ML20029C809

From kanterella
Jump to navigation Jump to search
Forwards Seabrook Station Annual Environ Operating Rept 1993, Per Requirements of Section 5.4 of Seabrook Station Environ Protection Plan.Technical Rept XXIV-1, Seabrook Environ Studies,1992 Characterization Of... Also Encl
ML20029C809
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 04/22/1994
From: Feigenbaum T
NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20029C810 List:
References
NYN-94050, NUDOCS 9404290218
Download: ML20029C809 (2)


Text

Q Mf

' W '> :{;

, ;L -

1 r

N:;-

t

! North Atlantic Energy Service Corporation PA <

= N Ortli.'

P.O. Box 300 1

s pp.

3 Atlantic-Seaar-t, mi m874 W

I

. (603) 474-9521, Fax (603) 474-29M

,9 The Northeast Utilities System J

Ted C. Feigenbaun -

Uw NYN-94050 Senior Vice President &

Chief Nuclear Officer

~

. April 22,1994 United States Nuclear Regulatory Commission t

V

, Washington, D.C. 20555 -

1 Attention; Document Control Desk L

References:

(a)

Facility Operating License No. NPF-86, Docket No. 50-443 (b)

National Pollutant Discharge Elimination System (NPDES) Permit No.

NII0020338

Subject:

Annual Environmental Operating Report

Gentlemen:

V n

Enclosed please find the Annual Environmental Operating Report for Seabrook Station. The enclosed report is a summary of the implementation of the Environmental Protection Plan (EPP) for the w,

@[

period.of January 1,1993 to December 31,'1993. This report is submitted pursuant to the requirements-M

- of Section 5.4 of the Seabrook Station Environmental Protection Plan.

[

Should you require further information regarding this matter, please contact Mr. James M. Peschel, 3

L Regulatory Compliance Manager at (603) 474-9521, extension 3772.

Very truly yours,

/

p Ted C. Feigen >aum L Enclosures

!TCF:MJM/act t

o,

/

2800ga

}

9404290218 940422 7

+-

- o PDR-ADOCK 05000443' R.

PDR j

4 4

w.,

I' l'

~

~):

a:

w.

y 4

United States Nuclear Regulatory Commission April 22,1994 Attention:

Document Control Desk'.

Page two -

ec without enclosures:

Mr. Thomas T. Martin i

Regional Administrator l

United States Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Mr. Albert W. De Agazio, Sr. Project Manager Project Directorate I-4 Division of Reactor Projects U.S. Nuclear Regulatory Commission -

Washington, DC 20555 Mr. Antone C. Cerne NRC Senior Resident inspector P.O Box i149 Seabrook, NH 03874 4

9 d..

s v

..