Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19350E087 + (00:18:12, 24 December 2024)
- ML19350E086 + (00:18:13, 24 December 2024)
- ML19350E085 + (00:18:17, 24 December 2024)
- ML19350E084 + (00:18:20, 24 December 2024)
- ML19350E083 + (00:18:21, 24 December 2024)
- ML19350E082 + (00:18:22, 24 December 2024)
- ML19350E081 + (00:18:23, 24 December 2024)
- ML19350E079 + (00:18:24, 24 December 2024)
- ML19350E078 + (00:18:25, 24 December 2024)
- ML19350E077 + (00:18:26, 24 December 2024)
- IR 05000286/1981001 + (00:18:37, 24 December 2024)
- ML19350E075 + (00:18:38, 24 December 2024)
- 05000346/LER-1981-029-03, /03L-0:on 810512,reactor Coolant Pump 2-1 Was Stopped After Operators Noted That Pump Seal Return Temp Had Risen in Excess of 165 F.Caused by Component Failure of Mechanical Seal Cartridge + (00:18:40, 24 December 2024)
- ML19350E072 + (00:18:42, 24 December 2024)
- ML19350E070 + (00:18:43, 24 December 2024)
- 05000346/LER-1981-029, Forwards LER 81-029/03L-0 + (00:18:44, 24 December 2024)
- ML19350E067 + (00:18:46, 24 December 2024)
- 05000272/LER-1981-049-03, /03L-0:on 810518,Action Statement 3.6.1.3a Was Entered Due to Elevation 100-ft Containment Air Lock Being Inoperable.Caused by Damaged Inner Door Latching Mechanism Cam Rollers Due to Large Number of Operations + (00:18:47, 24 December 2024)
- AECM-81-187, Advises That Response to IE Bulletin 79-27 Re Loss of non-Class IE Instrumentation & Control Power Sys Bus During Operation Will Be Submitted by 810731 + (00:18:49, 24 December 2024)
- ML19350E063 + (00:18:51, 24 December 2024)
- 05000272/LER-1981-049, Forwards LER 81-049/03L-0.Detailed Event Analysis Encl + (00:18:52, 24 December 2024)
- 05000260/LER-1981-024-03, /03L-0:on 810519,equipment Airlock Doors 237 & 238 Were Opened Simultaneously Resulting in Breach of Secondary Containment.Caused by Electric Strike Failure on Door 238 Due to Improperly Aligned Solenoid.Solenoid Realigned + (00:18:57, 24 December 2024)
- 05000272/LER-1981-045-03, /03L-0:on 810429,Action Statement 3.3.1.1 Was Entered Due to High Voltage Intermittently Cutting in & Out in Source Range-N-31 Detector Channel.Caused Undetermined. Supplemental Rept Will Be Issued in Case of Reoccurrence + (00:18:59, 24 December 2024)
- W3P81-1466, Forwards Response to Formal Question 231.21 & SER Open Item 50 Which Appears in Draft SER Section 4.2.2 + (00:19:00, 24 December 2024)
- 05000327/LER-1981-056-03, /03L-0:on 810511,train a of Auxiliary Bldg Gas Treatment Sys Was Declared Inoperable.Caused by ABGTS Fan Bearings Overheating.Bearings Replaced & Maint Program Established to Lubricate Bearings Semiannually + (00:19:03, 24 December 2024)
- 05000272/LER-1981-045, Forwards LER 81-045/03L-0.Detailed Event Analysis Encl + (00:19:04, 24 December 2024)
- 05000260/LER-1981-024, Forwards LER 81-024/03L-0 + (00:19:06, 24 December 2024)
- 05000346/LER-1981-030-03, /03L-0:on 810512,axial Power Imbalance Limit Exceeded.Caused by Procedural Inadequacy.Procedures ST 5042.02 & EP 1205.16 Have Been Modified + (00:19:11, 24 December 2024)
- W3P81-1450, Forwards Response to Structural Engineering Branch Concern Addressed in Draft SER Section 3.8.2 Re Evaluation of Local Stresses in Steel Containment Shell + (00:19:12, 24 December 2024)
- 05000260/LER-1981-023-01, /01T-0:on 810527,pressure Switches PS-1-81A,B & PS-1-91A,B Were Found Above Tech Spec Limit.Caused by Setpoint Drift.Switches Reset.Design Change Requested to Replace Switches + (00:19:15, 24 December 2024)
- 05000327/LER-1981-056, Forwards LER 81-056/03L-0 + (00:19:17, 24 December 2024)
- ML19350E044 + (00:19:19, 24 December 2024)
- 05000368/LER-1981-019, Forwards LER 81-019/03L-0 + (00:19:24, 24 December 2024)
- 05000346/LER-1981-030, Forwards LER 81-030/03L-0 + (00:19:25, 24 December 2024)
- W3P81-1461, Forwards Responses to Questions 810.22-810.24,to Address SER Open Item 56.Responses Will Be Provided in Next FSAR Amend Scheduled for 810619 + (00:19:27, 24 December 2024)
- 05000296/LER-1981-024-03, /03L-0:on 810514,HPCI Turbine Tripped on Overshoot During Fast Start Test.Caused by Loose Cable Connector at Egr Actuator Preventing Proper Egr Operation.Connectors Tightened + (00:19:32, 24 December 2024)
- 05000260/LER-1981-023, Forwards LER 81-023/01T-0 + (00:19:37, 24 December 2024)
- ML19350E034 + (00:19:42, 24 December 2024)
- IR 05000289/1981006 + (00:19:44, 24 December 2024)
- 05000296/LER-1981-024, Forwards LER 81-024/03L-0 + (00:19:46, 24 December 2024)
- ML19350E027 + (00:19:47, 24 December 2024)
- ML19350E028 + (00:19:47, 24 December 2024)
- ML19350E026 + (00:19:48, 24 December 2024)
- ML19350E022 + (00:19:49, 24 December 2024)
- ML19350E019 + (00:19:51, 24 December 2024)
- IR 05000354/1981005 + (00:19:54, 24 December 2024)
- ML19350E017 + (00:19:55, 24 December 2024)
- ML19350E012 + (00:19:56, 24 December 2024)
- ML19350E011 + (00:19:57, 24 December 2024)
- ML19350E010 + (00:19:58, 24 December 2024)
- ML19350E008 + (00:19:59, 24 December 2024)