Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20009C330 + (06:12:49, 23 December 2024)
- 05000369/LER-1981-086-01, /01T-0:on 810529,during Mode 4 Initial Fuel Loading,Both Trains of Control Room Ventilation Sys Were Inoperable.Caused by Procedural Error.Hepa Filters Retested & Declared Operable.Shift Supervisors Have Been Cautioned + (06:12:51, 23 December 2024)
- ML20009C328 + (06:12:52, 23 December 2024)
- ML20009C327 + (06:12:53, 23 December 2024)
- 05000369/LER-1981-084-01, /01T-0:on 810526,during Mode 5 Initial Fuel Loading & Check Valve Testing,Soft Seats on Containment Isolation Valves Were Damaged.Caused by Reverse Pressurization.Damaged Seat Disc Assembly Will Be Replaced + (06:12:55, 23 December 2024)
- 05000369/LER-1981-086, Forwards LER 81-086/01T-0.Detailed Event Analysis Encl + (06:12:56, 23 December 2024)
- 05000270/LER-1981-009-03, /03L-0:on 810415,during Low Pressure Svc Water Pump Periodic Test,Valves 2LPSW-19 & 2LPSW-21 Were Closed Resulting in RB Rbcu Being Out of Svc.Caused by Personnel Error.Valve 2LPSW-19 Opened & Personnel Counseled + (06:12:58, 23 December 2024)
- 05000251/LER-1981-001, Forwards LER 81-001/03L-0 + (06:13:01, 23 December 2024)
- IR 05000282/1981012 + (06:13:03, 23 December 2024)
- ML20009C318 + (06:13:05, 23 December 2024)
- 05000339/LER-1980-105-03, /03L-0:on 801226,w/Unit 2 at 99.5% Power Turbine First Stage Pressure Channel Failed.Caused by Frozen Transmitter.Ventilation & Heating Problems Corrected & Channel Returned to Svc + (06:13:06, 23 December 2024)
- 05000369/LER-1981-084, Forwards LER 81-084/01T-0.Detailed Event Analysis Encl + (06:13:08, 23 December 2024)
- 05000369/LER-1981-045-03, /03L-0:on 810409,various Portions of Fire Detection Sys Inoperable for Periods Over 1-hr from 810409- 0501.Caused by Area Const.Fire Watches & Patrols Established as Required + (06:13:10, 23 December 2024)
- 05000269/LER-1981-007-01, /01T-0:on 810410,fire Barrier Door for West Penetration Room Was Inoperable W/O Proper Fire Watches Maintained.Caused by Personnel Error.Individual Involved Counseled Re Importance of Communication + (06:13:12, 23 December 2024)
- 05000270/LER-1981-270, Forwards LER 81-270/03L-0.Detailed Event Analysis Encl + (06:13:14, 23 December 2024)
- ML20009C310 + (06:13:15, 23 December 2024)
- ML20009C308 + (06:13:17, 23 December 2024)
- 05000339/LER-1980-105, Forwards LER 80-105/03L-0 + (06:13:18, 23 December 2024)
- 05000269/LER-1981-007, Forwards LER 81-007/01T-0.Detailed Event Analysis Encl + (06:13:21, 23 December 2024)
- 05000369/LER-1981-045, Forwards LER 81-045/03L-0 + (06:13:23, 23 December 2024)
- ML20009C301 + (06:13:24, 23 December 2024)
- 05000369/LER-1981-041-03, /03L-0:on 810408,open Penetration Found in Health Physics Change Room Floor.Caused by Trunk Obstruction & Subsequent Personnel Error.Fire Watch Established & Work Order Written to Repair Firestop + (06:13:26, 23 December 2024)
- 05000369/LER-1981-042-03, /03L-0:on 810406,during Mode 5 Initial Fuel Loading,Seismic Monitoring Instrument Starter Unit Was Not Operating Properly.Caused by Broken Wire & Sensitivity Potentiometer Out of Calibr.Wire Repaired + (06:13:29, 23 December 2024)
- ML20009C297 + (06:13:31, 23 December 2024)
- 05000369/LER-1981-041, Forwards LER 81-041/03L-0.Detailed Event Analysis Encl + (06:13:33, 23 December 2024)
- 05000369/LER-1981-042, Forwards LER 81-042/03L-0.Detailed Event Analysis Encl + (06:13:35, 23 December 2024)
- ML20009C292 + (06:13:37, 23 December 2024)
- ML20009C290 + (06:13:38, 23 December 2024)
- ML20009C289 + (06:13:38, 23 December 2024)
- ML20009C288 + (06:13:40, 23 December 2024)
- 05000369/LER-1981-056-03, /03L-0:on 810417,while in Mode 3,inner Door of Lower Personnel Air Lock Would Not Close Completely.Cause Undetermined.Door Cycled & Found to Be Functioning Properly + (06:13:41, 23 December 2024)
- ML20009C286 + (06:13:42, 23 December 2024)
- ML20009C285 + (06:13:43, 23 December 2024)
- 05000369/LER-1981-049-03, /03L-0:on 810410,during Mode 3 Initial Fuel Loading,Waste Processing Panel Lost Ac Power,Causing Containment Floor & Equipment Sump Level Indicators in Control Room to Fail + (06:13:45, 23 December 2024)
- ML20009C281 + (06:13:46, 23 December 2024)
- IR 05000341/1981004 + (06:13:47, 23 December 2024)
- ML20009C278 + (06:13:49, 23 December 2024)
- 05000369/LER-1981-056, Forwards LER 81-056/03L-0.Detailed Event Analysis Encl + (06:13:50, 23 December 2024)
- ML20009C275 + (06:13:51, 23 December 2024)
- ML20009C274 + (06:13:52, 23 December 2024)
- ML20009C273 + (06:13:53, 23 December 2024)
- ML20009C271 + (06:13:56, 23 December 2024)
- ML20009C270 + (06:13:57, 23 December 2024)
- ML20009C267 + (06:13:58, 23 December 2024)
- ML20009C266 + (06:13:59, 23 December 2024)
- ML20009C265 + (06:14:00, 23 December 2024)
- ML20009C263 + (06:14:00, 23 December 2024)
- IR 05000255/1980024 + (06:14:03, 23 December 2024)
- ML20009C255 + (06:14:05, 23 December 2024)
- ML20009C257 + (06:14:05, 23 December 2024)
- ML20009C253 + (06:14:07, 23 December 2024)