Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NRC-94-4109, Forwards Proprietary Sketches on Design of Stage 4 of Automatic Depressurization Sys,In Support of Response to NRC RAI on AP600 (Q952.64).Sketches Withheld (Ref 10CFR9.17(a)(4)) + (21:36:21, 20 December 2024)
- ML20029D771 + (21:36:35, 20 December 2024)
- ML20029D828 + (21:35:51, 20 December 2024)
- ML20029D797 + (21:36:19, 20 December 2024)
- ML20029D801 + (21:36:13, 20 December 2024)
- IR 05000443/1994003 + (21:36:00, 20 December 2024)
- ML20029D786 + (21:36:27, 20 December 2024)
- PNO-III-94-033, on 940429,three Mci iodine-131 Sodium Iodium Capsule Missing in Transit.Licensee Confirmed That Package Delivered to Mercury Delivery Co in Tx.State of Mo Notified + (21:36:30, 20 December 2024)
- IR 05000333/1994011 + (21:36:04, 20 December 2024)
- PNO-III-94-032, on 940420,cracks Found in Reactor Core Shroud H5 at Two Facilities.Licensee Developed Action Plan & Assembled Project Team to Characterize Crack & Develop Repair Options + (21:36:09, 20 December 2024)
- 05000263/LER-1989-021, :on 890916,crack Was Discovered on Upper Support Brace of One Jet Pump Riser.Caused by High Cycle Fatigue.Testing Has Demonstrated That Cracking Is Self Limiting + (21:36:25, 20 December 2024)
- 05000327/LER-1994-005, :on 940403,inadvertent Fwis Occurred.Caused by Personnel Failure to Follow Work Document Instructions. Corrective Action:Individuals Were Counseled on Requirements to Follow Work Document Instruction Steps + (21:36:02, 20 December 2024)
- IR 05000440/1994004 + (21:35:50, 20 December 2024)
- 0CAN059402, Responds to Severity Level III Problem During Insp of Activities Re Failure to Recognize That ANO Unit 1,exceeded TS Required Limiting Condition for Operation + (21:34:56, 20 December 2024)
- 05000334/LER-1994-003-01, :on 940404,two Flow Orifices Were Improperly Installed.Caused by Improper Installation of All Accessible Flow Orifices.Personnel Performed Procedure Ost 1.6.4 Correcting Improperly Installed Orifices + (21:36:12, 20 December 2024)
- 05000336/LER-1994-006-01, :on 940407,plant Did Not Meet Requirements of LCO 3.7.6.1 Re Two Independent Control Room Emergency Ventilation Sys.Caused by Inadequate Work Organization. Corrective Action:Revised OP 2315A + (21:34:51, 20 December 2024)
- 05000282/LER-1994-002-01, :on 940303,noble Gas Monitor in R-35 Did Not Respond When source-checked During Surveillance.Caused by Component Failure.Corrective Actions:Monitor Repaired & Returned to Svc + (21:36:32, 20 December 2024)
- ML20029D796 + (21:36:19, 20 December 2024)
- ML20029D845 + (21:34:54, 20 December 2024)
- ML20029D838 + (21:34:59, 20 December 2024)
- ML20029D822 + (21:35:58, 20 December 2024)
- ML20029D825 + (21:35:56, 20 December 2024)
- ML20029D839 + (21:34:58, 20 December 2024)
- ML20029D847 + (21:34:53, 20 December 2024)
- ML20029D848 + (21:34:52, 20 December 2024)
- ML20029D768 + (21:36:37, 20 December 2024)
- ML20029D751 + (21:36:45, 20 December 2024)
- ML20029D704 + (21:37:01, 20 December 2024)
- ML20029D703 + (21:37:02, 20 December 2024)
- ML20029D673 + (21:37:32, 20 December 2024)
- ML20029D670 + (21:37:32, 20 December 2024)
- ML20029D660 + (21:37:40, 20 December 2024)
- ML20029D658 + (21:37:41, 20 December 2024)
- ML20029D645 + (21:37:58, 20 December 2024)
- ML20029D644 + (21:37:59, 20 December 2024)
- ML20029D641 + (21:38:01, 20 December 2024)
- L-PI-20-001, License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-1 + (21:37:05, 20 December 2024)
- IR 05000424/2019004 + (21:37:30, 20 December 2024)
- ML20029D667 + (21:37:34, 20 December 2024)
- ML20029D651 + (21:37:54, 20 December 2024)
- TAC:M85762 + (21:37:08, 20 December 2024)
- TAC:M88479 + (21:37:39, 20 December 2024)
- ML20029D691 + (21:37:08, 20 December 2024)
- 05000302/LER-1994-002, :on 940404,performance of Surveillance Check Power Distibution Breaker Alignment & Power Availability Verification Resulted in Entry Into LCO 3.0.3.Caused by Procedure Error.Procedures Revised + (21:36:38, 20 December 2024)
- 05000412/LER-1994-005, :on 940407,chain Locking Mechanism on CP Suction Isolation Valve,Was Found Broken.Caused by Personnel Error.Corrective Action:New Chain Placed on Valve Handwheel & Chain Locking Mechanism Intacted + (21:37:42, 20 December 2024)
- 05000354/LER-1994-003-02, :on 940405,loss of Shutdown Cooling Occurred Due to an Inadvertent High Reactor Pressure Isolation Signal.Corrective Action:Operations Department Procedure Used to Restore Shutdown Cooling Isolations + (21:37:38, 20 December 2024)
- IR 05000327/1994011 + (21:36:51, 20 December 2024)
- ML20029D677 + (21:37:25, 20 December 2024)
- ML20029D739 + (21:36:55, 20 December 2024)
- NRC-94-4104, Forwards Nonproprietary Rev 1 to WCAP-13389, AP600 Phenomological Evaluation Summaries + (21:37:54, 20 December 2024)
- IR 05000400/1994008 + (21:36:47, 20 December 2024)