Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20237A002 + (13:40:40, 2 December 2024)
- ML20237A001 + (13:40:41, 2 December 2024)
- ML20237A000 + (13:40:41, 2 December 2024)
- 3F1287-08, Monthly Operating Rept for Nov 1987 + (13:40:42, 2 December 2024)
- ML20236Y630 + (13:40:43, 2 December 2024)
- NRC-87-0253, Provides Justification for Deferral of Testing for Eight motor-operated Valves Until Spring 1988 Local Leak Rate Test Outage,Per 871003 Commitment Re IE Bulletin 85-003, Motor-Operated Valves Common Mode Failure During Plant.. + (13:40:44, 2 December 2024)
- ML20236Y628 + (13:40:45, 2 December 2024)
- ML20236Y626 + (13:40:45, 2 December 2024)
- ML20236Y624 + (13:40:46, 2 December 2024)
- ML20236Y623 + (13:40:47, 2 December 2024)
- ML20236Y620 + (13:40:48, 2 December 2024)
- ML20236Y621 + (13:40:48, 2 December 2024)
- U-603058, Responds to Violations Noted in Insp Rept 50-461/98-09. Corrective Actions:Revised Plant Standing Order (PSO) 29, Emergency Security Notifications to Require That Security Activate ERDS Sys in Simulator + (13:40:49, 2 December 2024)
- ML20236Y616 + (13:40:50, 2 December 2024)
- ML20236Y617 + (13:40:50, 2 December 2024)
- ML20236Y615 + (13:40:51, 2 December 2024)
- U-603049, Submits 90-day Response to GL 98-01, Year 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07 + (13:40:52, 2 December 2024)
- ML20236Y611 + (13:40:53, 2 December 2024)
- ML20236Y608 + (13:40:54, 2 December 2024)
- ML20236Y607 + (13:40:55, 2 December 2024)
- ML20236Y602 + (13:40:56, 2 December 2024)
- ML20236Y603 + (13:40:56, 2 December 2024)
- U-603059, Responds to Second RAI Re Proposed Amend to License NPF-62, Per 980727 Telcon + (13:40:57, 2 December 2024)
- ML20236Y597 + (13:40:58, 2 December 2024)
- ML20236Y599 + (13:40:58, 2 December 2024)
- ML20236Y596 + (13:40:59, 2 December 2024)
- ML20236Y595 + (13:41:00, 2 December 2024)
- ML20236Y594 + (13:41:01, 2 December 2024)
- ML20236Y592 + (13:41:01, 2 December 2024)
- 0CAN089801, Revises 961219 Submittal to Incorporate New Control Room Duct Radiation Monitor.Util Requests That Effective Date for Change Be within 30 Days of NRC Approval + (13:41:02, 2 December 2024)
- ML20236Y589 + (13:41:03, 2 December 2024)
- ML20236Y588 + (13:41:04, 2 December 2024)
- ML20236Y586 + (13:41:04, 2 December 2024)
- ML20236Y581 + (13:41:07, 2 December 2024)
- ML20236Y576 + (13:41:10, 2 December 2024)
- ML20236Y575 + (13:41:10, 2 December 2024)
- ML20236Y574 + (13:41:11, 2 December 2024)
- ML20236Y573 + (13:41:11, 2 December 2024)
- ML20236Y571 + (13:41:13, 2 December 2024)
- 05000338/LER-1987-023-01, :on 871124,Kaman Process Vent Normal Range Radiation monitor,RI-GW-178-1,declared Inoperable.Caused by Loose Connection Between Central Processing Unit Card & Sys. Central Processing Unit Card Replaced + (13:41:15, 2 December 2024)
- ML20236Y563 + (13:41:17, 2 December 2024)
- ML20236Y566 + (13:41:17, 2 December 2024)
- ML20236Y562 + (13:41:18, 2 December 2024)
- ML20236Y561 + (13:41:19, 2 December 2024)
- ML20236Y560 + (13:41:20, 2 December 2024)
- 05000412/LER-1987-035, :on 871110,reactor Trip Occurred.Caused by lo-lo Level in Steam Generator C Due to Bent Disc & Stem on Valve 2CNM-DCV100.Valve Replaced by Masoneilan Valve W/Increased Differential Pressure Rating + (13:41:22, 2 December 2024)
- 05000341/LER-1987-051, :on 870929,differential Pressure Actuation of Emergency Equipment Cooling Water Occurred.Caused by Design Deficiency in Reactor Bldg Closed Cooling Water Sys.Time Delay on Pressure Switches Lengthened + (13:41:24, 2 December 2024)
- LIC-98-0103, Responds to NRC Re Violations Noted in Insp Rept 50-285/98-11.Corrective Actions:Deluge Sys for TIA-3 Was Inspected & Repaired,Operators Involved Have Been Counseled & Memo Was Issued to Operators Re Proper Valve Operation + (13:41:26, 2 December 2024)
- ML20236Y556 + (13:41:26, 2 December 2024)
- 05000254/LER-1987-022-04, :on 871109,intermediate Range Monitor (IRM) 14 Spiked hi-hi Resulting in Full Reactor Scram.Caused by Faulty IRM 14 Hardware.Irm 14 Will Be Investigated & Repaired + (13:41:29, 2 December 2024)
- 05000424/LER-1987-065, :on 871109,containment Ventilation Isolation Occurred.Caused by Failure of Check Source Actuator to Fully Contract to Storage Position & Software Design Inadequacy. Personnel Counseled + (13:41:31, 2 December 2024)