Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20009F589 + (13:19:29, 21 December 2024)
- L-81-249, Interim Deficiency Rept,Originally Reported on 810312,re Failure to Follow Established Procedure When Interpreting Radiographs of safety-related Welds.Required Repair Work Not Yet Completed.Final Rept Delayed Until 810731 + (13:19:30, 21 December 2024)
- L-81-288, Deficiency Rept,Originally Reported on 810610,re Linear Indications in Reactor Coolant Pump 2A1 Volute.Further Info Needed Re Size & Depth of Excavations Required to Remove Linear Indications.Final Rept Will Be Submitted 810810 + (13:19:31, 21 December 2024)
- ML20009F586 + (13:19:33, 21 December 2024)
- ML20009F585 + (13:19:33, 21 December 2024)
- ML20009F582 + (13:19:35, 21 December 2024)
- ML20009F583 + (13:19:35, 21 December 2024)
- ML20009F580 + (13:19:36, 21 December 2024)
- ML20009F581 + (13:19:36, 21 December 2024)
- ML20009F578 + (13:19:37, 21 December 2024)
- ML20009F577 + (13:19:37, 21 December 2024)
- ML20009F576 + (13:19:38, 21 December 2024)
- ML20009F575 + (13:19:38, 21 December 2024)
- ML20009F574 + (13:19:39, 21 December 2024)
- 05000321/LER-1981-056-03, /03L-0:on 810610,during Startup,Offgas Hydrogen Analyzer 1N62-N009A Was Reported Inoperative.Caused by Personnel Error.Root Valve N62-F064 a Was Found Closed. Valve Opened + (13:19:40, 21 December 2024)
- 05000321/LER-1981-056, Forwards LER 81-056/03L-0 + (13:19:42, 21 December 2024)
- ML20009F570 + (13:19:43, 21 December 2024)
- ML20009F569 + (13:19:45, 21 December 2024)
- ML20009F567 + (13:19:45, 21 December 2024)
- 05000321/LER-1981-050-03, /03L-0:on 810612,while Performing RHR Valve Operability,Containment Spray Isolation Valve B Found Inoperative.Caused by Incorrect Installation of Motor Pinion Gear.Motor Pinion Gear Reinstalled + (13:19:46, 21 December 2024)
- ML20009F565 + (13:19:47, 21 December 2024)
- ML20009F564 + (13:19:48, 21 December 2024)
- ML20009F563 + (13:19:48, 21 December 2024)
- 05000321/LER-1981-050, Forwards LER 81-050/03L-0 + (13:19:50, 21 December 2024)
- 05000259/LER-1981-036-03, /03L-0:on 810619,during Biaxial Seismic Switch Tests,Seismic Trigger Hst a Failed to Operate.Caused by Relay Transistor Failure Due to Moisture Condensation Inside Housing.Trigger Repaired + (13:19:51, 21 December 2024)
- ML20009F559 + (13:19:52, 21 December 2024)
- 05000259/LER-1981-036, Forwards LER 81-036/03L-0 + (13:19:53, 21 December 2024)
- ML20009F556 + (13:19:54, 21 December 2024)
- ML20009F554 + (13:19:55, 21 December 2024)
- ML20009F555 + (13:19:55, 21 December 2024)
- 05000327/LER-1981-075-03, /03L-0:on 810623,found Sufficient Clearance Did Not Exist Between Alternate Charging Line from Regenerative Heat Exchanger to Reactor Coolant Loop 4.Caused by Inadequate Original Drawings + (13:19:57, 21 December 2024)
- ML20009F552 + (13:19:58, 21 December 2024)
- 05000327/LER-1981-075, Forwards LER 81-075/03L-0 + (13:19:59, 21 December 2024)
- AECM-81-226, Status Rept 1 on Deficiency Re Temp Flex Penetration Bellows Assemblies,Initially Reported on 810529.Vendor Has Been Requested to Prepare Written Calculations to Verify Min Weld Requirements for Design Seismic Conditions + (13:20:00, 21 December 2024)
- 05000321/LER-1981-053-03, /03L-0:on 810610,drywell & Torus Temp Recorder 1T47-R612 Found Marking Erratically.Caused by Component Failure Due to Balancing Motor Failure.Component Replaced + (13:20:02, 21 December 2024)
- ML20009F547 + (13:20:04, 21 December 2024)
- 05000321/LER-1981-053, Forwards LER 81-053/03L-0 + (13:20:05, 21 December 2024)
- 05000029/LER-1981-013-03, /03L-0:on 810616,O Ring Seals on Penetrations Failed to Hold Pressure.Caused by Loose Bolting on Penetration Flanges.Bolts Retightened & Penetrations Retested + (13:20:08, 21 December 2024)
- 05000029/LER-1981-013, Forwards LER 81-013/03L-0 + (13:20:10, 21 December 2024)
- 05000366/LER-1981-053-03, /03L-0:on 810611,turbine First State Pressure Permissive Switches Found Out of Tolerance While Performing Barksdale Pressure Switch Calibr.Probably Caused by Setpoint Drift.Switches Recalibr + (13:20:12, 21 December 2024)
- ML20009F539 + (13:20:13, 21 December 2024)
- FVY-81-107, Forwards Proprietary rept,YAEC-1265P, Methods for Analysis of Oxide Fuel Rod,Steady-State Thermal Effects (Frosstey) Code Qualification & Application. Affidavit Encl.Rept Withheld (Ref 10CFR2.790) + (13:20:14, 21 December 2024)
- 05000366/LER-1981-053, Forwards LER 81-053/03L-0 + (13:20:21, 21 December 2024)
- 05000302/LER-1981-030-03, /03L-0:on 810526 & 0616,emergency Diesel Generator B Shut Down from Ready Condition.Cause of 810526 Event Undetermined.Event on 810616 Caused by Maladjusted Timing Relay.Relay Adjusted + (13:20:23, 21 December 2024)
- AECM-81-228, Forwards Revised Pages of & Responses to NRC Questions Re Security Training & Qualification Plan.Pages Withheld (Ref 10CFR2.790) + (13:20:24, 21 December 2024)
- 05000302/LER-1981-030, Forwards LER 81-030/03L-0.Detailed Event Analysis Encl + (13:20:26, 21 December 2024)
- 05000327/LER-1981-069-01, /01T-0:on 810623,pipe Hanger Found Omitted from 3/4-inch Test & Fill Line from 3-inch Boron Injection Line to Safety Injection Accumulators.Caused by Engineering Design Failure to Provide Proper Support Requirements + (13:20:28, 21 December 2024)
- ML20009F528 + (13:20:29, 21 December 2024)
- RBG-10825, Advises That Applicant Reviewed Generic Ltr 81-01.FSAR, Section 1.8,addresses All Applicable NRC Reg Guides.Licensee Will Be in Compliance W/Reg Guide 1.58,Revision 1 & Reg Guide 1.146 Positions Prior to Receiving OL + (13:20:29, 21 December 2024)
- ML20009F526 + (13:20:33, 21 December 2024)
- 05000327/LER-1981-069, Forwards LER 81-069/01T-0 + (13:20:34, 21 December 2024)