Interim Deficiency Rept,Originally Reported on 801024,re Advertent Boron Dilution Event at Shutdown Conditions on RHR Sys.Final Rept Will Be Issued After Westinghouse Completes Investigation & long-term Solution Has Been Evaluated
ML20002E188
Person / Time
Site: Summer 
Issue date: 01/16/1981
From: Nichols T
SOUTH CAROLINA ELECTRIC & GAS CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8101260607
Download: ML20002E188 (2)


Text

~

,4 w

_4.: <.

  • SOUTH CAROUNA ELECTRIC a GAS COMPANY

+

., o,,.c c..

]

cotumeia, sourn camoun4 assis I

T.C.NicMcLs Jn.

January 16, 1981 a

v=.

m o, o.com.

noc6 o -

f

~

1 l

Mr. James P. O'Reilly U. S. Nuclear Regulatory Commission U,

e Region II, Suite 3100 101 Marietta Street, N.W.

Atlanta, Georgia 30303 Subj ect: Virgil C. Summer Nuclear Station Docket No. 50/395 l

Reportable Item in Accordance with 10CFR21 I

Inadvertent Boron Dilution 4

Dear Mr. O'Reilly:

On October 24, 1980, South Carolina Electric & Gas Company (SCE&G) informed NRC of a substantial safety hazard concerning the potential for an inadvertent boron dilution event at cold or hot shutdown conditions while on the Residual Heat Removal System. A boron dilution results in a reactivity addition which could lead to a loss of shutdown margin and cause a substantial safety hazard as defined by 10CFR21. Under the SCE&G program, we reported this as a signif-icant deficiency under 10CFR50.55(e).

f On November 20, 1980, SCE&G submitted an interim report on this item.

At-tachment A of this report presented a discussion of the Westinghouse concerns and recommended actions. Appendix A of Attachment A presented two methods for locising out reactor makeup water supply. There are some incorrect valve number-listed in these methods.

In Item 1, valve 8457 is incorrect and should be

,I designated as valve 8430.

In Item 2, valve FCV-114A is incorrect and should be designated as valve FCV-168A.

s A final report will be issued after the Westinghouse investigation is completed and the long-term solution has been evaluated.

If you have any questions concerning this report, please call me.

Very truly yours, f

f x

T. C. Nichols, Jr.

BSM:TCN:gib cc: Page Two

\\

e

p-Mr. James P. O'Reilly January 16, 1981 Page Bro cc:

B. A. Bursey V. ' C. Sunener G.

H.~ Fischer W. A. Williams, Jr.

T. C. Nichals, Jr.

E. H. Crews, Jr.

D. A. Nauman O. S. Bradham O. W. Dixon, Jr.

J. B. Knotts, Jr.

R. B. Clary i

A. R. Koon A. A. Smith J. L. Skolds I&E (Washington) t t

Document Management Branch (55e/21/LER Only)

NPCF/Whitaker File t

1 l.

-