Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20049J560 + (10:25:05, 19 December 2024)
- ML20049J559 + (10:25:07, 19 December 2024)
- ML20049J558 + (10:25:10, 19 December 2024)
- ML20049J557 + (10:25:11, 19 December 2024)
- ML20049J556 + (10:25:13, 19 December 2024)
- ML20049J555 + (10:25:18, 19 December 2024)
- ML20049J554 + (10:25:19, 19 December 2024)
- ML20049J553 + (10:25:20, 19 December 2024)
- ML20049J552 + (10:25:22, 19 December 2024)
- ML20049J551 + (10:25:24, 19 December 2024)
- ML20049J550 + (10:25:25, 19 December 2024)
- ML20049J549 + (10:25:26, 19 December 2024)
- ML20049J548 + (10:25:39, 19 December 2024)
- ML20049J547 + (10:25:41, 19 December 2024)
- ML20049J545 + (10:25:43, 19 December 2024)
- ML20049J544 + (10:25:44, 19 December 2024)
- ML20049J543 + (10:25:45, 19 December 2024)
- ML20049J541 + (10:25:47, 19 December 2024)
- ML20049J540 + (10:25:48, 19 December 2024)
- ML20049J537 + (10:26:00, 19 December 2024)
- 05000280/LER-1982-016-03, /03L-0:on 820131,loss of Boric Acid Flow to Blender Observed While Attempting Blend to Vol Control Tank. Caused by Loss of Heat Tracing & Damaged Insulation Upstream of Flow Transmitter.Tracing Replaced + (10:26:04, 19 December 2024)
- 05000280/LER-1982-017-03, /03L-0:on 820131,PR-27 Revealed Ampere Readings for Heat Tracing Panels 8 & 9,circuits 24A & C Below Acceptance Criteria.Caused by Loss of Heat Tracing Due to Excessive Heat.Tracing Replaced.Design Change Initiated + (10:26:11, 19 December 2024)
- 05000338/LER-1982-005-03, /03L-0:on 820211,w/unit in Mode 1,RCS Unidentified Leakage Was Determined in Excess of Tech Specs.Caused by Packing Leak on 1-RC-129 Level Instrument Isolation Valve. Valves 1-RC-129 & 1-RC-130 Closed + (10:26:18, 19 December 2024)
- ML20049J533 + (10:26:21, 19 December 2024)
- ML20049J532 + (10:26:22, 19 December 2024)
- 05000338/LER-1982-005, Forwards LER 82-005/03L-0 + (10:26:24, 19 December 2024)
- 05000328/LER-1982-021-01, /01T-0:on 820217,during Startup,Shutdown Rods in Shutdown Bank a Exceeded Plus/Minus 12 Steps of Actual Position on Indicators.Caused by Misinterpretation of Limiting Condition for Operation 3.1.3.3.Rods Recalibr + (10:26:30, 19 December 2024)
- ML20049J528 + (10:26:33, 19 December 2024)
- 05000328/LER-1982-021, Forwards LER 82-021/01T-0 + (10:26:37, 19 December 2024)
- 05000281/LER-1982-013-03, /03L-0:on 820124,radioiodine Sample Taken 6-h & 28 Minutes Following Thermal Power Increase,Exceeded Tech Spec Time Limit.Caused by Delayed Oncoming Shift Chemists Due to Traffic Problems + (10:26:51, 19 December 2024)
- 05000369/LER-1982-014-03, /03L-0:on 820128,process Monitoring Sys Containment Gas Monitor EMF-39(L) Declared Inoperable Due to Scale Low Indication & Loss of Indication.Caused by Failure of Quality Bnn Connector.Sys Repaired + (10:27:01, 19 December 2024)
- 05000287/LER-1982-001-03, /03L-0:on 820128,channel B Borated Water Storage Tank Level Indication Declared Inoperable Due to Erratic Indication.Caused by Dirt & Oil in Level Indicator Booster Relay & High Thermostat Settings on Sys Heat Trace + (10:27:04, 19 December 2024)
- ML20049J522 + (10:27:07, 19 December 2024)
- 05000287/LER-1982-001, Forwards LER 82-001/03L-0.Detailed Event Analysis Encl + (10:27:11, 19 December 2024)
- 05000281/LER-1982-013, Forwards LER 82-013/03L-0 + (10:27:15, 19 December 2024)
- ML20049J517 + (10:27:21, 19 December 2024)
- ML20049J516 + (10:27:22, 19 December 2024)
- 05000369/LER-1982-013-03, /03L-0:on 820126,two Upper Head Injection Train a Accumulator Tank Level Switches Miscalibr,Rendering Isolation Valves Inoperable.Caused by Faulty Data Programmed Into Computer Memory.Program Corrected + (10:27:24, 19 December 2024)
- 05000369/LER-1982-014, Forwards LER 82-014/03L-0 + (10:27:27, 19 December 2024)
- ML20049J512 + (10:27:31, 19 December 2024)
- ML20049J511 + (10:27:33, 19 December 2024)
- 05000369/LER-1982-013, Forwards LER 82-013/03L-0.Detailed Event Analysis Encl + (10:27:38, 19 December 2024)
- 05000369/LER-1982-012-03, /03L-0:on 820119,routine QA Audit of Fire Protection Sys Test Found Three Valves Marked Not Accessible & Had Not Been Checked.Caused by Personnel Error.Periodic Test Performed & Valves Found in Correct Position + (10:27:42, 19 December 2024)
- 05000324/LER-1982-026-03, /03L-0:on 820202,low Level Switch, 2-B21-LIS-NO31B-2,which Provides One of Signals Required to Initiate Automatic Depressurization Sys Failed.Cause Could Not Be Determined.Switch Replaced + (10:27:51, 19 December 2024)
- 05000324/LER-1982-026, Forwards LER 82-026/03L-0 + (10:28:07, 19 December 2024)
- 05000261/LER-1982-033, Forwards LER 82-033/01X-1 + (10:28:11, 19 December 2024)
- 05000369/LER-1982-012, Forwards LER 82-012/03L-0.Detailed Event Analysis Encl + (10:28:14, 19 December 2024)
- ML20049J499 + (10:28:17, 19 December 2024)
- 05000260/LER-1982-008-03, /03L-0:on 820127,after Calibr,Rod Block Monitor Channel B Failed to Pass Functional Test of SI 4.2.C-2. Caused by Electronic IC Failure Possibly Due to Voltage Spike During Calibr.Ge 136B1333G1 Gain Change Card Replaced + (10:28:20, 19 December 2024)
- 05000280/LER-1982-013-03, /03L-0:on 820126,dropped Control Rod Resulted in Quadrant to Average Power Tilt of Greater than 2%.Caused by Corroded Conductors in Power Supply Due to Break in Cable Admitting Moisture.Cable Repaired & Control Rod Realigned + (10:28:26, 19 December 2024)
- ML20049J496 + (10:28:35, 19 December 2024)