Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PY-CEI-NRR-1359, Forwards Copy of NPDES Permit 3IB00016*DD Issued 910513,per App B,Section 3.2 + (03:36:44, 21 December 2024)
- ML20024H242 + (03:36:46, 21 December 2024)
- ML20024H241 + (03:36:47, 21 December 2024)
- ML20024H239 + (03:36:47, 21 December 2024)
- 05000245/LER-1991-013, :on 910422,fuse Pulled in Order to Install LLRT Connections,Resulting in Unplanned Standby Gas Treatment Sys Initiation.Caused by Failure to Identify Affects of Removing Fuse.Removed Fuse Installed + (03:36:52, 21 December 2024)
- HL-1643, Responds to NRC Re Violations Noted in Insp Rept 50-321/91-06 & 50-366/91-06.Corrective Actions:Procedures Revised to Delegate Responsibility for Control & Accountability of Spent SRM & IRM + (03:36:53, 21 December 2024)
- ML20024H235 + (03:36:55, 21 December 2024)
- ML20024H234 + (03:36:55, 21 December 2024)
- ML20024H230 + (03:37:01, 21 December 2024)
- 05000313/LER-1991-003-02, :on 910421,actuation of EFW Sys During Plant Heatup Occurred Due to Low Once Through Steam Generator Level.Caused by Leaking Feedwater Recirculation Valve.Plant Startup Procedure OP 1102.02 Will Be Revised + (03:37:02, 21 December 2024)
- ML20024H227 + (03:37:04, 21 December 2024)
- ML20024H226 + (03:37:05, 21 December 2024)
- ML20024H223 + (03:37:19, 21 December 2024)
- ML20024H222 + (03:37:20, 21 December 2024)
- ML20024H221 + (03:37:20, 21 December 2024)
- ELV-02812, Forwards Rev 1 to Vogtle Electric Generating Plant Unit 1 Cycle 3 Core Operating Limits Rept & Vogtle Electric Generating Plant Unit 2 Cycle 2 Core Operating Limits Rept + (03:37:21, 21 December 2024)
- HL-1660, Forwards Revised Page for Ltr HL-1659, Request for Addl Info-Temporary Relief from ASME Section XI Requirements, Dated 910524,reflecting Deletion of Last Sentence on Page E-2 + (03:37:22, 21 December 2024)
- 05000263/LER-1991-008, :on 910422,cracking Discovered on Control Rod Drive Housing Flange Cap Screws.Caused by Inadequate Design of Screws.Four New,Original Equipment Cap Screws Installed & Reactor Vessel Hydro Performed + (03:37:25, 21 December 2024)
- ML20024H216 + (03:37:26, 21 December 2024)
- 05000266/LER-1991-003, :on 910429,charging Sys Check Valve 1-370 Discovered W/Leakage in Excess of Limits Due to Worn Disc Arm Bushing Steps.Worn Disc Arm Bushing Steps Cladded W/ E308 Weld Matl & Hand Filed to Design Contour + (03:37:27, 21 December 2024)
- HL-1659, Forwards Addl Info,Justifying Observed Leakage Will Not Degrade Over Next Cycle,In Response to 910521 Temporary Relief Request from ASME Section XI,IWA-5250,pressure Testing Requirements + (03:37:28, 21 December 2024)
- ML20024H214 + (03:37:28, 21 December 2024)
- ML20024H212 + (03:37:30, 21 December 2024)
- ML20024H210 + (03:37:31, 21 December 2024)
- 3F0591-14, Provides Notice of Termination of Wk Bandhauer,Cm Crosten, Gh Halnon,Mp Holmes,Lp Kasper,At Kennedy,Jg Smith,Jw Smith & Gw Wilson,Effective 910510 + (03:37:32, 21 December 2024)
- 05000498/LER-1991-015, :on 910422,train C AFW Pump Inadvertently Started Due to Failure of Led in Sequencer Test Circuitry. Faulty Led Replaced & Blocking Circuit Satisfactorily Tested + (03:37:34, 21 December 2024)
- 05000295/LER-1991-006-03, :on 910423,blackout Signal Inadvertently Induced Due to Logic Sequence Error in Backfeed Procedure. Procedure Reviewed & Tested on Simulator to Verify Adequacy + (03:37:36, 21 December 2024)
- 05000282/LER-1991-003-01, :on 910423,auto-start Occurred of One Train of Auxiliary Bldg Special Ventilation Sys.Cause Unknown.Plant Mod Initiated Removing Unnecessary Wiring That Could Short Monitor Module + (03:37:37, 21 December 2024)
- U-601842, Responds to NRC Re Violations Noted in Insp Rept 50-461/91-06.Corrective Actions:Cps Developing Pstg to EOP Flowchart Deviation Document & EOP Support Procedure Validation Program Developed + (03:37:39, 21 December 2024)
- 05000455/LER-1991-005-01, :on 900817,preoutage Mod Work Initiated W/O Proper Operability Review Due to Programmatic Deficiencies. Daily Const Work Authorization Sheet Formalized + (03:37:41, 21 December 2024)
- ML20024H203 + (03:37:42, 21 December 2024)
- ML20024H201 + (03:37:43, 21 December 2024)
- ML20024H199 + (03:37:47, 21 December 2024)
- ML20024H197 + (03:37:48, 21 December 2024)
- LD-91-022, Proposes Series of Meetings W/Nrc to Identify Critical Path Issues & Explore Areas for Schedule Improvements + (03:37:49, 21 December 2024)
- ML20024H195 + (03:37:49, 21 December 2024)
- ML20024H192 + (03:37:51, 21 December 2024)
- ML20024H191 + (03:37:52, 21 December 2024)
- A09503, Transmits Response to 910424 Notice of Violation Concerning Physical Security & Routine Safeguards Insp + (03:37:53, 21 December 2024)
- ML20024H189 + (03:37:54, 21 December 2024)
- ML20024H188 + (03:37:55, 21 December 2024)
- ML20024H185 + (03:37:56, 21 December 2024)
- ML20024H187 + (03:37:56, 21 December 2024)
- ML20024H184 + (03:37:58, 21 December 2024)
- ML20024H182 + (03:37:59, 21 December 2024)
- ML20024H180 + (03:38:00, 21 December 2024)
- ML20024H179 + (03:38:00, 21 December 2024)
- ML20024H178 + (03:38:01, 21 December 2024)
- ML20024H176 + (03:38:02, 21 December 2024)
- ML20024H170 + (03:38:05, 21 December 2024)
- ML20024H168 + (03:38:07, 21 December 2024)