ML19309C995
| ML19309C995 | |
| Person / Time | |
|---|---|
| Site: | Maine Yankee |
| Issue date: | 03/04/1980 |
| From: | Johnson W Maine Yankee |
| To: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| IEB-79-01, IEB-79-1, NUDOCS 8004090458 | |
| Download: ML19309C995 (2) | |
Text
Th
- -SC 'O M g
/
\\
, mal #E ~ -
- fan #EE i ~ T EE CET
- TunN,,xe nO O mr.,,
g *~* *"/
/
ENGINEERING OFFICE WESTBORO. MASS ACHUSETTS 01581
, 5
/
617-366-9011
%,wp$
B.4.1.1 RfY 80-37 March 4, 1980 United Staten Nuclear Regulatory Commiss ion Office of Inspection t Enforcement Region I 681 Park Avenue King of Pruss ia, Pennsylvania 19406 Attention:
Mr. Boyce H. Grier, Director
Reference:
(1)
License No. DPR-36 (Docket No. 50-309)
(2)
IE Bulletin 79-01B, dated January 14, 1980 (3)
YAEC Letter No. WMY 79-63, dated June 15, 1979
Subject:
Environmental Qualification of Class lE Equipment Dear Sir The NRC request for additional information in Reference (2) is based on their preliminary review of all licensee responses to IE Bulletin 79-01, and as such, tends to assume that all responses are identically deficient in the areas mentioned.
We do not believe that these generalizations are applicable to the Maine Yankee response. Our response, Reference (3), to Bulletin 79-01 represented the culmination of a massive in-house effort to determine the environmental qualification of safety-related electrical equipment. We believe that we have conscientiously provided you with all the specific information required in Bulletin 79-01.
We have addressed operation of equipment both inside and outside the primary containment, and w have used a format that is very s imilar to the one attached to Bulletin 79-018.
Although w believe all the required information is already contained in Reference (3), with the exception of the newly identified areas in 79-OlB, we are submitting the following items to cover the 45 day submittal requirements of IE Bulletin 79-018.
Because of the extremely heavy demand placed on us recently to respond to various other NRC concerns, certain data required for this submittal is not yet available.
This missing data will be sent to you as it becomes available and as indicated below:
dOO4000458
U.S. Nucloce Regulatory Commic2 ion March 4, 1980 Attention:
Mr. Boyc0 H. Grier, Director P ga 2 79-01B Item 1:
The " master list" of required systems (Enclosure 1) is hereby submitted in its entirety.
With the exception of equipment outside the reactor containment, the electrical component list (Enclosure 2) is hereby submitted.
Any missing information will be submitted by 3/14/80.79-01B Items 2 and 3:
The qualification work sheets and test profiles are essentially complete and will be submitted by 3/14/80.
Any missing information will be provided with the submittal of item 7b (90 day response).
Very truly yours, MAINE YANKEE ATOMIC POWER COMPANY W.
P Johnson Vice President GTs /ncj Enclosures COMMONWEALTH OF MASSACHUSETTS)
)ss COUNTY OF WORCESTER
)
Then personally appeared before me, W.
P. Johnson, who, being duly a worn, did state that he is a Vice President of Maine Yankee Atomic Electric Company, that he is duly authorized to execute and file the foregoing request in the name and on the behalf of Maine Yankee Atomic Electric Company, and that the statements therein are true to the beat of his knowledge and belief.