Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- B13146, Responds to NRC Questions Re Vacuum Breakers from Torus to Reactor Bldg + (00:05:44, 2 December 2024)
- ML20247R241 + (00:05:44, 2 December 2024)
- ML20247R238 + (00:05:46, 2 December 2024)
- ML20247R234 + (00:05:47, 2 December 2024)
- ML20247R233 + (00:05:47, 2 December 2024)
- ML20247R232 + (00:05:48, 2 December 2024)
- ML20247R229 + (00:05:49, 2 December 2024)
- ML20247R228 + (00:05:49, 2 December 2024)
- ML20247R227 + (00:05:50, 2 December 2024)
- ML20247R226 + (00:05:51, 2 December 2024)
- PNO-III-89-049, on 890731,reactor Operators Manually Scrammed Reactor from 25% Power as Water Level in Reactor Approached High Level Reactor Trip Point.Caused by Rupture in Bellows on Feedwater Header.Outage Expected to Last Approx 4 Days + (00:05:51, 2 December 2024)
- ML20247R223 + (00:05:52, 2 December 2024)
- ML20247R217 + (00:05:57, 2 December 2024)
- ML20247R219 + (00:05:57, 2 December 2024)
- ML20247R216 + (00:05:58, 2 December 2024)
- ML20247R213 + (00:05:59, 2 December 2024)
- ML20247R212 + (00:06:00, 2 December 2024)
- ML20247R211 + (00:06:00, 2 December 2024)
- ML20247R209 + (00:06:01, 2 December 2024)
- ML20247R210 + (00:06:01, 2 December 2024)
- ML20247R208 + (00:06:02, 2 December 2024)
- ML20247R207 + (00:06:03, 2 December 2024)
- ML20247R205 + (00:06:04, 2 December 2024)
- ML20247R203 + (00:06:05, 2 December 2024)
- ML20247R202 + (00:06:05, 2 December 2024)
- ML20247R199 + (00:06:06, 2 December 2024)
- ML20247R196 + (00:06:07, 2 December 2024)
- ML20247R195 + (00:06:07, 2 December 2024)
- ML20247R190 + (00:06:08, 2 December 2024)
- NRC-89-0158, Application for Amend to License NPF-43,modifying Tech Specs 3/4.3.5 Re Reactor Core Isolation Cooling Sys Actuation Instrumentation & 3/4.3.9 Concerning Feedwater/Main Turbine Trip Sys Actuation Instrumentation,Per GE STS + (00:06:12, 2 December 2024)
- ML20247R187 + (00:06:12, 2 December 2024)
- ML20247R184 + (00:06:13, 2 December 2024)
- ML20247R181 + (00:06:14, 2 December 2024)
- ML20247R179 + (00:06:14, 2 December 2024)
- ML20247R177 + (00:06:15, 2 December 2024)
- ML20247R176 + (00:06:16, 2 December 2024)
- ML20247R171 + (00:06:17, 2 December 2024)
- ML20247R170 + (00:06:17, 2 December 2024)
- ML20247R167 + (00:06:18, 2 December 2024)
- ML20247R166 + (00:06:18, 2 December 2024)
- ML20247R164 + (00:06:19, 2 December 2024)
- ML20247R165 + (00:06:19, 2 December 2024)
- B13267, Forwards Addl Response to Station Blackout Rule Re Ventilation Coping Assessments for Plant + (00:06:20, 2 December 2024)
- ML20247R162 + (00:06:21, 2 December 2024)
- ML20247R155 + (00:06:23, 2 December 2024)
- ML20247R154 + (00:06:23, 2 December 2024)
- B17229, Forwards Next Scheduled 10CFR50.54(f) Update for Info Requests 1 & 2,IAW Schedule Provided in 980108 NRC Ltr + (00:06:24, 2 December 2024)
- TXX-8944, Supplemental Deficiency Rept CP-88-14 Re Structural Load Verification of Seismic Category I Structures.Initially Reported on 880214.Evaluation of Attachment Loads & Design Mods Will Be Completed Prior to Fuel Load for Both Units + (00:06:24, 2 December 2024)
- A07433, Proposed Tech Specs Re Leakage Detection Sys + (00:06:25, 2 December 2024)
- ML20247R149 + (00:06:26, 2 December 2024)
- ML20247R146 + (00:06:27, 2 December 2024)
- ML20247R144 + (00:06:27, 2 December 2024)