Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000327/LER-1981-070-03, /03L-0:on 810619,containment Bldg Lower Compartment Air Monitor Valve Failed to Close on Signal. Caused by Loose Screw in Handswitch,Allowing Open Contact to Short Across,Preventing Solenoid Valve from de-energizing + (13:20:40, 21 December 2024)
- 05000327/LER-1981-070, Forwards LER 81-070/03L-0 + (13:20:41, 21 December 2024)
- ML20009F515 + (13:20:42, 21 December 2024)
- ML20009F514 + (13:20:44, 21 December 2024)
- 05000269/LER-1981-010-03, /03L-0:on 810602,turbine Driven Emergency Feedwater Pump Declared Inoperable.Caused by Governor Valve Sticking in Open Position Due to Sys Contamination.Linkage Pin Removed,Governor Valve Freed & Stem Cleaned + (13:20:45, 21 December 2024)
- 05000339/LER-1981-052-03, /03L-0:on 810619,nuclear Instrumentation Channel N-35 Observed to Be Reading Low & Erratic W/Unit Recovering from Turbine Trip.Caused by Failure of High Voltage Power Supply.Power Supply Replaced + (13:20:47, 21 December 2024)
- ML20009F511 + (13:20:49, 21 December 2024)
- 05000269/LER-1981-010, Forwards LER 81-010/03L-0.Detailed Event Analysis Encl + (13:20:50, 21 December 2024)
- ML20009F508 + (13:20:52, 21 December 2024)
- 05000339/LER-1981-052, Forwards LER 81-052/03L-0 + (13:20:53, 21 December 2024)
- ML20009F504 + (13:20:55, 21 December 2024)
- 05000369/LER-1981-094-03, /03L-0:on 810603,flow Rate Measurement Instrumentation on Waste Monitor Tank B Declared Inoperable During Attempted Liquid Waste Release.Caused by Root Valves to Tank Flow Transmitter Left Closed After Equipment Mod + (13:20:56, 21 December 2024)
- ML20009F502 + (13:20:58, 21 December 2024)
- 05000269/LER-1981-013-01, /01T-0:on 810630,backup Function of Isolating & Transfer Diodes in Instrumentation & Control Sys Disabled on All Channels on All Units.Caused by Misinterpretation of Tech Specs.Proposed Tech Spec Change Initiated + (13:20:59, 21 December 2024)
- ML20009F499 + (13:21:01, 21 December 2024)
- ML20009F500 + (13:21:01, 21 December 2024)
- 05000369/LER-1981-094, Forwards LER 81-094/03L-0 + (13:21:03, 21 December 2024)
- ML20009F496 + (13:21:04, 21 December 2024)
- 05000269/LER-1981-013, Forwards LER 81-013/01T-0.Detailed Event Analysis Encl + (13:21:05, 21 December 2024)
- BSEP-81-1369, RO 1-81-57:on 810717,during Review of Wiring Diagram for Reactor Core Isolation Cooling,Two non-electronic Switching Sys Div 2 Cables Found Intermixed W/One Switching Sys Cable in Controlled Logic Panel in Control Room.Review Underway + (13:21:08, 21 December 2024)
- ML20009F493 + (13:21:08, 21 December 2024)
- ML20009F491 + (13:21:10, 21 December 2024)
- ML20009F490 + (13:21:11, 21 December 2024)
- 05000321/LER-1981-065-03, /03L-0:on 810701,instrument N62-N009A Found Inoperable During Offgas Hydrogen Analyzer Test & Calibr. Caused by Component Failure Due to Restricted Immersion Tube in Flame Check Assembly.Component Replaced + (13:21:12, 21 December 2024)
- ML20009F488 + (13:21:14, 21 December 2024)
- ML20009F487 + (13:21:15, 21 December 2024)
- 05000321/LER-1981-065, Forwards LER 81-065/03L-0 + (13:21:16, 21 December 2024)
- ML20009F483 + (13:21:17, 21 December 2024)
- ML20009F481 + (13:21:17, 21 December 2024)
- 05000339/LER-1981-048-03, /03L-0:on 810613 & 14,intermediate Range Nuclear Instrumentation Channel N-35 Failed.Caused by High Voltage Power Supply Failure & Loss of Detector Voltage Bistable Module.Components Replaced + (13:21:18, 21 December 2024)
- ML20009F479 + (13:21:20, 21 December 2024)
- 05000324/LER-1981-061-03, /03L-0:on 810629,during Test,Diesel Generator Failed to Develop Generator Field Voltage.Caused by Failed Electrical Coil in Field Shorting Device 17 Preventing Generator Field from Flashing When Diesel Started + (13:21:22, 21 December 2024)
- ML20009F477 + (13:21:23, 21 December 2024)
- ML20009F476 + (13:21:24, 21 December 2024)
- 05000324/LER-1981-061, Forwards LER 81-061/03L-0 + (13:21:25, 21 December 2024)
- ML20009F473 + (13:21:26, 21 December 2024)
- ML20009F472 + (13:21:27, 21 December 2024)
- ML20009F471 + (13:21:27, 21 December 2024)
- ML20009F470 + (13:21:29, 21 December 2024)
- ML20009F468 + (13:21:30, 21 December 2024)
- ML20009F469 + (13:21:30, 21 December 2024)
- ML20009F467 + (13:21:31, 21 December 2024)
- ML20009F466 + (13:21:32, 21 December 2024)
- ML20009F465 + (13:21:34, 21 December 2024)
- ML20009F464 + (13:21:35, 21 December 2024)
- ML20009F463 + (13:21:36, 21 December 2024)
- 05000339/LER-1981-048, Forwards LER 81-048/03L-0 + (13:21:37, 21 December 2024)
- 05000366/LER-1981-069-03, /03L-0:on 810630,average Power Range Monitor Surveillance Not Performed within Required Time Limit. Caused by Personnel Error.Surveillance Performed + (13:21:39, 21 December 2024)
- 05000366/LER-1981-069, Forwards LER 81-069/03L-0 + (13:21:41, 21 December 2024)
- 05000321/LER-1981-054, Forwards LER 81-054/03L-0 + (13:21:42, 21 December 2024)
- 05000321/LER-1981-078-03, /03L-0:on 810712,torus Water Temp Found Above Allowable Temp Level.Caused by Testing of Reactor Core Isolation Cooling & HPCI Turbines.Temp Was Reduced to Allowable Level + (13:21:51, 21 December 2024)