ML20033C029

From kanterella
Jump to navigation Jump to search
Part 21 Rept Re Wrapper Plates Supplied to Bechtel Corp for Pipe Support Installation at Facility.Plates Fabricated from Inconel 718 Alloy Instead of Required 304 Stainless Steel.Requests Reportability Determination
ML20033C029
Person / Time
Site: San Onofre 
Issue date: 11/23/1981
From: Peet W, Sandra Walker
AMETEK, Paragon Energy Solutions, INC.
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
REF-PT21-81-527-000 PT21-81-527, PT21-81-527-000, NUDOCS 8112020587
Download: ML20033C029 (2)


Text

AMETEK STRAZA DIVISION

  • 790 GREENFIELD DRIVE, P.O. BOX 666, EL CA]ON,CA 92022 TELEX: 69-5436 TELEPHONE (714) 442-3451 November 23, 1981 m

d p

Richard C. DeYoung, Director J

[

Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 1 DE01 iggb -/

Washington, D. C. 20555

- ( u.s =N$W"* Q)

Co*

Subject:

10CFR21 Inquiry and Request for Ruling 7

p

Reference:

Southern California Edison Deficiency g

Evaluation Report AD12-IR(81-20)

Gentlemen:

We hereby request a specific ruling on the applicability-to a supplier-of the notification requirements of 10CFR21.21(b). The facts in this specific case are as follows:

1)

We, AMETEK, Straza Division, were notified by our customer, Bechtel Power Corporation, that certain of the Wrapper Plates we supplied to them for pipe support installation at San Onofre Unit 3 were found to have been fabricated from Inconel 718 alloy in lieu ef the required 304 Stainless Steel.

2) Bechtel's investigation provided us with a determination of the total amount of discrepant material supplied to them.
3) AMETEK's investigation verified that all discrepant material came from one (1) misidentified sheet of material, all parts and remnants from that specific sheet have been accounted for, no similarly discrepant material has been supplied to any other customer or plant site, and suitable corrective actions have been taken or planned to preclude recurrences.
4) Bechtel has furnished us with documentation attesting to Southern California Edison's confirmation that this condition has been reported to the NRC in accordance with the require-ments of 10CFR50.55(e).

fh 8112O20587 811123 61 p PDR ADOCK 05000362 1

S pop

AMETEK STRAZA DIVISION Richard C. DeYoung November 23, 1981 A>1ETEK, Straza Division has reviewed the requirements of 10CFR21, NUREG-0302, and our internal 10CFR21 reporting procedure. We believe from this review that the facts as set forth above satisfy the conditions stated in the last sentence of 10CFR21.21(b)(1,:

"The above notification is not required if such individual has actual knowledge that the commission has been adequately informed of such defect or such failure to comply".

Accordingly, we have determined that, in this case, duplicate reporting is not required. We will, of course, respond to any requests from the NRC for additional information as required by 10CFR21.21(c).

However, since reasonable and knowledgeable men tend to disagree on 10CFR21 notification requirements, and since we, as a responsible supplier of nuclear power plant items, wish to at all times comply with the official interpretation of these requirements, we respectfully request a ruling on the following ques-tion:

"Is it the position of the Nuclear Regulatory Commission that the notification requirement of 10CFR21.21(b) does not apply to a supplier provided that (1) he has actual knowledge that the purchaser or licensee has notified the NRC of the defect or failure to comply pursuant to 10CFR50.55(e), and (2) his evaluation confirms that the defect or failure to comply does not affect any nuclear power plant site for which a 10CFR50.55(e) notification has not been submitted?"

Respectfully, AMETEK, Straza Divisio.n f

l U'-

Wendell J. PeeC/ PE Director of QualJty Assurance Approved:

d(v S. A. Walker, President