Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PLA-8095, 2023 Annual Radiological Environmental Operating Report (PLA-8095) + (21:02:43, 2 January 2025)
- CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 + (21:02:45, 2 January 2025)
- ML24113A265 + (21:02:47, 2 January 2025)
- ML24113A237 + (21:02:52, 2 January 2025)
- 05000296/LER-2024-001, Primary Containment Isolation Valve Inoperable Due to Incorrect Motor Operated Valve Setup + (21:02:56, 2 January 2025)
- IR 05000440/2024001 + (21:03:08, 2 January 2025)
- 05000298/LER-2024-003, High Pressure Coolant Injection Steam Leak Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited by Technical Specifications + (21:03:12, 2 January 2025)
- IR 05000275/2024001 + (21:03:15, 2 January 2025)
- ML24113A025 + (21:03:20, 2 January 2025)
- EPID:L-2023-LLE-0013 + (21:03:23, 2 January 2025)
- IR 05000456/2024001 + (21:03:27, 2 January 2025)
- IR 05000282/2024401 + (21:03:35, 2 January 2025)
- IR 05000443/2024501 + (21:03:39, 2 January 2025)
- ML24109A252 + (21:03:45, 2 January 2025)
- ML24109A190 + (21:03:49, 2 January 2025)
- ML24109A181 + (21:03:50, 2 January 2025)
- ML24109A169 + (21:03:51, 2 January 2025)
- ML24109A089 + (21:04:17, 2 January 2025)
- ML24109A087 + (21:04:20, 2 January 2025)
- ML24109A085 + (21:04:23, 2 January 2025)
- 05000260/LER-2024-001-01, Secondary Containment Isolation Valve Inoperable Due to Mechanical Failure + (21:04:36, 2 January 2025)
- ML24108A146 + (21:04:40, 2 January 2025)
- 05000395/LER-2024-001, (Vcsns), Unit 1, Automatic Actuation of B Emergency Diesel Generator + (21:04:42, 2 January 2025)
- ML24108A145 + (21:04:42, 2 January 2025)
- IR 05000348/2024001 + (21:04:56, 2 January 2025)
- 05000318/LER-2023-004-01, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer + (21:05:17, 2 January 2025)
- IR 05000457/2024090 + (21:05:28, 2 January 2025)
- IR 05000445/2024402 + (21:05:30, 2 January 2025)
- IR 05000237/2024401 + (21:05:33, 2 January 2025)
- IR 05000317/2023050 + (21:05:35, 2 January 2025)
- IR 05000321/2024001 + (21:05:38, 2 January 2025)
- IR 05000482/2024001 + (21:05:52, 2 January 2025)
- ML24107A028 + (21:05:55, 2 January 2025)
- IR 05000424/2024001 + (21:05:58, 2 January 2025)
- 0CAN042401, Radioactive Effluent Release Report for the 2023 Calendar Year + (21:06:09, 2 January 2025)
- IR 05000327/2024001 + (21:06:13, 2 January 2025)
- 05000364/LER-2024-002, For Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel + (21:06:16, 2 January 2025)
- RS-22-128, 9 to Updated Final Safety Analysis Report, Chapter 15.0, Accident Analyses - Redacted + (21:06:27, 2 January 2025)
- ML24103A230 + (21:06:31, 2 January 2025)
- SECY-24-0018, 04-25-24 - Letter to the Honorable Mike Johnson, Et Al., from Chair Hanson Provides the NRCs Report to Congress on Abnormal Occurrences: Fiscal Year 2023 + (21:06:44, 2 January 2025)
- IR 05000313/2024301 + (21:06:51, 2 January 2025)
- ML24103A002 + (21:06:55, 2 January 2025)
- EPID:L-2023-LLA-0037 + (21:06:56, 2 January 2025)
- 05000259/LER-2024-001, Inoperability of Unit 3 Diesel Generator Due to Relay Failure + (21:06:58, 2 January 2025)
- IR 05000458/2024402 + (21:06:59, 2 January 2025)
- ML24102A213 + (21:07:03, 2 January 2025)
- ML24102A185 + (21:07:09, 2 January 2025)
- 05000325/LER-2024-001, Primary Containment Penetration Local Leak Rate Testing Failure + (21:07:13, 2 January 2025)
- 05000325/LER-2024-002, Re Automatic Start of Emergency Diesel Generator Due to Emergency Bus De-energization + (21:07:13, 2 January 2025)
- IR 05000483/2024001 + (21:07:18, 2 January 2025)
- SECY-24-0026, A: Achieving Timely Completion of License Renewal Safety and Environmental Reviews (License Renewal Roadmap) + (21:07:21, 2 January 2025)