Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20030C324 + (20:38:57, 20 December 2024)
- ML20030C323 + (20:38:59, 20 December 2024)
- ML20030C322 + (20:38:59, 20 December 2024)
- BSEP-81-0097, Ro:On 810115,during Attempt to Start Reactor Core Isolation Cooling Sys,Lube Oil Cooling Valve F042 Would Not Open. Caused by Bad Connection in Local Remote Key Lock Switch on Remote Shutdown Panel.Switch Fixed + (20:39:00, 20 December 2024)
- ML20030C320 + (20:39:05, 20 December 2024)
- ML20030C319 + (20:39:05, 20 December 2024)
- ML20030C318 + (20:39:06, 20 December 2024)
- ML20030C317 + (20:39:07, 20 December 2024)
- ML20030C316 + (20:39:08, 20 December 2024)
- ML20030C314 + (20:39:09, 20 December 2024)
- ML20030C315 + (20:39:09, 20 December 2024)
- B10241, Forwards Reactor Containment Bldg Integrated Leak Rate Test, Per Section V.B. of App J to 10CFR50 & Facility Tech Spec 6.9.2.b + (20:39:10, 20 December 2024)
- ML20030C310 + (20:39:12, 20 December 2024)
- ML20030C309 + (20:39:14, 20 December 2024)
- ML20030C307 + (20:39:15, 20 December 2024)
- ML20030C306 + (20:39:16, 20 December 2024)
- IR 05000313/1981019 + (20:39:17, 20 December 2024)
- ML20030C304 + (20:39:18, 20 December 2024)
- ML20030C302 + (20:39:19, 20 December 2024)
- ML20030C301 + (20:39:20, 20 December 2024)
- ML20030C299 + (20:39:21, 20 December 2024)
- ML20030C298 + (20:39:22, 20 December 2024)
- ML20030C296 + (20:39:23, 20 December 2024)
- IR 05000313/1981023 + (20:39:26, 20 December 2024)
- ML20030C294 + (20:39:28, 20 December 2024)
- L-81-129, Final Deficiency Rept Re Local Control Station Selector Switches,Initially Reported 810226.When Const Personnel Terminate Cables,Selector Switches from Panel Will Be Removed & Installed Correctly W/Proper Torque + (20:39:29, 20 December 2024)
- ML20030C288 + (20:39:31, 20 December 2024)
- ML20030C287 + (20:39:32, 20 December 2024)
- ML20030C284 + (20:39:33, 20 December 2024)
- A01852, Forwards Addl Info Re SEP Topic II-3.A, Hydrologic Description & SEP Topic II-3.B, Flooding Potential & Protection Requirements, Per NRC 810710 Request.Eight Oversize Drawings Encl.Aperture Card Is in PDR + (20:39:34, 20 December 2024)
- ML20030C281 + (20:39:37, 20 December 2024)
- ML20030C279 + (20:39:39, 20 December 2024)
- ML20030C278 + (20:39:40, 20 December 2024)
- ML20030C277 + (20:39:41, 20 December 2024)
- ML20030C274 + (20:39:41, 20 December 2024)
- 05000270/LER-1981-007-01, /01T-0:on 810326,during Periodic Test,Auto/Manual Transfer Switches for B1T-8 & B2T-5 Incorrectly Placed in Manual Position & Not Returned After Test Completion.Caused by Personnel Error.Switches Restored to Auto Position + (20:39:43, 20 December 2024)
- ML20030C271 + (20:39:45, 20 December 2024)
- IR 05000267/1981014 + (20:39:46, 20 December 2024)
- ML20030C266 + (20:39:48, 20 December 2024)
- ML20030C264 + (20:39:49, 20 December 2024)
- 05000270/LER-1981-007, Forwards LER 81-007/01T-0.Detailed Event Analysis Encl + (20:39:50, 20 December 2024)
- ML20030C261 + (20:39:52, 20 December 2024)
- ML20030C260 + (20:39:53, 20 December 2024)
- ML20030C256 + (20:39:54, 20 December 2024)
- ML20030C254 + (20:39:55, 20 December 2024)
- ML20030C253 + (20:39:56, 20 December 2024)
- ML20030C252 + (20:39:57, 20 December 2024)
- ML20030C251 + (20:39:58, 20 December 2024)
- ML20030C250 + (20:39:59, 20 December 2024)
- ML20030C249 + (20:40:00, 20 December 2024)
- IR 05000275/1981011 + (20:40:01, 20 December 2024)