Docket Nos. 50-289; 50-320 MEMORANDUM FOR:

Edward C..Wenzinger, Acting Chief, Projects Branch No. 1, Division of Reactor Projects FROM:

Curtis J. Cowgill, Chief, Reactor Projects Section 1A

SUBJECT:

TMI STATUS REPORT FOR THE PERIOD MAY 16 - JUNE 18,.1989 e

Enclosed is the TMI Resident Office monthly status report,-which covers both TMI-1 and TMI-2. _This report is to provide NRC management and the public with highlights of significant events at TMI-1 and TMI-2 from an.NRC regulatory perspective.

ORIGINAL. SIGNED BY N[

Curtis J. Cowgill, Chief Reactor Projects Section IA

Enclosure:

As Stated cc w/ enclosure:

S. Varga,-NRR J. Stolz, NRR R. Hernan, NRR M. Masnik, NRR T. Martin, EDO J. Partlow,' NRR J. Roe, NRR L. Whitney, NRR T. Gerusky, BRP/ DER, Commonwealth of Pennsylvania Governor's Office of Policy, Commonwealth of Pennsylvania TMI Alert-Susquehanna Valley Alliance Friends & Fa.mily of TMI D. Davenport L. Drey E. Harzler A. Herman i

H. Hucker J. Johnsrud P Smith

.H.

Spinelli C. Wolfe Concerned Mothers and Women Public ' ocument Room Local Public' Document Room 0FFICIAL RECORD COPY MONTHLY STATUS REPORT - 0001.0.0 11/29/80 I \\

8906270444 4

{DR ADOCK 0

(

e-________-_

y,', j

+ -

i JUN t o 1989 Edward C. Wenzinger 2

~bec w/ enclosure:

K. Abraham, RI (2 copies)

M. Miller, RI W. Kane, RI W. Baunack, RI C. Cowgill, RI J. Bell, NRR Region I Docket Room (w/ concurrences) i F. Young, RI (3 copies)

.D. Johnson T. Moslak p

h R1 U wgill EW nzinger I

J/20/89 (g p 0FFICIAL RECORD COPY MONTHLY STATUS REPORT - 0002.0.0 11/29/80 f

i t__

,-p, 1

I I

ENCLOSURE a

TMI-1 AND TMI-2 STATUS REPORT FOR THE PERIOD MAY 16 - JUNE 18, 1989 1.

TMI-1 a.

Facility Operations Summary TMI Unit 1 operated at full power during this report period. No sig-nificant events or challenges to plant safety systems occurred.

TMI-1 set a new operating record June 9,1989 with 163 days of con -

tinuous operation, breaking the previous record set in 1976..

2.

TMI-2 a.

Facility Activities Summary Defueling crews continued to remove core debris from the lower head of the reactor vessel using pick and place techniques and air lifting equipment.

During this report period, over 23,000 pounds of material were loaded into canisters in preparation for shipment. Approxi-mately 25,000 pounds of debris remain to be removed to complete de-fueling operations.

From preliminary video examinations of the lower head, no damage is readily apparent to the incore nozzle welds or lower head as a result of the accident.

Testing is in progress to further improve the operation of a tool that will be used to remove the bolts that secure the baffle plates.

Removing the bolts and baffle plates will permit defueling the annu-lar area between the baffle plates and core former walls.

Presently, defueling crews are preparing to sequentially flush loose debris from the periphery of the outer lower core support assembly using high volume nozzles and the cavitating water jet, respectively.

b.

Items of Special Interest On June 18, 1989, the licensee made the nineteenth rail shipment of core debris to the Idaho National Engineering Laboratory.

To date, 280 canisters have been shipped to the Department of Energy facility.

3.

NRC Staff Activities The NRC staff assigned on site at the beginning of the period consisted of a senior resident inspector, two resident inspectors, and a project man-I ager for TMI-2.

OFFICIAL RECORD COPY MONTHLY STATUS REPORT - 0003.0.0 11/29/80 l

. ~ ~

Enclosure 2

h a.

Inspection Reports During this period, Region I issued the following inspection reports.

TMI-I Inspection Report No. 50-289/89-10 on June 7,1989, ad-jf!

dressing the Environmental Qualification Program and related open items.

O TMI-1 Inspection Report No. 50-289/89-06 on May 2, 1989'ad-dressing implementation of the radiation protection program.

b.

Monthly Status Report 1

As the defueling activities at TMI-2 near completion, a monthly status report is no longer merited.

Licensee activities and the ac-tivities of the NRC staff will continue to be addressed in routine inspection reports. Accordingly, this is to give notice that the monthly status report will no longer be prepared after the final com-pletion of defueling of the reactor vessel, presently projected to occur in early fall.

4.

Public Meetings The meeting of the Advisory Panel for the Decontamination of Three Mile Island, Unit 2, previously scheduled for Thursday July 27, 1989, has been postponed. The meeting will be rescheduled for late August. When the meeting time and place have been finalized, the particulars will be an-nounced in the TMI monthly status report and in routine NRC press re-leases.