Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19305C393 + (10:55:35, 2 January 2025)
- ML19305C389 + (10:55:37, 2 January 2025)
- ML19305C388 + (10:55:38, 2 January 2025)
- ML19305C386 + (10:55:39, 2 January 2025)
- ML19305C387 + (10:55:39, 2 January 2025)
- ML19305C385 + (10:55:40, 2 January 2025)
- ML19305C384 + (10:55:41, 2 January 2025)
- ML19305C382 + (10:55:41, 2 January 2025)
- ML19305C381 + (10:55:42, 2 January 2025)
- ML19305C380 + (10:55:43, 2 January 2025)
- ML19305C379 + (10:55:43, 2 January 2025)
- ML19305C377 + (10:55:44, 2 January 2025)
- ML19305C376 + (10:55:45, 2 January 2025)
- ML19305C375 + (10:55:46, 2 January 2025)
- ML19305C374 + (10:55:46, 2 January 2025)
- ML19305C373 + (10:55:47, 2 January 2025)
- ML19305C371 + (10:55:48, 2 January 2025)
- ML19305C372 + (10:55:48, 2 January 2025)
- 05000334/LER-1980-013-04, /04T-0:on 800302,during Maint Surveillance,Cooling Tower Blowdown Temp Indicator Found Out of Calibr.Caused by Instrument Drift.Instrument Recalibr + (10:55:49, 2 January 2025)
- 05000318/LER-1980-012-03, /03L-0:on 800219,during Routine Surveillance,Small Leak Discovered on Charging Pump Common Suction Header Relief Valve.Caused by Vibration Induced Metal Fatigue in heat-affected Zone of Welded Penetration in Header + (10:55:51, 2 January 2025)
- 05000334/LER-1980-013, Forwards LER 80-013/04T-0 + (10:55:53, 2 January 2025)
- 05000318/LER-1980-012, Forwards LER 80-012/03L-0 + (10:55:55, 2 January 2025)
- ML19305C363 + (10:55:56, 2 January 2025)
- ML19305C361 + (10:55:57, 2 January 2025)
- 05000304/LER-1979-055-03, /03L-0:on 791004,while Operating at 91% Reactor Power,Incore Detector Panel & Axial Power Distribution Monitoring Sys Panel Lost Power.Caused by Failure of 9KVA 480/120 Volts Alternating Current Transformer on MCC 2331C + (10:55:59, 2 January 2025)
- ML19305C357 + (10:56:03, 2 January 2025)
- 05000304/LER-1979-055, Forwards LER 79-055/03L-0 + (10:56:05, 2 January 2025)
- ML19305C353 + (10:56:06, 2 January 2025)
- ML19305C352 + (10:56:07, 2 January 2025)
- 05000312/LER-1980-012-03, /03L-0:on 800219,diesel Generator a Failed to Start from Control Room Due to Piece of Metal Stuck in Relay.Caused by Recent Work in Relay Panel.Metal Removed & Subsequent Start Tests Successful + (10:56:08, 2 January 2025)
- ML19305C350 + (10:56:10, 2 January 2025)
- 05000312/LER-1980-012, Forwards LER 80-012/03L-0 + (10:56:11, 2 January 2025)
- ML19305C347 + (10:56:13, 2 January 2025)
- ML19305C346 + (10:56:14, 2 January 2025)
- ML19305C345 + (10:56:14, 2 January 2025)
- ML19305C344 + (10:56:15, 2 January 2025)
- ML19305C343 + (10:56:16, 2 January 2025)
- ML19305C342 + (10:56:17, 2 January 2025)
- ML19305C341 + (10:56:18, 2 January 2025)
- ML19305C340 + (10:56:19, 2 January 2025)
- ML19305C339 + (10:56:19, 2 January 2025)
- ML19305C338 + (10:56:20, 2 January 2025)
- ML19305C337 + (10:56:21, 2 January 2025)
- ML19305C336 + (10:56:22, 2 January 2025)
- ML19305C334 + (10:56:23, 2 January 2025)
- ML19305C331 + (10:56:24, 2 January 2025)
- ML19305C333 + (10:56:24, 2 January 2025)
- ML19305C330 + (10:56:25, 2 January 2025)
- ML19305C328 + (10:56:26, 2 January 2025)
- ML19305C329 + (10:56:26, 2 January 2025)
- ML19305C327 + (10:56:28, 2 January 2025)