Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000254/2023401 + (22:48:16, 2 January 2025)
- ML23174A107 + (22:48:23, 2 January 2025)
- ML23174A105 + (22:48:27, 2 January 2025)
- 05000333/LER-2023-003, Emergency Diesel Generator Fuel Oil Supply Procedure Error B Subsystem + (22:48:30, 2 January 2025)
- 05000354/LER-2023-001, Technical Specification Required Shutdown Due to Declaring the Suppression Chamber and Primary Containment Inoperable + (22:48:39, 2 January 2025)
- ML23173A086 + (22:48:39, 2 January 2025)
- ML23173A057 + (22:48:44, 2 January 2025)
- ML23173A056 + (22:48:46, 2 January 2025)
- ML23173A040 + (22:48:51, 2 January 2025)
- ML23173A037 + (22:48:53, 2 January 2025)
- ML23172A270 + (22:49:04, 2 January 2025)
- ML23172A262 + (22:49:07, 2 January 2025)
- ML23172A147 + (22:49:23, 2 January 2025)
- ML23172A146 + (22:49:25, 2 January 2025)
- EPID:L-2023-LLA-0012 + (22:49:48, 2 January 2025)
- 05000412/LER-2023-001, Indications Identified During Reactor Vessel Head Inspection + (22:50:04, 2 January 2025)
- ML23167A360 + (22:50:19, 2 January 2025)
- 05000374/LER-2022-003-02, Manual Scram Due to Lsophase Bus Duct Fire Followed by 2A RPS Normal Power Supply Trip + (22:50:23, 2 January 2025)
- 05000373/LER-2023-001, Low Pressure Core Spray Inoperable Due to Minimum Flow Valve Flow Pressure Switch Failure + (22:50:24, 2 January 2025)
- EPID:L-2022-LLR-0063 + (22:50:37, 2 January 2025)
- 05000325/LER-2023-001, Loss of Redundant Power Supply Operation Causes Turbine Trip and Subsequent Reactor Scram + (22:50:45, 2 January 2025)
- ML23165A243 + (22:50:57, 2 January 2025)
- ULNRC-06822, Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a + (22:50:59, 2 January 2025)
- 05000250/LER-2023-001, RCS Pressure Boundary Degraded + (22:51:11, 2 January 2025)
- IR 05000313/2023401 + (22:51:34, 2 January 2025)
- 05000333/LER-2023-002, Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation + (22:51:40, 2 January 2025)
- EPID:L-2022-LLA-0138 + (22:51:44, 2 January 2025)
- 05000259/LER-2023-001-01, High Pressure Coolant Injection System Inoperable Due to a Torn Valve Diaphragm + (22:51:50, 2 January 2025)
- ML23164A032 + (22:51:57, 2 January 2025)
- 05000498/LER-2023-001, Pressurizer Power Operated Relief Valve Failed to Open + (22:52:00, 2 January 2025)
- ML23163A242 + (22:52:01, 2 January 2025)
- 05000443/LER-2023-001, Automatic Actuation of B Emergency Diesel Generator Emergency Power Sequencer + (22:52:07, 2 January 2025)
- IR 05000341/2022010 + (22:52:13, 2 January 2025)
- ML23163A039 + (22:52:23, 2 January 2025)
- L-2023-075, Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-02 + (22:52:25, 2 January 2025)
- ML23160A287 + (22:52:36, 2 January 2025)
- 05000313/LER-2023-002, Reactor Protection System Underpower Relay Test Failure Resulting in Condition Prohibited by Technical Specifications + (22:52:41, 2 January 2025)
- EPID:L-2023-DOT-0000 + (22:52:51, 2 January 2025)
- ML23159A277 + (22:52:58, 2 January 2025)
- EPID:L-2020-LLR-0065 + (22:52:59, 2 January 2025)
- 05200025/LER-2023-003, Automatic Reactor Protection System Actuation During Startup Testing Due to Incorrect Turbine Control Valve Setting + (22:53:04, 2 January 2025)
- ML23159A193 + (22:53:06, 2 January 2025)
- ML23159A121 + (22:53:14, 2 January 2025)
- ML23159A119 + (22:53:18, 2 January 2025)
- ML23159A118 + (22:53:21, 2 January 2025)
- ML23159A116 + (22:53:25, 2 January 2025)
- ML23159A108 + (22:53:29, 2 January 2025)
- ML23159A081 + (22:53:38, 2 January 2025)
- ML23159A077 + (22:53:42, 2 January 2025)
- ML23159A073 + (22:53:46, 2 January 2025)
- 05000528/LER-2023-001, Reactor Trip Following a Main Turbine Trip + (22:53:52, 2 January 2025)