ML20030C266

From kanterella
Jump to navigation Jump to search
Forwards Amend 32 to Fsar,Consisting of Responses to NRC Questions.Also Forwards List of Round 1 Questions Answered
ML20030C266
Person / Time
Site: Byron, Braidwood, River Bend  
Issue date: 08/18/1981
From: Tramm T
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20030C267 List:
References
NUDOCS 8108250590
Download: ML20030C266 (6)


Text

y D Comm:nwrith Edison O ) one First National Plaza. Chicago, Illinois O-Address Reply to: Post Office Box 767

(

Chicago, Illinois 60690 A

August 18, 1981 p\\

g nIbD 3

Mr. Harold R.

Denton, Director

-c 2 41981 >

Office of Nuclear Reactor Regulation y,s,,arma naumsa 3 l

U.S. Nuclear Regulatory Commission U

c **"* "

Washington, DC 20555 0

Subject:

Byron Station Units 1 and 2 Braidwood Station Units 1 and 2 FSAR Amendment No. 32 4

NRC Docket Nos. 50-454, 50-456, 50-457 and 50-458

Dear Mr. Denton:

s The application for construction permits and operating licenses for Byron Units 1 and 2 and Braidwood Station Units 1 and 2, docketeo September 20, 1973, are hereby amended by submittal of Amendment 32 pursuant to Section 50.34 of 10CFR50.

4 i

Amendment 32 to the Byron /Braidwood FSAR consists of responses to questions from Auxiliary Systems Branch (010 series),

the Instrumentation and Control Systems Branch (031 series), the Power Systems Branch (040 series), the Mechanical Engineering Branch (110 series), the Reactor Systems Branch (212 series), the Geotechnical Engineering Branch 362 series), and the Quality l

Assurance Branch (421 series).

j Also included are revised responses to questions 040.1, 212.19 and 212.20, and voluntary revisions to the FSAR text.

Attachment A to this letter lists the questions answered in this amendment.

Attachment B lists the questions that will be answered in future amendments.

i l

Three (3) signed originals and fifty-seven (57) copies of

]

this amendment are submitted for your review and approval.

i j

Very truly yours, I

h?o?&

i T. R.

Tramm Nuclear Licensing Administrator i

SUBSCRIBED AND Sq0F to before me this

/M =

day of (ju/vrof 1981.

O N ell l1.

0 Q C f #W 0

Nopary Public p

h$

2430N 8108250590 810818 PDR ADOCK 05000454 K

PM

_. _. _ _ _ -., _. _ _ _. _. -.. ~ _. - _,. _.. ~ _. _.

NRC Oocket Nos. 50-454/455 50-456/457 l

ATTACHMENT A List of Round One Questions Answered In Byron /Braidwood FSAR Amendment No. 32 I.

Instrumentation and Control Systems Branch (Series 031.19 - 031.38)

The following questions have been responded to in this amendment:

031.3 031.20 031.12 031.22 II.

Instrumentation and Control Systems Branch (Series 031.39 - 031.43)

The following questions have been responded to in this amendment:

031.39 031.42 031.41 III.

Power Systems Branch (Series 040.36 - 040.75)

The following question has been responded to in this amendment:

4 040.73 IV.

Power Systems Branch (Series 040.76 - 040.161)

The following questions have been responded to in this amendment:

040.82 040.112 040.95 040.136 I

V.

Mechanical Engineering Branch (Series 110.63, 110.64)

}

The following question has been responded to in this amenament:

110.64 1

VI.

Reactor Systems Branch (Series 212.12 - 212.86)

The following question has been responded to in this amendment.

212.40 VII.

Geotechnical Engineering Branch (Series 362.01 - 362.09)

The following questions have been responded to in this amendment:

362.5 362.9 362.6

Attachment A List of Second Round Questions Answered In Byron /Braidwood FSAR Amendment No. 32.

I.

Auxiliary Systems Branch (Series 010.37 - 010.53)

The following questions have been responded to in this amendment:

010.44 010.50 c

II.

Quality Assurance Branch (Series 421.19, 421.20)

The following question has been responded to in this amendment:

421.20 1

2430N

i NRC Docket Nos. 50-454/455 50-456/457 ATTACHMENT B List of Round One and Round Two Questions Not Answered in Byron /Braidwood FSAR Amendment 32 1.

Auxiliary Systems Branch (Series 010.0)

The following seven questions will be answered in future FSAR amendments:

010.38 010.42 010.40 010.47-010.49 010.52 II.

Instrumentation and Control Systems Branch (Series 031.0)

The following two questions will be answered in future FSAR i

amendments:

031.40 031.43 III.

Power Systems Branch (Series 040.0)

The following seven questions will be answered in future FSAR amendments:

040.14 040.166-040.170 040.143 IV.

Mechanical Engineering Branch (Series 110.0)

The following four questions will be answered in future FSAR amendments:

110.14 110.62 110.58 110.63 V.

Structural Engineering Branch (Series 130.0)

The following two questions will be answered in future FSAR amendments:

130.06 130.09 4

Attachment B VI.

Reactor Systems Branch (Series 212.0)

The following nine questions will be answered in future FSAR amendments:

212.22 212.127 212.23 212.135 212.85 212.138 212.103 212.144 212.112 VII.

Accident Analysis Branch (Series 311.0)

The following question will be answered in a future FSAR amendment:

311.33 VIII.

Radiological Assessmen1 Branch (Series (331.0)

The following thirteen questions will be answered in future FSAR amendments:

331.03 331.24-331.35 IX.

Geotechnical Engineering Branch (Series 362.0)

The following six questions will be answered in future FSAR amendments:

362.1-362.4 362.8 362.7 X.

Hydrologic Engineering Branch (Series 371.0)

The following eight questions will be answered in future FSAR amendments:

371.11-371.18 XI.

Quality Assurance Branch (Series 421.0, 423.0)

The following two questions will be answered in future FSAR amendments:

421.19 423.12 3

XII.

Operator Licensing Branch (Series 441.0)

The following seven questions will be answere1 in future-FSAR amendments:

441.1-441.7

Attachment B

-3_

XIII.

Fire Protection (Series 600.0)

The following question will be answered in a future amendment:

600.01 4

1 1

2430N 1

l

....