Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20033C074 + (15:05:58, 20 December 2024)
- ML20033C072 + (15:05:59, 20 December 2024)
- ML20033C070 + (15:06:00, 20 December 2024)
- ML20033C071 + (15:06:00, 20 December 2024)
- ML20033C069 + (15:06:01, 20 December 2024)
- ML20033C068 + (15:06:02, 20 December 2024)
- 05000321/LER-1981-120-01, /01T-0:on 811105,AE Notified Site That W/Main Steam Line or Scram Discharge Line Break,Torus Room Temp May Rise to Isolate Hpci/Rcic Sys from Hi Ambient Temp Signal. Caused by Structural Need to Vent Steam to Torus Room + (15:06:03, 20 December 2024)
- ML20033C066 + (15:06:04, 20 December 2024)
- RBG-11-668, Responds to Generic Ltr 81-32, NUREG-0737,Item II.K.3.44- Evaluation of Anticipated Transients W/Single Failure. Analyses Assumption & Initial Conditions Used for Generic Analyses Are Representative for Facility + (15:06:05, 20 December 2024)
- ML20033C064 + (15:06:07, 20 December 2024)
- ML20033C063 + (15:06:08, 20 December 2024)
- ML20033C062 + (15:06:09, 20 December 2024)
- ML20033C061 + (15:06:09, 20 December 2024)
- ML20033C060 + (15:06:10, 20 December 2024)
- ML20033C059 + (15:06:11, 20 December 2024)
- ML20033C058 + (15:06:12, 20 December 2024)
- ML20033C055 + (15:06:17, 20 December 2024)
- ML20033C054 + (15:06:18, 20 December 2024)
- ML20033C053 + (15:06:18, 20 December 2024)
- ML20033C051 + (15:06:19, 20 December 2024)
- 05000338/LER-1981-080-03, /03L-0:on 811021,response Time for 1J Emergency Bus Undervoltage Signal Was Longer than Tech Spec Permits. Caused by Drift of Time Delay Relay.Relay Recalibr + (15:06:21, 20 December 2024)
- ML20033C049 + (15:06:23, 20 December 2024)
- ML20033C048 + (15:06:24, 20 December 2024)
- ML20033C046 + (15:06:28, 20 December 2024)
- ML20033C045 + (15:06:29, 20 December 2024)
- 05000338/LER-1981-080, Forwards LER 81-080/03L-0 + (15:06:34, 20 December 2024)
- ML20033C041 + (15:06:35, 20 December 2024)
- ML20033C042 + (15:06:35, 20 December 2024)
- ML20033C040 + (15:06:37, 20 December 2024)
- ML20033C039 + (15:06:39, 20 December 2024)
- FVY-81-171, Discusses NUREG-0737,Item II.B.3,post-accident Sampling Capability.Commitment to Compulsory post-accident Sampling & Analysis of Chlorides Would Not Be Worth Personnel Exposure to Perform Task + (15:06:40, 20 December 2024)
- 05000339/LER-1981-081-03, /03L-0:on 811022,23 & 30,containment Particulate Radiation Monitor RMS 259 Removed from Svc After Failing Low.First Event Caused by Failed Detector.Second & Third by Faulty Connection on Field End of Detector Cable + (15:06:43, 20 December 2024)
- ML20033C036 + (15:06:44, 20 December 2024)
- 05000339/LER-1981-081, Forwards LER 81-081/03L-0 + (15:06:45, 20 December 2024)
- ML20033C033 + (15:06:46, 20 December 2024)
- ML20033C032 + (15:06:47, 20 December 2024)
- ML20033C030 + (15:06:48, 20 December 2024)
- ML20033C029 + (15:06:50, 20 December 2024)
- ML20033C028 + (15:06:51, 20 December 2024)
- ML20033C027 + (15:06:52, 20 December 2024)
- ML20033C026 + (15:06:53, 20 December 2024)
- ML20033C023 + (15:06:54, 20 December 2024)
- ML20033C021 + (15:06:55, 20 December 2024)
- ML20033C020 + (15:06:56, 20 December 2024)
- ML20033C019 + (15:06:57, 20 December 2024)
- ML20033C018 + (15:06:58, 20 December 2024)
- ML20033C017 + (15:06:59, 20 December 2024)
- 05000339/LER-1981-079-03, /03L-0:on 811103,delta Flux Exceeded 15% of Target Flux Difference.Caused by Withdrawal of Control Rods in Preparation for Monthly Control Rod Operability Surveillance.Rods Driven Back,Returning Flux to Target Band + (15:07:01, 20 December 2024)
- ML20033C015 + (15:07:02, 20 December 2024)
- ML20033C014 + (15:07:03, 20 December 2024)
- 05000339/LER-1981-079, Forwards LER 81-079/03L-0 + (15:07:05, 20 December 2024)