Responds to NRC Re Violations Noted in IE Insp Rept 50-341/81-04.Corrective Actions:Administrative Procedure Re Disassembling & Reassembling Pipe,Conduit & Cabletray Supports Issued
ML20009C285
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/24/1981
From: Wells D
DETROIT EDISON CO.
To: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20009C280 List:
References
EF2-53561, NUDOCS 8107200432
Download: ML20009C285 (5)


Text

u Don:Id A. Wells v e ng pg Ass. a-ce Edison =s.m.. ~.=-

June 24,1981 EF2-53561 Mr. G. Fiore111, Chief Reactor Construction and Engineering Support Branch U.S. Nuclear Regulatory Ccmrission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137

Subject:

Nonecupliance at Enrico Fenri Unit 2 Construction Site

Dear Mr. Fiore111:

This letter responds to the items of nonccupliance contained in your IE Report 50-341/81-04. This inspection of Enrico Fermi Unit 2 Site Construction activities was perfonned by Mr. I.T. Yin of NRC Region III on April 21-24, 1981.

Only the cited iten of nonecupliance is discussed in this reply, as required by Section 2.201 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations. The unresolved items have been acted upon and we will be prepared to discuss this action with your inspectors on their next visit.

The enclosed response is arranged in sequence of items cited in the body of your report. The finding and section numbers are referenced.

We trust this Etter satisfactorily answers the concerns raised in your report. We shalf be glad to discuss any further concerns you tray have.

Very truly your,

I DAW / HAW /cp E

IM e10720o432 810707 PDR ADOCK 05000341 G

PDR

Mr. G. FioIulli, Chief June 24, 1981 g

I Page Two EF2-53561 cc: Mr. Victor Stello, Jr. Director Office of Inspection and Enforcement Division of Reactor Inspection Programs U.S. Nuclear Regulatory Ca mission Washington, D.C. 20555 Mr. Bruce Little, Resident Inspector U.S. Nuclear Regulatory Cm mission Resident Inspectors Office 6450 North Dixie Highway Newport, Michigan 48166 l

7 1

r l

l

~_. -. -.-

'IHE DETROIT IDISON OCMPAh7 -

QUALITY ASSURANCE DEPARTMEta DRICO FERMI 2 PROJECT Response to NRC Report No. 50-341/81-04 Docket No. 50-341 License No. CPPR-87 i

Inspection at: Fermi 2 Site, Monroe, Michigan Inspection conducted: April 21-24, 1981 Prepared by:

1H.A. Walker, Supervisor Construction Quality Assurance 1

Approved by:

[

/M T.A. Alessi, Director Project Quality Assurance i

(

-y.

y

--y-.

.,,,,,,.,n

,,:,,..,,,,,e-_,

,y_,

v.-

-,,r,,

,,-c-e---c.

Page 2 of 3 Response to NRC Inspection Report # 50-341/81-04 Statement of Violation 81-04, Appendix A, (81-04-01)

Contrary to the requirments of 10CFR50, Appendix B, Criterion VI a site contractor at the Enrico Fermi, Unit 2 site used an inter-office memo-randum m document changes to' procedures and as a result by-passed the established docunent control procedures.

Corrective Action Taken and the Results Achieved Administrative Procedure AP-IV-20, Revision 0, entitled, " Disassembling and Re-Assembling of Pipe, Conduit and Cable Tray Support" has been prepared, approved and was issued for use on May 5, 1981. This procedure incorporates the methods described in memorandum DIC 81-0284, DIC 81-0965 and DIC 81-1543 which are noted in item 2 on page 4 of the Inspection Report.

Corrective Action Taken to Avoid Further Nonempliance Enrico Fermi 2 site organizations have been notified of the problem. They were cautioned to review all letters and memorandums originated by the res-pective organizations for this problem. Construction Quality Assurance per-sonnel have been notified to review inccming correspondence for this problem.

Date When Full Cmpliance Will Be Achieved All required action has now been empleted.

__a

Page 3 of 3 i

The foregoing statements are based on facts and circunstances which are true and accurate to the best of my knowledge and belief.

i H.A. Walker, Supervisor Construct. ion Quality Assurance Subscribed and sworn to before me this 24th day of June, 1981.

%wnk W

\\

JEN11FIE KYKO Notary Public. Monroe County, MI My Commission E9 ires Nov.26,1.984 I

l l

l lr

---mv


r

' - - - - ~ ~