ML20009C308
| ML20009C308 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 07/08/1981 |
| From: | Hind J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gilberts D NORTHERN STATES POWER CO. |
| Shared Package | |
| ML20009C309 | List: |
| References | |
| NUDOCS 8107200451 | |
| Download: ML20009C308 (2) | |
See also: IR 05000282/1981012
Text
.
[onec jo
UNITED STATES
-
g
,,,,
g
NUCLEAR RECULATORY COMMISSION
y
5
a
REGION lli
,
G
[
799 ROOSEVELT ROAD
f
o
GLEN ELLYN, ILLINOIS 60137
/'\\ 0f {fg
July 8, 1981
x
q$N-
~
s
Docket No. 50-282
7*
Docket No. 50-306
p
g/
\\bs
ss
Northern States Power Company
'Q '
"
ATTN:
Mr. Dennis E. Gilberts
'
Sr. Vice President
Power Supply
414 Nicollet Mall
M nneapolis, MN 55401
Geutlemen:
This refers to the routine safety inspection conducted by Mr. A. Januska
and Dr. M. J. Oestmann of this office on June 11-17, 1981, of activities
at Prairie Island Nuclear Generating Plant, Units 1 and 2, authorized by
NRC Operating License Nos. DPR-42 and DPR-60 and to the discussion of our
findings with Mr. Mayer at your corporate office on June 15, 1981, and
Mr. Watz1 and others of your staff at your plant on June 16, 1981, at the
conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
In addition, our Mobile Laboratory was at the sice
during the inspection to perform independent measurements of radioactivity
in samples split with the licensee.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you or
your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within seven (7)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
this letter a written application to this office to withhold such infor-
mation.
Section 2.790(b)(1) requires that any such application must be
accompanied by an affidavit executed by the owner of the information which
[W
s
//
8107200451 810708
PDR ADOCK 05000282
'l
.
.
Northern States Power Company
-2-
,
,
identifies the document or part sought to be withheld, and which contains
a full statement of the reasons on the basis which it is claimed that the
information should be withheld from public disclosure. This section further
requires the statement to address with specificity the considerations listed
in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incor-
porated as far as possible into a separate part of the affidavit.
If we do
not hear from you in this regard within the specified periods noted above, a
copy of this letter and the enclosed inspection report will be placed in the
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
J. A. Hind, Acting Director
Division of Emergency Preparedness
and Operational Support
Enclosure:
IE Inspection
Reports No. 50-282/81-12
.
and No. 50-306/81-14
cc w/ encl:
F. P. Tierney, Jr.,
Plant Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
John W. Ferman, Ph.D.,
Nuclear Engineer, MPCA
t
.
RIII
R
RI
RIII
RIII
RII
g
&&
$,f f '
,
I
Oeste nn/so
J
Schumacher
Pappriello
-
d
Heis man
'
7///f I
/ 7[7[f/
l
6/29/81
y
,
1
1
,
. -
. - .
.
. _ . _ .
. - . .
..