ML20033C072

From kanterella
Jump to navigation Jump to search
Forwards Interim Deficiency Rept Re Steam Generator Sliding Base Bearing Plate Surface Finish
ML20033C072
Person / Time
Site: Satsop
Issue date: 11/24/1981
From: Leddick R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Stello V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20033C073 List:
References
GO3-81-2788, NUDOCS 8112020632
Download: ML20033C072 (1)


Text

.

n Public Power Supply System

]J3 g

, Washington 98541 (206)482-4428 fyd,ws-6:

DEC1 u.a.$mY d'

S N

November 24, 1981 G03-81-2788 Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington D. C.

20555 Attention:

Mr. V. Stello Gentlemen:

Subject:

PROJECT NOS. 3 AND 5 DOCKET NUMBERS 50-508 AND 50-509 INTERIM REPOPT OF POTENTIAL 10CFR50.55(e)

SOUTH STEAM GENERATOR BEARING PLATES, UNIT 3 (D/N #038)

Attached is a copy of the interim report provided to Region V con-cerning a potential 10CFR50.55(e) associated with the surface finish of Unit 3 Steam Generator bearing plates.

Should you have any questions or desire further information, please contact me directly.

Very truly yours,

/,'

. S. Led ick Program Director, WNP-3/5 cc:

J. Adams - NESCO-WO/A D. Smithpeter - BPA-WO/A Ebasco - New York-WO/A WNP-3/5 Files - Richland-WO/A So I 0112020632 811124 PDR ADOCK 05000508 S

PDR

T tis u. tie n si,iisnin co..t'.n r:azuT t:o.

i.v,. ni.uucoT'On Tsiis t.tTTEn snoast lux.s r:0TI EsTA3t.tsH A f:EC CC.*..' 8%).' *.

8'c 7 N-d 7/ 3' 11TMENT CONTROL-WO/A JA PUZAUSKAS-WO/A tvPPss conntspo.vott:ce reo.

ING-WO/A DL QUA!@iE-WO/A E FILES-WO/A JP SLUKA-WO/A

\\LBERT/tiRC-W/A-OE TRAPP-WO/A

00DY-W/A JE WERLE-WO/A
UTRONA-WO/A KA KIRKEVOLD-y/A 30BSON-WO/A c

20RAN-WO/A E

3LASSt0CK1280-W/A November 24, 1981

~E

.0VE-WO/A G03-81-2783
)'SULLIVAN/270-W/A

)ECK-WO/A U. S. Nuclear Regulatory Commission, Region V

. h Office of Inspection and Enforcement P

1450 Maria Lane, Suite 210 M

Walnut Creek, California 94596-5368 a

a Attention:

Mr. 'B. H. Faulkenberry

\\

5 6 Chief, Reactor Construction Projects Branc

'j?

?

E m"

Gentlemen:

k

Subject:

FROJECT NOS. 3 AND 5 COCKET NUMBERS 50-508 AND 5 s

pg INTERIM REPORT OF POTENTI A "F

0.5 i~

~

SOUTH STEAM GENERATOR BEAR'N P 1 S, p (D/N #038) 5

% I N

M e s

I

Reference:

Supply System Rec r o Tele n,

. Puzauskas e p to to Bob Dodds/Dend is He dat 0 ober 19,1981.

S%

9 i

Attached is an Interim Report f - t pc mential 10CFR50.55(e) concern-D4 ing surface finish of Unit 3 Stea. Gene ator No. 2 bearing plates.' A Final Report will be provided by Jan ry 8, 1982.

\\.(

3 s

(

o Should yo ay/any questions.or desire further information, please contact me.dirpdQy.

v

\\

/

x

\\

Very truly you'rs,

\\

w_

g m

/C b

R.

dick Program Director, WNP-3/5 E

/

)

P

?

cc:

J. Adams - NESCO a

D. Smithpeter - BPA M

Ebasco - New York WNP-3/5 Files - Richland 8

e U

O O

8 <

l

!E ly g.

99%

E O c

d M 3