ML20024H234

From kanterella
Jump to navigation Jump to search
Rev 1 to Vogtle Electric Generating Plant Unit 2 Cycle 2 Core Operating Limits Rept.
ML20024H234
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/24/1991
From:
GEORGIA POWER CO.
To:
Shared Package
ML20024H220 List:
References
NUDOCS 9105300287
Download: ML20024H234 (10)


Text

_ .---. .- _ _ _ . _ . . ~ . - - _ _ . - __

(

l l-.

l l

V0GTLE ELECTRIC GENERATING PLANT (VEGP) UNIT 2 CYCLE 2 CORE OPERATING LIMITS REPORT REVISION 1 MAY 1991 l-l f

9105300287 910524 PDR ADOCK 05000424

-P PDR

.. .. - - . - - - . _ - - - - - . -. - _ . - . . . - ~ - - . - . - . . - . . . .. . . - -

, 1

-4 l

COLR for VEGP UNIT 2 CYCLE 2 l

l 1.0 CORE OPERATING LIM]TS REPORT This Core Operating Limits Report (COLR) for VEGP UNIT 2 CYCLE 2 has been prepared in accordance with the requirements of Technical Specification 6.8.1.6.

The Technical Specifications affected by this report are listed below:

3/4.1.1.1 SHUTDOWN MARGIN - MODES I and 2 3/4.1.1.2 SHUIDOWN MARGIN - MODES 3, 4 and 5 '

i 3/4.1.1.3 Moderator Temperature Coefficient 3/4.1.3.5 Shutdown Rod Insertion Limit 3/4.1.3.6 Control Rod Insertion Limits 3/4.2.1 Axial Flux Difference 3/4.2.2 Heat Flux Hot Channel Factor - Fa (Z) 3/4.2.3 Nuclear Enthalpy Rise Hot Channel Factor - Fh l-l l

REV. 1 PAGE 1 of 9

COLR for VfGP UNIT 2 CYCLE 2 2.0 J O FRATING llMITS The cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the following subsections. These limits have been develeped using the NRC-approved methodologies specified in Technical Specificat ion 6.8.1.6.

2.1 SHUTDOWN MARGIN - MODES 1 AND 2 (Specification 3/4.1.1.1) 2.1.1 The SHUTDOWN MARGIN shall be greater than or equal to 1.3X Ak/k.

2.2 SHUTDOWN MARGlN - MODES l 4 AND 5 (Specification 3/4.1.1.2) 2.2.1 The SHUTDOWN MARGIN shall be greater than or equal to the limits shown in Figures 1 and 2.

2.3 Moderator Temperature Coefficient (Specification 3/4.1.1.3) 2.3.1 The Moderator Temperature Coefficient (MIC) limits are:

The BOL/ARO/HZP - MTC shall be less positive than +0.7 x 10" Ak/k/ F for power levels up to 70% RTP with a linear ramp to 0 Ak/k/*F at 100X RTP.

The EOL/AR0/RTP-MTC shal' be less negative than -4.8 x 10" Ak/k/ F .

2.3.2 The MTC Surveillance iimit is:

The 300 ppm /ARO/RTP-MTC should be less negative than or equal to

-4.05 x 10' Ak/ k/'F.

where: BOL stands for Seginning of Cycle Life ARO stands for All Rods Out HZP stands for Hot Zero THERMAL POWER EOL stands for End of Cycle Life RTP stands for RATED THERMAL POWER 2.4 Shutdown Rod Insertion limit (Specification 3/4.1.3.5) 2.4.1 All shutdown rods shall be withdrawn to a position greater than or equal to 222 steps.

2.5 Control Rod Insertion timits (Specification 3/4.1.3.6) 2.5.1 The control rod banks shall be limited in physical insertion as shown in Figure 3. ,

l REV. 1 PAGE 2 of 9

COLR for VEGP UNIT 2 CYCLE 2 2.6 Axial Flux Difference (Specification 3/4.2.1)

(CAOC methodology) 2.6.1 The AXIAL FLUX DIFFERENCE (AFD) target band is 457:, -57 for core average accumulated burnup s 3000 MWD /MTV.

2.6.2 The AFD target band is +3%, -12n for core average accumulated burnup > 3000 MWD /MTV.

where: MWD /MTV stands for megawatt days / metric ton of initial uranium metal.

2.6.3 The AFD Acceptable Operation Limits are provided in Figure 4.

2.7 Heat Flux Hot Channel Factor - Fe (Z) (Specification 3/4.2.2)

(F y methodology}

RTP 2.7.1 f c(Z) s

  • K(Z) for P > 0.5 P

RTP Fa (Z) s

  • K(Z) for P s 0.5

0.5 where

P = THERMAL POWER RATED THERMAL POWER RTP 2.7.2 F a

- 2.30 2.7.3 K(Z) is provided in Figure 5.

