Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000313/1981026 + (10:24:19, 21 December 2024)
- ML20010H970 + (10:24:20, 21 December 2024)
- 05000324/LER-1981-057, Forwards Updated LER 81-057/03L-1 + (10:24:21, 21 December 2024)
- ML20010H966 + (10:24:27, 21 December 2024)
- ML20010H965 + (10:24:28, 21 December 2024)
- 05000366/LER-1981-080-03, /03L-0:on 810829,during Control Board Walkdown, Torus/Drywell Vacuum Breaker Indicator 2T48-AOF-323H Was Inoperative.Caused Unknown.Vacuum Breaker Valve to Be Tested Per Tech Specs Until Repairs at Next Reactor Cold Shutdown + (10:24:29, 21 December 2024)
- ML20010H963 + (10:24:30, 21 December 2024)
- ML20010H962 + (10:24:31, 21 December 2024)
- 05000313/LER-1981-010-03, /03L-0:on 810804,during Calibr,Reactor Protective System Channel B Scaled Difference in Amplifier Gain Setting Differed from Value in Power Escalation Test.Caused by Incorrect Pentiometer Adjustment.Procedure Revised + (10:24:32, 21 December 2024)
- IR 05000498/1981029 + (10:24:34, 21 December 2024)
- ML20010H958 + (10:24:35, 21 December 2024)
- 05000324/LER-1981-083-03, Reactor Core Isolation Cooling Turbine Steam Supply Inboard Isolation Valve Closed. Caused by Spurious RCIC Isolation Logic Bus a Signal Due to Cold Solder Joint in Ambient Temp Switch.Switch Resoldered + (10:24:36, 21 December 2024)
- 05000324/LER-1981-083, Forwards Updated LER 81-083/03L-1 + (10:24:38, 21 December 2024)
- 05000366/LER-1981-080, Forwards LER 81-080/03L-0 + (10:24:40, 21 December 2024)
- ML20010H952 + (10:24:41, 21 December 2024)
- ML20010H951 + (10:24:42, 21 December 2024)
- ML20010H950 + (10:24:43, 21 December 2024)
- ML20010H949 + (10:24:44, 21 December 2024)
- ML20010H948 + (10:24:45, 21 December 2024)
- GO2-81-304, Forwards Page Changes to Physical Security Plan.Page Changes Withheld (Ref 10CFR2.790) + (10:24:46, 21 December 2024)
- ML20010H947 + (10:24:46, 21 December 2024)
- 05000313/LER-1981-010, Forwards LER 81-010/03L-0 + (10:24:49, 21 December 2024)
- ML20010H943 + (10:24:50, 21 December 2024)
- ML20010H941 + (10:24:51, 21 December 2024)
- ML20010H940 + (10:24:51, 21 December 2024)
- 05000368/LER-1981-030-03, /03L-0:on 810731,during Design Mod Check of Remote Control Hydrogen Analyzer Sample Pump 2P162,found No Air Flow Delivered to One Analyzer.Cause Undetermined.Sample Pump Operable within 30 Days + (10:24:53, 21 December 2024)
- ML20010H937 + (10:24:54, 21 December 2024)
- ML20010H936 + (10:24:55, 21 December 2024)
- ML20010H935 + (10:24:56, 21 December 2024)
- ML20010H933 + (10:24:57, 21 December 2024)
- 05000368/LER-1981-030, Forwards LER 81-030/03L-0 + (10:24:58, 21 December 2024)
- 05000267/LER-1981-049-03, /03L-0:during 810802-07,increase Occurred in Offgassing from Core & Core Outlet Temps.Caused by Increased Primary Coolant Moisture & Oxidants from Refueling Shutdown + (10:25:00, 21 December 2024)
- ML20010H929 + (10:25:05, 21 December 2024)
- 05000368/LER-1981-031-03, /03L-0:on 810808,during Axial Shape Index Dampening Maneuver,Part Length Control Element Assembly Dropped & Became Inoperable.After Repair,Dropped Again on 810809.Caused by Poor Connection of Coil Driver Card + (10:25:06, 21 December 2024)
- ML20010H927 + (10:25:08, 21 December 2024)
- 05000267/LER-1981-049, Forwards LER 81-049/03L-0.Detailed Event Analysis Encl + (10:25:09, 21 December 2024)
- ML20010H924 + (10:25:10, 21 December 2024)
- ML20010H923 + (10:25:11, 21 December 2024)
- 05000270/LER-1981-013-03, /03L-0:on 810815,reactor Bldg Spray Pump 2A Declared Inoperable Due to Oil Leak on Bearing Oil Reservoir.Caused by Loose Piping Allowing Leakage.Reservoir Refilled W/Oil + (10:25:13, 21 December 2024)
- ML20010H921 + (10:25:14, 21 December 2024)
- 05000265/LER-1981-015-03, /03L-0:on 810823,while Performing Suppression Chamber to Drywell Vacuum Breaker Monthly Exercise,Valve 2-1601-32C Failed to Indicate Fully Closed.Caused by Misalignment of Position Indication Limit Switches + (10:25:15, 21 December 2024)
- ML20010H919 + (10:25:16, 21 December 2024)
- 05000270/LER-1981-013, Forwards LER 81-013/03L-0.Detailed Event Analysis Encl + (10:25:18, 21 December 2024)
- ML20010H914 + (10:25:19, 21 December 2024)
- 05000267/LER-1981-052-03, /03L-0:on 810812,standby Bearing Water Makeup Pump Removed from Svc.Caused by Need to Repair Bonnet Leak in Valve in Suction Line to Pump.Pump Returned to Svc After Repair Completed + (10:25:20, 21 December 2024)
- 05000368/LER-1981-031, Forwards LER 81-031/03L-0 + (10:25:22, 21 December 2024)
- 05000265/LER-1981-015, Forwards LER 81-015/03L-0 + (10:25:25, 21 December 2024)
- ML20010H906 + (10:25:26, 21 December 2024)
- ML20010H905 + (10:25:31, 21 December 2024)
- 05000267/LER-1981-052, Forwards LER 81-052/03L-0.Detailed Event Analysis Encl + (10:25:33, 21 December 2024)
- 05000313/LER-1981-009-03, /03L-0:on 810727,during Start Test of Steam Driven Emergency Feedwater Pump P7A,steam Generator B Valve CV-2617 Did Not Open on Demand.Caused by Excessive Play Due to Wear.Switch Replaced + (10:25:34, 21 December 2024)