Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- B13137, Requests Exemption from Certain Requirements of 10CFR50, App J,Sections III.C.1 & III.C.2 Re Type C Testing Requirements.Diagrams for Each Penetration Included in Attachment I + (07:41:55, 2 December 2024)
- ML20245E801 + (07:41:57, 2 December 2024)
- ML20245E800 + (07:42:00, 2 December 2024)
- ML20245E796 + (07:42:07, 2 December 2024)
- ML20245E795 + (07:42:08, 2 December 2024)
- ML20245E794 + (07:42:10, 2 December 2024)
- ML20245E793 + (07:42:11, 2 December 2024)
- ML20245E790 + (07:42:13, 2 December 2024)
- IR 05000282/1988019 + (07:42:15, 2 December 2024)
- ML20245E787 + (07:42:16, 2 December 2024)
- ML20245E784 + (07:42:17, 2 December 2024)
- ML20245E783 + (07:42:19, 2 December 2024)
- AECM-89-0003, Responds to NRC Re Violations Noted in Insp Rept 50-416/88-26.Corrective Actions:Snm Transactions Transmitted to DOE Via Form 741 Verified & Necessary Corrections Made to Previously Transmitted Forms + (07:42:20, 2 December 2024)
- ML20245E780 + (07:42:23, 2 December 2024)
- 05000483/LER-1989-005, :on 890518,ESF Safety Injection Actuation on Train a Received Due to Low Steamline Pressure Signal During Operational Test.Caused by Personnel Error.Procedure Revised + (07:42:27, 2 December 2024)
- W3P89-0001, Forwards Change 1 to Rev 10 to Physical Security Plan. Change Withheld (Ref 10CFR73.21) + (07:42:29, 2 December 2024)
- 05000213/LER-1989-004, :on 890125,flood Protection of Main Diesel Fuel Oil Tank Determined Inadequate.Caused by Design, Analysis &/Or Procedural Inadequacies.Probability of Flood Occuring During Spring of 1989 Analyzed + (07:42:33, 2 December 2024)
- B13095, Forwards Rev 7 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790(a) & 73.21(b)) + (07:42:35, 2 December 2024)
- ML20245E769 + (07:42:37, 2 December 2024)
- ML20245E768 + (07:42:39, 2 December 2024)
- ML20245E766 + (07:42:41, 2 December 2024)
- ML20245E765 + (07:42:42, 2 December 2024)
- ML20245E764 + (07:42:43, 2 December 2024)
- ML20245E763 + (07:42:44, 2 December 2024)
- ML20245E762 + (07:42:46, 2 December 2024)
- ML20245E760 + (07:42:47, 2 December 2024)
- ML20245E758 + (07:42:50, 2 December 2024)
- IR 05000219/1989013 + (07:42:51, 2 December 2024)
- ML20245E756 + (07:42:57, 2 December 2024)
- ML20245E754 + (07:43:00, 2 December 2024)
- ML20245E750 + (07:43:02, 2 December 2024)
- ML20245E748 + (07:43:03, 2 December 2024)
- ML20245E746 + (07:43:05, 2 December 2024)
- BSEP-89-0392, Forwards Environ Surveillance Rept for 1988 & Environ Surveillance Repts for Jan-June & Jul-Dec 1988 + (07:43:06, 2 December 2024)
- ML20245E742 + (07:43:08, 2 December 2024)
- DD-89-02, Advises That Time Provided within Which Commission May Act to Review Directors Decision DD-89-02 Expired.Commission Declined Review.Decision Became Final Agency Action on 890417.Served on 890425 + (07:43:09, 2 December 2024)
- IR 05000333/1989007 + (07:43:18, 2 December 2024)
- 05000260/LER-1989-010-01, :on 890323,radiation Monitor Experienced Downscale Spike Following Upscale Spike,Resulting in Unplanned ESF Actuations.Caused by Arcing from Exposed Conductors on Communication Line.Cord Taped + (07:43:21, 2 December 2024)
- ML20245E733 + (07:43:23, 2 December 2024)
- ML20245E732 + (07:43:23, 2 December 2024)
- ML20245E730 + (07:43:24, 2 December 2024)
- ML20245E729 + (07:43:25, 2 December 2024)
- ML20245E727 + (07:43:26, 2 December 2024)
- ML20245E726 + (07:43:27, 2 December 2024)
- ML20245E724 + (07:43:28, 2 December 2024)
- ML20245E723 + (07:43:29, 2 December 2024)
- ML20245E720 + (07:43:30, 2 December 2024)
- 05000271/LER-1989-006, :on 890524,primary Containment Isolation Sys Group III & Subsequent Standby Gas Treatment Sys Initiation Occurred.Caused by Human Error.Isolation Promptly Reset. Technician Counseled + (07:43:34, 2 December 2024)
- ML20245E718 + (07:43:36, 2 December 2024)
- ML20245E716 + (07:43:37, 2 December 2024)
- 05000312/LER-1989-007, :on 890518,discovered That Auxiliary Bldg Stack Monitor in Purge Mode.Caused by Deviation from Procedures on 890424,25 & 28.Procedures Revised to Add Precaution That Method Should Not Be Used to Terminate Purge + (07:43:42, 2 December 2024)