, Inner Containment Isolation Valve CF-V115 Failed to Close. Apparently Caused by Motor & Control Circuits Grounding Out, Induced by Water Leakage.Valve Closed & Deactivated + (15:33:18, 24 December 2024)
- PNO-I-80-168, on 801117,reactor Tripped Due to Low Steam Pressure Signal.Caused by Placing Wrong Channel in Trip When Intermittent Fault Became Evident on Another Instrument. Outage Expected to Last Two Days for Reboration & Repairs + (15:33:21, 24 December 2024)
- 05000320/LER-1980-048, Forwards LER 80-048/03L-0 + (15:33:23, 24 December 2024)
- ML19345A984 + (15:33:24, 24 December 2024)
- PNO-I-80-167, on 800929,State of Nj Dept of Environ Protection Received Ltr from Citizen Complaining of Radioactive Contamination Along Route 17,Rochelle,Park,NJ. Th-232 & Ra-226 Confirmed in 801008 & 20 Soil Samples + (15:33:26, 24 December 2024)
- 05000219/LER-1980-049-01, /01T-0:on 801105,when Isolation Condenser B Was Removed from Svc to Repair Steam Leak,Vent Isolation Valves V-14-1 & V-14-19 Apparently Failed to Close.Cause Undertermined.Stem Packing Replaced & Tested + (15:33:28, 24 December 2024)
- 05000219/LER-1980-049, Forwards LER 80-049/01T-0 + (15:33:29, 24 December 2024)
- ML19345A979 + (15:33:31, 24 December 2024)
- ML19345A978 + (15:33:32, 24 December 2024)
- 05000334/LER-1980-077-01, /01T-0:on 801114,overstress Condition Determined to Exist on Main Steam Line Branch Line Support.Caused by Thermal Movement of Main Steam Line Affecting Branch Line Support.Pipe Support Rod Completed + (15:33:33, 24 December 2024)
- 05000334/LER-1980-077, Forwards LER 80-077/01T-0 + (15:33:35, 24 December 2024)
- ML19345A974 + (15:33:36, 24 December 2024)
- 05000219/LER-1980-048-03, /03L-0:on 801029,during Functional Testing,Snubber 23-7 Failed to Lock Up in Tension Direction.Cause Unknown. Snubber Replaced + (15:33:37, 24 December 2024)
- ML19345A972 + (15:33:38, 24 December 2024)
- ML19345A970 + (15:33:39, 24 December 2024)
- 05000267/LER-1980-067-01, /01T-0:on 801107,tritium Concentration Exceeded Limit Specified in LC04.8.24.8.2(a).Caused by Inadequate Deviation 80-445 to Surveillance Procedure SR 5.8.2bc-M. Procedure & Design Changes Under Investigation + (15:33:43, 24 December 2024)
- 05000219/LER-1980-048, Forwards LER 80-048/03L-0 + (15:33:46, 24 December 2024)
- 05000324/LER-1980-084-03, /03L-0:on 801024,containment Atmosphere Dilution Tank Flow Control Valves 2-CAC-FCV-2717 & 2720 Would Not Operate.Caused by Accumulation of Water in Electropneumatic Converter of Valve 2720.Water Removed + (15:33:48, 24 December 2024)
- 05000267/LER-1980-067, Forwards LER 80-067/01T-0 + (15:33:49, 24 December 2024)
- 05000324/LER-1980-085-03, /03L-0:on 801024,containment Atmosphere Dilution Sys Valves 2-CAD-V55 & 56 Would Not Fully Open.Caused by Deformed Stem Seals in Each Valve Operator.New Stem Seals Installed + (15:33:52, 24 December 2024)
- 05000324/LER-1980-084, Forwards LER 80-084/03L-0 + (15:33:55, 24 December 2024)
- 05000324/LER-1980-085, Forwards LER 80-085/03L-0 + (15:33:57, 24 December 2024)
- 05000325/LER-1980-076-03, /03L-0:on 801022,primary Containment Oxygen Analyzer 1-CAT-AT-1259-2 Observed Indicating Upscale.Caused by Failed Magnetic Analyzer Sample Cell.Magnetic Unit Replaced & Analyzer Returned to Satisfactory Operation + (15:34:00, 24 December 2024)
- 05000325/LER-1980-076, Forwards LER 80-076/03L-0 + (15:34:01, 24 December 2024)
- 05000285/LER-1980-027-03, /03L-0:on 801027,during Monthly Ac Sequencer Timer Test,Timer FW-6 on Sequencer S1-2 Failed to Time Out within Prescribed Limit.Caused by Sticky Operating Mechanism.Timer Replaced W/Spare + (15:34:05, 24 December 2024)
- 05000334/LER-1980-078-01, /01T-0:on 801114,determined That,If Safety or Relief Valves Challenged W/Water Loop Seals on Inlet, Downstream Piping Could Be Overstressed.Caused by Inadequate Design.Loop Seal Drains Installed + (15:34:07, 24 December 2024)
- AECM-80-286, Second Interim Deficiency Rept Re Procedural Violation in Cutting Rebar,Initially Reported on 800602.Constructor Issued Stop Work Order.Method to Evaluate Unlogged Cut Rebar Is Being Developed.Final Rept Will Be Provided by 810801 + (15:34:09, 24 December 2024)
- 05000285/LER-1980-027, Forwards LER 80-027/03L-0 + (15:34:12, 24 December 2024)
- 05000344/LER-1980-021-03, During Temporary Plant Test,C Main Steam Isolation Valve Did Not Fully Close. Caused by Component Failure.Test Completed Successfully & Valve Closed + (15:34:14, 24 December 2024)
- 05000334/LER-1980-078, Forwards LER 80-078/01T-0 + (15:34:18, 24 December 2024)
- ML19345A944 + (15:34:19, 24 December 2024)
- 05000327/LER-1980-173-01, /01T-0:on 801105,potential Discovered for Line Failure During Seismic Event Due to Missing Hangers on Component Cooling Water Supply Piping to Centrifugal Charging Pump Mechanical Seals.Caused by Drawing Omission + (15:34:21, 24 December 2024)
- ML19345A942 + (15:34:22, 24 December 2024)
- 05000327/LER-1980-173, Forwards LER 80-173/01T-0 + (15:34:25, 24 December 2024)
- ML19345A937 + (15:34:26, 24 December 2024)
- 05000324/LER-1980-087-03, /03L-0:on 801025,w/diesel Generator 2 Out of Svc for Maint,Generator 3 Failed to Start within Required 10-s. Caused by Defective Check Valve in Diesel 3 Fuel Oil Supply Line.Check Valve Replaced + (15:34:33, 24 December 2024)
- ML19345A930 + (15:34:35, 24 December 2024)
- 05000324/LER-1980-087, Forwards LER 80-087/03L-0 + (15:34:36, 24 December 2024)
- 05000296/LER-1980-043-03, /03L-0:on 801019,flow Bias Circuitry of Average Power Range Monitor High Flux Drifted High & Declared Inoperative.Caused by Water from Removal of RHR Heat Exchanger Head Draining on Panel 25-7,shorting Out Leads + (15:34:38, 24 December 2024)
- 05000324/LER-1980-088-03, /03L-0:on 801028,during Checks on Reactor Low Water Level Numbers 2 & 3,found Low Level Switch 2-B21-LIS-N031D-3 Actuated at 118 Inches of Water.Caused by Instrument Drift.Switch Recalibr + (15:34:40, 24 December 2024)