Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19350D687 + (00:25:23, 24 December 2024)
- ML19350D686 + (00:25:24, 24 December 2024)
- ML19350D685 + (00:25:25, 24 December 2024)
- ML19350D683 + (00:25:26, 24 December 2024)
- ML19350D682 + (00:25:27, 24 December 2024)
- ML19350D680 + (00:25:28, 24 December 2024)
- ML19350D681 + (00:25:28, 24 December 2024)
- PNO-V-81-027, on 810511,while Preparing to Detension Pressure Vessel Studs,Detensioning Device Fell,Striking Workman on Arm & Leg.Contaminated Spot Identified.Workman Decontaminated + (00:25:30, 24 December 2024)
- ML19350D678 + (00:25:31, 24 December 2024)
- ML19350D677 + (00:25:33, 24 December 2024)
- ML19350D676 + (00:25:33, 24 December 2024)
- ML19350D673 + (00:25:34, 24 December 2024)
- ML19350D674 + (00:25:34, 24 December 2024)
- ML19350D672 + (00:25:35, 24 December 2024)
- 05000324/LER-1981-043-03, /03L-0:on 810411,primary Containment Atmospheric Monitor Oxygen Analyzer Tripped & Would Not Remain Running When Restarted.Caused by Failure of Photocell Light Due to Moisture Buildup in Monitor Photohelic Unit + (00:25:36, 24 December 2024)
- 05000325/LER-1981-041-03, /03L-0:on 810411,primary Containment Atmospheric Monitor Oxygen analyzer,1-CAC-ATH-1259-2,tripped.Caused by Indicated Low Sample Flow Due to Monitor Sample Line Moisture Buildup in Photohelic Unit.Lines Dried + (00:25:41, 24 December 2024)
- 05000260/LER-1980-053-03, Discovered Leak on Heat Exchanger During Steady State Operation.Caused by Leaking Inner Head Gasket on RHR Heat Exchanger Due to Loose Flange Nuts.Gasket Replaced & New Nuts W/Locking Tabs Installed + (00:25:43, 24 December 2024)
- ML19350D668 + (00:25:46, 24 December 2024)
- 05000366/LER-1981-034-03, /03L-0:on 810422,reactor Core Isolation Cooling Suppression Chamber Area Differential Temp Switch 2E51-N604B Was Found to Actuate Higher than Tech Spec Requirements. Caused by Setpoint Drift.Switch Recalibr + (00:25:48, 24 December 2024)
- ML19350D665 + (00:25:49, 24 December 2024)
- 05000293/LER-1981-013-04, /04T-0:on 810430,rept Received from Yankee Atomic Lab Re High Concentration of Co-60 in Irish Moss Sample Taken on 810218.Probably Caused by Fallout from Recent Atmospheric Weapons Tests + (00:25:50, 24 December 2024)
- 1CAN058105, Forwards Revised Response to Notice of Violation from IE Insp Rept 50-313/81-05 on 810223-25.Corrective Actions: Procedures Will Be Revised to Provide Controlled Environ Controls + (00:25:51, 24 December 2024)
- 05000306/LER-1981-005-03, /03L-0:on 810423,containment Vacuum Breakers Test Sp 2130 Was Discovered to Not Have Been Performed.Caused by Personnel Oversight.Preheatup Surveillance Test Scheduling Will Be Changed + (00:25:54, 24 December 2024)
- 05000306/LER-1981-005, Forwards LER 81-005/03L-0 + (00:25:55, 24 December 2024)
- 05000327/LER-1981-045-03, /03L-0:on 810409,auxiliary Feedwater Pump Tripped on Overspeed During Surveillance Test.Apparently Caused by Drift in Electronics of Speed Controls for Turbine.Turbine Adjusted,Started & Verified to Operate Properly + (00:25:57, 24 December 2024)
- 05000327/LER-1981-045, Forwards LER 81-045/03L-0 + (00:25:59, 24 December 2024)
- 05000260/LER-1981-018-03, /03L-0:on 810418,xenon Transient Observed Following Control Rod Sequence Exchange.Caused by Earlier Load Reduction in Conjunction W/New Control Rod Pattern. Control Rods Inserted & R Factor Brought within Limits + (00:26:01, 24 December 2024)
- 05000260/LER-1981-018, Forwards LER 81-018/03L-0 + (00:26:03, 24 December 2024)
- ML19350D653 + (00:26:04, 24 December 2024)
- ML19350D652 + (00:26:05, 24 December 2024)
- ML19350D650 + (00:26:05, 24 December 2024)
- ML19350D649 + (00:26:06, 24 December 2024)
- ML19350D648 + (00:26:07, 24 December 2024)
- A01617, Comments on NRC Draft Evaluation of SEP Topic XV-20, Radiological Consequences of Fuel Damaging Accidents, for Facility.Util Concurs W/Balance of Evaluation.Forwards Revision 2 of Operating Procedure NOP 2.15-3-C + (00:26:08, 24 December 2024)
- ML19350D645 + (00:26:10, 24 December 2024)
- ML19350D643 + (00:26:11, 24 December 2024)
- ML19350D640 + (00:26:13, 24 December 2024)
- ML19350D639 + (00:26:14, 24 December 2024)
- ML19350D638 + (00:26:15, 24 December 2024)
- ML19350D637 + (00:26:15, 24 December 2024)
- ML19350D636 + (00:26:16, 24 December 2024)
- ML19350D634 + (00:26:17, 24 December 2024)
- ML19350D631 + (00:26:19, 24 December 2024)
- 05000334/LER-1981-031, Forwards LER 81-031/01T-0 + (00:26:20, 24 December 2024)
- ML19350D627 + (00:26:21, 24 December 2024)
- 05000293/LER-1981-013, Forwards LER 81-013/04T-0 + (00:26:22, 24 December 2024)
- ML19350D622 + (00:26:23, 24 December 2024)
- 05000366/LER-1981-034, Forwards LER 81-034/03L-0 + (00:26:24, 24 December 2024)
- 05000260/LER-1980-053, Forwards Updated LER 80-053/03X-1 + (00:26:26, 24 December 2024)
- 05000324/LER-1981-043, Forwards LER 81-043/03L-0.Detailed Event Analysis Encl + (00:26:28, 24 December 2024)
- 05000325/LER-1981-041, Forwards LER 81-041/03L-0 + (00:26:29, 24 December 2024)