REV. 1 PAGE 3 of 9

. . . _ . . _ _ _ . - . _ . . - _ _ _ _ _ - . _ . . _ . . _ _ _ _ _ _ _ _ _ _ - . _ . _ - . . _ _ . . _ . ~ . _ . . . _ _ _

. i COLR for VEGP UNIT 2 CYCLE 2 L RT P 2.7.4 Fxy = Fay * (1 4 PF,y * (1-P))

RTP where: 1. F,y is less than or equal to 1.95 for all core 1

planes containing Bank "0" control rod;.

2. For all unrodded core planes:

RTP F,y is less than or equal to 1.70 for core ele"ations up to and including 6.0 ft.

RTP F,y is less than or equal to 1.75 for core elevations above 6.0 ft.

2.7.5 PF,y = 0.2 2.8 Nuclear Enthalpy Rise Hot Channel Factor - Fy, (Specification 3/4.2.3)

RTP Fy, s F3 , *

(1 + N , * (1-N ) 3 where: P = THERMAL POWER RATED THERMAL POWER RTP 2.8.1 F, 3

= 1.55-l 2.8.2 PF 3g = 0.3 l

. , n .n o . u xa.uz REV. P.'tGE 4 of 9'

_ _ _ , . , - _. ~

_ . _ _ _ _ . _ . . ~ _ - , . - . . _ - . _ . . . _ . _ _ _ _ _ _ - - . . _ . _ _ _ _ _ . . . . -

COLR FOR VEGP UNIT 2 CYCLE 2 E\

n g

8' K

O w

8 o

N =

0 w :x e

ec a 42z -

E o c2 F r _o a

wsz w c U w

$ga $O k coh se 1 yao c $zO *g mz o*4 z P EE WE2 m <

c m g me W - wh ws n

z 8d 5 hE i

' D n z s =

2 3

- O t wo Ee u

z O

z" gg E- e ec -

CU Q

y *5 i'

s9 C== {

- e m m

g=

" C U @W5

><9 ago e C e

W y w =

o ,. ce M 0g o

< w

=

CF-C w c cc N

2 O

C O C C C

C C C.

Q .

O O o W ,- n n' -

1 (M/M ? %) HlDWYW f 4MOGinHS

- PAGE 5 of 9 REV. 1

_ . . . - __ - _ _ . . ~ . . . _ . - _ . - . __ _ _ _ . . _ . . _ _ . _ _ _ _ ,

. . s COLR FOR VEGP UNIT 2 CYCLE 2 M

E V

n k w 8

e E a n =

m C

<z 2

$9 =

wkz w O$9 5we

- 8 r

z ., w ' -

25c mg h- "z v5 9 c=

Esa C

N Em n 2 "k e

w w ac 2

8W N s g-s "O u -

u er z r c, se Z 20 cz 2 o 38

< e-e e o 8 r<z we- o t e

< m

-a

=c uwC u s. w 3 8 "p g em

<oe wa

=

$ M z 8 ~

m e o

w

- C E

m

{

- e E

o $ -

W e

C 8 8 8 8 8 8 i 4 6 n & o (M/)(v%) NID8VW NMOO10HS REV. 1 PAGE 6 of 9

r l

COLR FOR VEGP UNIT 2 CYCLE 2 I '

/ / '

E 200l [BANKB: [ l

I / / I g I /I l / I g y j

/i

/ 0 00.155) I

/E e I <0. isu y E i l I l/ BANK C l [l g I I I / l L / I I If I I 1/1 E W E /

'd E I I / l I E o E I l/ I i I/ 5 E' I I / I I / I 2 /i l /lBANKD l l*E I / I i

/

/ I l l I E

=

g

  • I/ /I I I

I /

I I I E 4 (O. 46)

/ l E

    • I '

/ E 20 I / I O

40 60 80 100 .

0 20 RELATIVE POWER (PERCENT) l FIGURE 3 l

RCD BANK INSERTION LIMITS VERSUS THERMAL POWER l

PAGE 7 of 9 REV. 1 l

l

- , ,j ,

140 i

120 UNACCEPTABLE 100 OPERATION (11,90)

)E

( 11,90) b 6 80 W [

r f

d 2

c W 60 ACCEPTABLE OPERATION O

w

( 31,50) (31,30)

E

e \

l \

I 40 l

20 l .

j 0 50

-10 0 10 20 30 40 f -50 -40 30 -20 FLUX DIFFERENCE, al (percent)

FIGURE 4 Ax!AL FLUX D]FFEREfiCE LIMITS AS A FUtiCT10fi 0F RATED THERM REV. 1 PAGE 8 of 9

^

- COLE FOR VEGP UNIT 2 CYCLE 2 1.50 1.25 1.00

@ 0.75 x

0.50 CORE HEIGHT K(2) 0.000 1.000 6.000 1.000 10.835 0.939 0.25 12.000 0.652 0

4.0 6.0 8.0 10.0 12.0 0 2.0 CORE HEIGHT (ft)

L l