- ML20035A764 + (10:56:49, 20 December 2024)
- ML20035A691 + (10:58:23, 20 December 2024)
- U-602114, Lists Present Levels of Property Insurance & Sources of Insurance for Facility + (10:57:48, 20 December 2024)
- ML20035A693 + (10:58:22, 20 December 2024)
- ML20035A688 + (10:58:25, 20 December 2024)
- ML20035A724 + (10:57:47, 20 December 2024)
- ML20035A671 + (10:58:38, 20 December 2024)
- ML20035A714 + (10:58:03, 20 December 2024)
- ML20035A674 + (10:58:36, 20 December 2024)
- ML20035A756 + (10:56:58, 20 December 2024)
- ML20035A704 + (10:58:13, 20 December 2024)
- LIC-93-0097, Forwards Decommissioning Cost Study for Fort Calhoun Station Unit 1, Rev 1 + (10:57:24, 20 December 2024)
- B14403, Application for Amend to License DPR-21,revising TS LCO 3.6B,SR 4.6.B,Figures 3.6.1,3.6.2 & 3.6.3 Along W/Bases for Section 3.6 W/Respect to pressure-temp Limit Curves.Rev 1 to GE-NE-523-165-1292 Encl + (10:56:50, 20 December 2024)
- LIC-93-0098, 1992 OPPD Annual Rept + (10:56:55, 20 December 2024)
- B14411, Advises That Written Reactor Operator & Senior Reactor Operator Licensing Exams & Operating Tests Scheduled for Wks of 930419 for Millstone Unit 3 & 930426 for Haddam Neck Plant.Exams Will Be Conducted Per NUREG-1021,Rev 7 + (10:57:50, 20 December 2024)
- JPN-93-020, Describes Completion of Four Remaining Tasks Associated W/ GL 88-14, Instrument Air Supply Problems Affecting Safety- Related Equipment. Two air-operated Valves Replaced W/Spool Pieces & Test Results Assessed + (10:57:44, 20 December 2024)
- 05000374/LER-1993-002-06, :on 930223,RCIC Sys Declared Inoperable When Required Sys Flow of 600 Gpm Could Not Be Obtained.Caused by Inoperable Turbine Control Box.Work Request L21599 Written to Investigate & Repair Problem + (10:58:28, 20 December 2024)
- JPN-93-016, Forwards Response to NRC Second Request for Addl Info Re Power Uprate Submittal Concerning Effects of Increased Process & Ambient Temp & Pressures on Instrument Accuracy. Calculations Supporting Response Encl + (10:58:06, 20 December 2024)
- BSEP-93-0041, Part 21 Rept Re Mfg Defects Associated W/Westinghouse Type Hmcp & Type Hfd Breakers,Resulting in Possibility That Breaker Contacts May Not Open During Trip.Initially Reported on 930225.Functional Testing Procedures Revised + (10:56:59, 20 December 2024)
- 05000414/LER-1993-001-01, :on 930221,essential Auxiliary Power Sys Blackout Occurred When DG 2B Removed from Svc.Caused by Missed Procedure.On 930222,problems W/Train a CR Area Ventilation Sys Occurred.Procedures Revised + (10:57:53, 20 December 2024)
- B14360, Application for Amend to License DPR-61,revising TS 3.8.3.2.b to Allow Use of Tie Breakers 6T11 & 11T6 to Facilitate Energizing Bus 11 & Bases Section 3/4.4.4 to Address Failure of Pressurizer Pressure Channel + (10:57:01, 20 December 2024)
- 1CAN039303, Application for Amend to License DPR-51,updating RCS Leakage Test Pressure in TS 4.3.2 to Agree W/Requirements of ASME Boiler & Pressure Vessel Code,Section XI (Through Winter 1981 Addenda) + (10:57:40, 20 December 2024)
- 0CAN039308, Submits Request for Extension to Complete Generic Ltr 89-10, Safety-Related Motor-Operated Valve Testing & Surveillance, Recommendations + (10:57:36, 20 December 2024)
- 05000373/LER-1993-005-02, :on 930222,two High Radiation Doors Were Found Unsecured.Caused by Blown Fuse on C Phase Output of Static Switch.Alarm on Doors Investigated & Secured + (10:58:19, 20 December 2024)
- JPN-93-021, Forwards Inservice Insp Summary Rept,1992 Refuel Outage (Reload 10/Cycle 11), Consisting of Results of Jet Pump Beam Insps Performed Per NRC Bulletin 80-07 & Access Hole Cover Insps Performed Per GE SIL 462 + (10:57:08, 20 December 2024)
- ML20035A665 + (10:58:42, 20 December 2024)
- 05000269/LER-1993-003-01, :on 930218,determined That Ssf Rcmu Pump Was Inoperable Due to Design Deficiency.Pressure Vented from Rcmu Pump Suction Stabilizers,Procedures Revised & Design Basis Document Completed + (11:00:18, 20 December 2024)
- 05000327/LER-1992-013-01, Forwards Revised LER 92-013-01 Changing Corrective Actions Concerning Nonconservative Mass & Energy Releases Used to Calculate Pressures in Main Steam Valve Vaults During Main Steam Line Break + (11:00:26, 20 December 2024)
- JPN-93-019, Forwards Rev 4 to Re-Rating of Battery Chargers for New York Power Authority Ja Fitzpatrick Nuclear Power Plant + (11:00:12, 20 December 2024)
- GO2-82-862, Responds to 820809 Request for Addl Info Re Fuel Rod Corrosion Measures + (11:01:52, 20 December 2024)
- BECO-93-038, Forwards List of ISI Exams Scheduled as Part of Third Period of Pilgrim Second Ten Yr Insp Interval in Accordance W/ Section XI of ASME Boiler & Pressure Vessel Code + (10:58:51, 20 December 2024)
- B14413, Provides Addl Info Re Schedular Exemption from Type B & C Test Requirements for Millstone Nuclear Power Station Unit 1,10CFR50,App J + (11:01:00, 20 December 2024)
- IR 05000255/1993004 + (10:59:39, 20 December 2024)
- IR 05000341/1993005 + (11:00:30, 20 December 2024)
- ET-NRC-93-3848, Forwards Draft AP600 Test Programs for Comments on Matrix by 930401 & to Be Finalized by 930415 + (10:58:46, 20 December 2024)
- IR 05000150/1993003 + (11:00:08, 20 December 2024)
- IR 05000266/1993007 + (11:00:03, 20 December 2024)
- ML20035A613 + (10:59:58, 20 December 2024)
- ET-NRC-93-3845, Forwards Proprietary Info Presented at 930323-24 Meeting on AP600, Containment Test Program. Encl 1 Withheld (Ref 10CFR9.17(a)(4)).Nonproprietary Version of Info Presented at Subj Meeting Encl + (11:01:21, 20 December 2024)
- IR 05000254/1993003 + (10:59:38, 20 December 2024)
- ML20035A541 + (11:01:28, 20 December 2024)
- ML20035A591 + (11:00:15, 20 December 2024)
- ML20035A627 + (10:59:44, 20 December 2024)
- ML20035A654 + (10:58:50, 20 December 2024)
- ML20035A617 + (10:59:54, 20 December 2024)
- ML20035A581 + (11:00:24, 20 December 2024)
- ML20035A626 + (10:59:45, 20 December 2024)
- ML20035A564 + (11:00:47, 20 December 2024)
- ML20035A589 + (11:00:16, 20 December 2024)
- ML20035A663 + (10:58:43, 20 December 2024)
- ML20035A624 + (10:59:46, 20 December 2024)