Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19309D025 + (08:21:41, 2 January 2025)
- ML19309D021 + (08:21:42, 2 January 2025)
- ML19309D019 + (08:21:43, 2 January 2025)
- ML19309D018 + (08:21:44, 2 January 2025)
- ML19309D017 + (08:21:45, 2 January 2025)
- ML19309D016 + (08:21:47, 2 January 2025)
- ML19309D015 + (08:21:48, 2 January 2025)
- ML19309D014 + (08:21:49, 2 January 2025)
- ML19309D013 + (08:21:50, 2 January 2025)
- IR 05000293/1980006 + (08:21:51, 2 January 2025)
- ML19309D011 + (08:21:52, 2 January 2025)
- ML19309D009 + (08:21:53, 2 January 2025)
- ML19309D007 + (08:21:53, 2 January 2025)
- ML19309D005 + (08:21:54, 2 January 2025)
- ML19309D003 + (08:21:55, 2 January 2025)
- ML19309D002 + (08:21:56, 2 January 2025)
- ML19309D001 + (08:21:56, 2 January 2025)
- ML19309D000 + (08:21:57, 2 January 2025)
- ML19309C999 + (08:21:58, 2 January 2025)
- ML19309C997 + (08:21:58, 2 January 2025)
- ML19309C996 + (08:21:59, 2 January 2025)
- ML19309C995 + (08:22:00, 2 January 2025)
- 05000327/LER-1980-015-03, /03L-0:on 800305,while in Mode 6 W/Fuel Loading Complete,Pressure Was Only Being Monitored in One Steam Generator & Reactor Pressure Vessel.Caused by Misunderstanding of Surveillance Instruction + (08:22:01, 2 January 2025)
- ML19309C993 + (08:22:06, 2 January 2025)
- 05000327/LER-1980-015, Forwards LER 80-015/03L-0 + (08:22:07, 2 January 2025)
- ML19309C989 + (08:22:08, 2 January 2025)
- ML19309C986 + (08:22:09, 2 January 2025)
- ML19309C987 + (08:22:09, 2 January 2025)
- IR 05000443/1980002 + (08:22:13, 2 January 2025)
- 05000333/LER-1980-026-03, /03L-0:on 800307,during Steady State Operation, Drifting Low Power Range Monitor Caused Process Computer to Indicate Operation in Excess of Thermal Limits.Caused by Drifting Low Power Range Monitor 44-37C,due to Age + (08:22:14, 2 January 2025)
- ML19309C981 + (08:22:16, 2 January 2025)
- IR 05000352/1979014 + (08:22:17, 2 January 2025)
- IR 05000321/2019013 + (08:22:20, 2 January 2025)
- 05000333/LER-1980-026, Forwards LER 80-026/03L-0 + (08:22:22, 2 January 2025)
- ML19309C972 + (08:22:24, 2 January 2025)
- ML19309C974 + (08:22:24, 2 January 2025)
- 05000327/LER-1980-010-03, /03L-0:on 800304,gaseous Vent Flow Rate Monitors for Units 1 & 2 Shield Bldgs & Auxiliary Bldg Were Declared Inoperable.Cause Not Stated.Gaseous Flow Rate Monitors to Be Redesigned + (08:22:26, 2 January 2025)
- ML19309C969 + (08:22:27, 2 January 2025)
- IR 05000305/1980005 + (08:22:29, 2 January 2025)
- 05000327/LER-1980-010, Forwards LER 80-010/03L-0 + (08:22:31, 2 January 2025)
- ML19309C959 + (08:22:32, 2 January 2025)
- ML19309C958 + (08:22:33, 2 January 2025)
- 05000327/LER-1980-013-03, /03L-0:on 800302,failed to Analyze Samples from Unit 2 Shield Bldg Exhaust.Caused by Misunderstanding of Surveillance Requirements.Lab Personnel Instructed on Sampling & Analysis Requirements + (08:22:34, 2 January 2025)
- ML19309C956 + (08:22:35, 2 January 2025)
- ML19309C955 + (08:22:36, 2 January 2025)
- IR 05000219/1980001 + (08:22:37, 2 January 2025)
- ML19309C953 + (08:22:38, 2 January 2025)
- ML19309C952 + (08:22:39, 2 January 2025)
- 05000327/LER-1980-013, Forwards LER 80-013/03L-0 + (08:22:43, 2 January 2025)
- ML19309C948 + (08:22:45, 2 January 2025)
- ML19309C947 + (08:22:46, 2 January 2025)