Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20029C862 + (21:48:37, 20 December 2024)
- 0CAN049409, Discusses Letters Forwarded to Nrc,Regarding Intention to Install Voltage Regulator at ANO from 161 Kv Offsite Source.Schedule for Installation of Regulator Extended Until 940531 Due to Supplier Delay in Shipment + (21:48:39, 20 December 2024)
- ML20029C861 + (21:48:39, 20 December 2024)
- IR 05000344/1994002 + (21:48:48, 20 December 2024)
- ML20029C852 + (21:48:49, 20 December 2024)
- 05000301/LER-1994-001-01, :on 940323,identified That Feedwater Flow May Have Been Underestimated Since Beginning of Operating Cycle. Caused by Degradation of Signals from Transducers.Transducer Replaced + (21:48:51, 20 December 2024)
- ML20029C850 + (21:48:52, 20 December 2024)
- 05000324/LER-1994-004-02, :on 940329,penetration Leakage in Excess of TS Allowable Limit During Local Leak Rate Testing Identified. Troubleshooting & Analysis of Failure Mechanism in Progress. Suppl to Rept Will Be Submitted + (21:48:53, 20 December 2024)
- ML20029C848 + (21:48:55, 20 December 2024)
- ML20029C847 + (21:48:55, 20 December 2024)
- ML20029C846 + (21:48:56, 20 December 2024)
- NRC-94-4103, Advises That No Proprietary Info Found in 940419 Request for Addl Info Re AP600 + (21:48:57, 20 December 2024)
- ML20029C844 + (21:48:57, 20 December 2024)
- ML20029C842 + (21:49:00, 20 December 2024)
- ML20029C835 + (21:49:01, 20 December 2024)
- ML20029C837 + (21:49:01, 20 December 2024)
- ML20029C828 + (21:49:02, 20 December 2024)
- NRC-94-4100, Non-proprietary Westinghouse AP600 Ltr Rept, Radiation Heat Transfer Through Fog in Pccs Air Gap + (21:49:03, 20 December 2024)
- ML20029C823 + (21:49:05, 20 December 2024)
- ML20029C821 + (21:49:07, 20 December 2024)
- NRC-94-0022, Forwards Application for Renewal of NPDES Permit MI0037028 for Fermi 2,per Section 3.2 of Fermi 2 Environ Protection Plan + (21:49:07, 20 December 2024)
- ML20029C820 + (21:49:11, 20 December 2024)
- ML20029C818 + (21:49:13, 20 December 2024)
- ML20029C817 + (21:49:14, 20 December 2024)
- VPN-014-94, Forwards Rev to Security Plan (Defueled condition),PGE-1017. Rev Withheld in Accordance w/10CFR73.21 + (21:49:15, 20 December 2024)
- ML20029C813 + (21:49:17, 20 December 2024)
- ML20029C811 + (21:49:18, 20 December 2024)
- ML20029C809 + (21:49:18, 20 December 2024)
- RS-92-011, Proposed Tech Specs 3/4.1.3.1, Control Rod Operability, 3/4.1.3.2, Control Rod Max Scram Insertion Times & 3/4.10.2, Rod Pattern Control Sys + (21:49:26, 20 December 2024)
- ML20029C801 + (21:49:26, 20 December 2024)
- ML20029C796 + (21:49:30, 20 December 2024)
- ML20029C794 + (21:49:30, 20 December 2024)
- SVP-94-024, Responds to NRC Re Violations Noted in Insp Repts 50-456/94-06 & 50-457/94-06.Corrective Actions:Emergency Preparedness Training Administrative & Course Mgt Info (TSI-130-01) Will Be Revised + (21:49:32, 20 December 2024)
- ML20029C790 + (21:49:32, 20 December 2024)
- ML20029C786 + (21:49:34, 20 December 2024)
- U-602243, Proposed Tech Specs,Allowing Update to Rev of ASTM Std Utilized to Periodically Perform Lab Testing of Charcoal Adsorber Samples from 1979 Rev of ASTM D3803 to 1989 Rev + (21:49:35, 20 December 2024)
- ML20029C781 + (21:49:37, 20 December 2024)
- ML20029C779 + (21:49:38, 20 December 2024)
- ML20029C780 + (21:49:38, 20 December 2024)
- ML20029C777 + (21:49:39, 20 December 2024)
- ML20029C776 + (21:49:40, 20 December 2024)
- ML20029C775 + (21:49:40, 20 December 2024)
- ML20029C772 + (21:49:41, 20 December 2024)
- ML20029C774 + (21:49:41, 20 December 2024)
- 05000295/LER-1994-004-06, :on 930326,defeated Safeguards Actuation Signal Occurred Due to Lifted Leads on Two Motor Operated Valves. Caused by Personnel Error.Individuals Involved Counselled + (21:49:43, 20 December 2024)
- ML20029C770 + (21:49:44, 20 December 2024)
- ML20029C769 + (21:49:45, 20 December 2024)
- BSEP-94-0152, Responds to NRC Re Violations Noted in Insp Repts 50-324/94-04 & 50-325/94-02.Corrective Action:Temporary Rev Was Made to Periodic Test 4.1.1 to Ensure CAC-V216 Would Isolate on Group 6 Isolation Signal + (21:49:50, 20 December 2024)
- ML20029C762 + (21:49:52, 20 December 2024)
- ML20029C765 + (21:49:52, 20 December 2024)
- ML20029C761 + (21:49:53, 20 December 2024)
- ML20029C757 + (21:49:54, 20 December 2024)