Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20002E233 + (20:13:48, 23 December 2024)
- ML20002E232 + (20:13:49, 23 December 2024)
- ML20002E229 + (20:13:51, 23 December 2024)
- ML20002E228 + (20:13:52, 23 December 2024)
- ML20002E227 + (20:13:52, 23 December 2024)
- ML20002E226 + (20:13:53, 23 December 2024)
- 05000321/LER-1981-001-01, /01T-0:on 801228,HPCI Steam Line Pressure Switches 1E41-N001a,c,d Actuated Outside Tech Specs.Caused by Switch Setpoint Drift.Switches Recalibr + (20:13:55, 23 December 2024)
- ML20002E222 + (20:13:56, 23 December 2024)
- ML20002E224 + (20:13:56, 23 December 2024)
- ML20002E221 + (20:13:57, 23 December 2024)
- ML20002E219 + (20:13:58, 23 December 2024)
- ML20002E215 + (20:13:59, 23 December 2024)
- ML20002E217 + (20:13:59, 23 December 2024)
- 05000219/LER-1980-061-03, /03L-0:on 801217,snubbers - 19/11,19/12 & 19-13 on Containment Spray & Core Spray Sys Common Suction Header Failed to Lock Up in Compression Mode.Caused by Main Piston Seal Failures.Snubbers Replaced + (20:14:01, 23 December 2024)
- ML20002E213 + (20:14:02, 23 December 2024)
- 05000249/LER-1980-045-03, /03L-0:on 801219,drywell Spray Header Outboard Isolation Valve Did Not Close from Control Room.Probably Caused by Stuck Plunger on Closing Coil of Valve Motor Breaker.Plunger Freed by Moving Closing Coil by Hand + (20:14:03, 23 December 2024)
- ML20002E211 + (20:14:04, 23 December 2024)
- ML20002E210 + (20:14:05, 23 December 2024)
- ML20002E209 + (20:14:05, 23 December 2024)
- ML20002E207 + (20:14:06, 23 December 2024)
- ML20002E208 + (20:14:06, 23 December 2024)
- ML20002E206 + (20:14:07, 23 December 2024)
- ML20002E204 + (20:14:07, 23 December 2024)
- ML20002E203 + (20:14:08, 23 December 2024)
- ML20002E201 + (20:14:11, 23 December 2024)
- ML20002E199 + (20:14:12, 23 December 2024)
- ML20002E198 + (20:14:13, 23 December 2024)
- 05000321/LER-1980-124-03, /03L-0:on 801228,control Room Air Intake Isolation Valve 1Z41-F012 Failed to Close in Required Time.Caused by Faulty Pilot Solenoid Operator.Pilot Solenoid Replaced + (20:14:14, 23 December 2024)
- ML20002E195 + (20:14:15, 23 December 2024)
- ML20002E194 + (20:14:16, 23 December 2024)
- ML20002E193 + (20:14:16, 23 December 2024)
- 05000321/LER-1980-123-03, /03L-0:on 801219 & 801226,turbine Trip & Throttle Valve on Reactor Core Isolation Cooling Sys Failed.Failures Caused by Gall on Valve Poppet & Body & Improper Limit Switch Setting.Gall Removed & Switch Reset + (20:14:18, 23 December 2024)
- ML20002E191 + (20:14:18, 23 December 2024)
- ML20002E189 + (20:14:20, 23 December 2024)
- ML20002E188 + (20:14:20, 23 December 2024)
- ML20002E187 + (20:14:21, 23 December 2024)
- 05000321/LER-1980-123, Forwards LER 80-123/03L-0 + (20:14:22, 23 December 2024)
- ML20002E183 + (20:14:23, 23 December 2024)
- ML20002E184 + (20:14:23, 23 December 2024)
- ML20002E182 + (20:14:24, 23 December 2024)
- 05000321/LER-1981-001, Forwards LER 81-001/01T-0 + (20:14:25, 23 December 2024)
- ML20002E179 + (20:14:26, 23 December 2024)
- ML20002E177 + (20:14:27, 23 December 2024)
- ML20002E178 + (20:14:27, 23 December 2024)
- 05000219/LER-1980-061, Forwards LER 80-061/03L-0 + (20:14:28, 23 December 2024)
- ML20002E174 + (20:14:29, 23 December 2024)
- ML20002E172 + (20:14:30, 23 December 2024)
- ML20002E173 + (20:14:30, 23 December 2024)
- ML20002E171 + (20:14:31, 23 December 2024)
- ML20002E170 + (20:14:32, 23 December 2024)
- ML20002E169 + (20:14:32, 23 December 2024)