Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000369/LER-1981-069, Forwards LER 81-069/03L-0.Detailed Event Analysis Encl + (13:19:12, 21 December 2024)
- 05000369/LER-1981-068, Forwards LER 81-068/03L-0.Detailed Event Analysis Encl + (13:19:14, 21 December 2024)
- 05000366/LER-1981-051, Forwards LER 81-051/03L-0 + (13:19:16, 21 December 2024)
- 05000296/LER-1981-032-03, /03L-0:on 810701,leak Discovered at Vent Nipple of RHR Pump Room Cooler 3A.Cause Unknown.Crack Was Silver Soldered + (13:19:18, 21 December 2024)
- ML20009F603 + (13:19:19, 21 December 2024)
- 05000369/LER-1981-067-03, /03L-0:on 810425,while in Mode 3 Initial Fuel Loading,Boron Concentration in Upper Head Injection Accumulator Sys Was 2,153 Parts Per Meter.Caused by Insufficient Purging Before Sampling.Pressure Reduced + (13:19:21, 21 December 2024)
- 05000296/LER-1981-032, Forwards LER 81-032/03L-0 + (13:19:22, 21 December 2024)
- ML20009F599 + (13:19:23, 21 December 2024)
- 05000369/LER-1981-067, Forwards LER 81-067/03L-0.Detailed Event Analysis Encl + (13:19:24, 21 December 2024)
- ML20009F596 + (13:19:25, 21 December 2024)
- 05000335/LER-1981-031-03, /03L-0:on 810605,electrical Ground Occurred on 125-volt Dc Bus B.Caused by Grounded Coil in Faulty Electrohydraulic Actuator for Governor Valve.Spare Actuator Installed + (13:19:27, 21 December 2024)
- 05000335/LER-1981-031, Forwards LER 81-031/03L-0 + (13:19:28, 21 December 2024)
- ML20009F589 + (13:19:29, 21 December 2024)
- L-81-249, Interim Deficiency Rept,Originally Reported on 810312,re Failure to Follow Established Procedure When Interpreting Radiographs of safety-related Welds.Required Repair Work Not Yet Completed.Final Rept Delayed Until 810731 + (13:19:30, 21 December 2024)
- L-81-288, Deficiency Rept,Originally Reported on 810610,re Linear Indications in Reactor Coolant Pump 2A1 Volute.Further Info Needed Re Size & Depth of Excavations Required to Remove Linear Indications.Final Rept Will Be Submitted 810810 + (13:19:31, 21 December 2024)
- ML20009F586 + (13:19:33, 21 December 2024)
- ML20009F585 + (13:19:33, 21 December 2024)
- ML20009F582 + (13:19:35, 21 December 2024)
- ML20009F583 + (13:19:35, 21 December 2024)
- ML20009F580 + (13:19:36, 21 December 2024)
- ML20009F581 + (13:19:36, 21 December 2024)
- ML20009F578 + (13:19:37, 21 December 2024)
- ML20009F577 + (13:19:37, 21 December 2024)
- ML20009F576 + (13:19:38, 21 December 2024)
- ML20009F575 + (13:19:38, 21 December 2024)
- ML20009F574 + (13:19:39, 21 December 2024)
- 05000321/LER-1981-056-03, /03L-0:on 810610,during Startup,Offgas Hydrogen Analyzer 1N62-N009A Was Reported Inoperative.Caused by Personnel Error.Root Valve N62-F064 a Was Found Closed. Valve Opened + (13:19:40, 21 December 2024)
- 05000321/LER-1981-056, Forwards LER 81-056/03L-0 + (13:19:42, 21 December 2024)
- ML20009F570 + (13:19:43, 21 December 2024)
- ML20009F569 + (13:19:45, 21 December 2024)
- ML20009F567 + (13:19:45, 21 December 2024)
- 05000321/LER-1981-050-03, /03L-0:on 810612,while Performing RHR Valve Operability,Containment Spray Isolation Valve B Found Inoperative.Caused by Incorrect Installation of Motor Pinion Gear.Motor Pinion Gear Reinstalled + (13:19:46, 21 December 2024)
- ML20009F565 + (13:19:47, 21 December 2024)
- ML20009F564 + (13:19:48, 21 December 2024)
- ML20009F563 + (13:19:48, 21 December 2024)
- 05000321/LER-1981-050, Forwards LER 81-050/03L-0 + (13:19:50, 21 December 2024)
- 05000259/LER-1981-036-03, /03L-0:on 810619,during Biaxial Seismic Switch Tests,Seismic Trigger Hst a Failed to Operate.Caused by Relay Transistor Failure Due to Moisture Condensation Inside Housing.Trigger Repaired + (13:19:51, 21 December 2024)
- ML20009F559 + (13:19:52, 21 December 2024)
- 05000259/LER-1981-036, Forwards LER 81-036/03L-0 + (13:19:53, 21 December 2024)
- ML20009F556 + (13:19:54, 21 December 2024)
- ML20009F554 + (13:19:55, 21 December 2024)
- ML20009F555 + (13:19:55, 21 December 2024)
- 05000327/LER-1981-075-03, /03L-0:on 810623,found Sufficient Clearance Did Not Exist Between Alternate Charging Line from Regenerative Heat Exchanger to Reactor Coolant Loop 4.Caused by Inadequate Original Drawings + (13:19:57, 21 December 2024)
- ML20009F552 + (13:19:58, 21 December 2024)
- 05000327/LER-1981-075, Forwards LER 81-075/03L-0 + (13:19:59, 21 December 2024)
- AECM-81-226, Status Rept 1 on Deficiency Re Temp Flex Penetration Bellows Assemblies,Initially Reported on 810529.Vendor Has Been Requested to Prepare Written Calculations to Verify Min Weld Requirements for Design Seismic Conditions + (13:20:00, 21 December 2024)
- 05000321/LER-1981-053-03, /03L-0:on 810610,drywell & Torus Temp Recorder 1T47-R612 Found Marking Erratically.Caused by Component Failure Due to Balancing Motor Failure.Component Replaced + (13:20:02, 21 December 2024)
- ML20009F547 + (13:20:04, 21 December 2024)
- 05000321/LER-1981-053, Forwards LER 81-053/03L-0 + (13:20:05, 21 December 2024)
- 05000029/LER-1981-013-03, /03L-0:on 810616,O Ring Seals on Penetrations Failed to Hold Pressure.Caused by Loose Bolting on Penetration Flanges.Bolts Retightened & Penetrations Retested + (13:20:08, 21 December 2024)
- 05000029/LER-1981-013, Forwards LER 81-013/03L-0 + (13:20:10, 21 December 2024)