{{#Wiki_filter:7 4 BECHTEL POWER CORP.

SUMMARY

REPORT FOR DESIGN MODIFICATIONST P@[Pll0 [7l77 TO FARR COMPANY 40 MW FANS d rr g '. 31982 __thLWlbu & JOB NO 9645 GRAND GULF NUCLEAR POWER STATION -UNIT #1 Prepared by Date: 2[8/62, Independent Review by: Mh Date: 2/9/92 Approved by

2 [ k Date: z./g / t INTERNATION'L ENERGY ENGINEERING, INC.

A 77 North Washington Street Boston, Massachusetts 02114 Revision 0 February 8, 1982 Ohhhhk 4 PDR

r'

SUMMARY

REPORT FOR DESIGN MODIFICATIONS TO FARR COMPANY 40 MW FANS TABLE OF CONTENTS SECTION PAGE 1.0 Certification 1 2.0 Introduction 2 3.0 Description 3 4.0 Design Criteria 5 5.0 Loading Conditions 7 5 6.0 Mathematical Model 8 7.0 Computer Programs 10 8.0 Analysis Techniques /Results 11 9.0 Summary of the Analysis 16 10.0 Sources of Formulae and References 17 I Appendix A Calculations l Appendix B Computer Output Revision 0 s l February 8, 1982 -i-4

1.0 CERTIFICATION i This report was prepared for Bechtel Power Corporation by International Energy Engineering in accordance with Specifica tion 9 64 5-M-6 3 3. 0. The report is part of the seismic qualification of the Farr Company 40 MW fan units for the Grand Gulf Nuclear Power Station Unit 1. e KENf1ETH A. LAIJHAM M-1 No gs 4359 w ncerm:ta: o PM722.M:in alc!J:Ep. Certified by:

h. ew c =. = = -

Kenneth A. Lanham, Professional Engineer Rhode Island No. 4359 ) l 4 Revision 0 l Fe'oruary 8, 1982 l [

2.0 INTRODUCTION

f This report is in response to NRC inquiries concerning the Farr Company 40 MW fans (MPL Nos. QSZ51D002A-A and QSZ51D002B-B) supplied under Bechtel's Grand Gulf Spec-ification 9645-M-633.0 for the control room standby fresh air system units. During its Seismic Qualifica-tion Review Team (SQRT) walkdown, the NRC indicated that the lowest natural frequency had been overlooked. ^ According to the NRC review, the original analysis by McMahon Engineering Company (documented by Report No. 76J-ll67, dated June 28, 1977) had not considered the flexibility of the motor and fan support channels in the horizontal direction. Bechtel agreed to stiffen the fan support channels with bracing to eliminate the potential low frequency. In-ternational Energy Engineering (IEE) was retained to design the supplemental bracing, thereby validating the acceleration values used in the McMahon report. Revision 0 February 8, 1982

3.0 DESCRIPTION

( There are two 40 MW fan units, assembled by Farr Company, located at Elevation 133' Od of the Control Building. The units, which weigh approximately 850 pounds, consist of a horizontal motor and centrifugal fan with approximate dimensions of 34"x44"x48". Figure 1 illustrates the gen-eral configuration of the unit. The fans were manufactured by Buffalo Forge Company (Type MW, S,ize 40) and have 20 horsepower Westinghouse electric motors, which operate at a speed of 1800 revolutions per minute. The fan wheel is located at the end of a shaf t which can-tilevers from the motor. The motor base and fan housing, which are made of sheet steel, are mounted on a support frame. The frame consists of steel members made of bent plate and American Institute of Steel Construction (AISC) structural shapes. The support frame members are joined by welded construc-tion, and the frame is fastened to the concrete floor of the Control Building through use of anchor bolts. Bolt-ing is also used to connect: (1) the motor to _ the motor base, (2) the fan housing to the motor ba'se and support frame, and (3) the motor base to the support frame. 3 i l Revision 0 February 8, 1982..- -

Figuro 1 - Configuration of 40 MW Fcn Unit I --Fan Wheel t-Motor lY Motor Base, / l -Anchor for l De tion [ll Only i/ l ',/ ~ II f, ' ~ <, ~ ps ll I / i ~ Fan liousing {, of bolts on bent plate { (typ.) Motor Base & Fan Housing 3 '~ g - {' 4'-o V " 4 Bent late [ Y Base Skid Note: Dashed lines are proposed bracing members Support Frame Revision 0 February 8, 1982 4.0 DESIGN CRITERIA i 4.1 Stress Evaluation of structural steel members and plates shall be in accordance with the AISC Specification, Seventh Edition. However, no increase in allowable stresses is used for earthquake loading. A value of 36 ksi is used as the yield stress for all struc-tural steel. Allowable weld stress for fillet welds is taken as 0.40 times the yield stress of the base metal. Bolts equal to or. greater than 1/2 inches in dia-meter are evaluated in accordance with the AISC Specification, Seventh Edition. Smaller bolts utilize the same procedure except that allowable stresses are taken from Marks Handbook, Eighth Edition. Anchor bolts are evaluated by comparison with the Farr Company recommended allowable loads. Bechtel Specification 9645-C-103.1, Rev. 8 is used for the design of Hilti anchor bolts. 4.2 Deflection j Although the stiffness of the shaf t was considered j in the McMahon report calculation of fan wheel de-fl ec tion, the stiffness was not included in this analysis. Therefore, the deflection used in this analysis is based on the McMahon report's allowchle deflection minus th'e deflection calculated in the McMahon report due to the stiffness of the sha f t. Thus the fan wheel allowable deflection for this analysis is.1369 inches. ~ Revision 0 l February 8, 1982 -.

4.3 Frequency t The fan unit must have natural frequency greater than 33 cycles per second to validate the use of acceleration values at the zero period accelera-i tion (ZPA). The centrifugal force applied in this analysis has been increased by a dynamic amplification factor (DAP) as described in Section 5.0. The DAP is based upon a natural frequency of 66.5 cycles per second as calculated in the McMahon report. 1 .i Revision 0 February 8, 1982, ~, , _,.. -. _ _ - - -.,. ~ -

~. 5.0 LOADING CONDITIONS I For the analysis, the motor-fan units were simultaneously subjected to three types of loads:

1) Deadweight
2) Seismic loads in three directions were taken from the Safe Shutdown Earthquake (SSE) response spectra curves for the Control Building at Elevation 133'-0".

The loads were based upon acceleration values corresponding to Zero Period Acceleration.

3) Operating loads consisting of fan torque and centri-fugal force due to fan. imbalance.

The centrifugal force was increased by a conservative dynamic ampli-fication factor (DAF), which was based upon the ratio of the fan unit natural frequency to the operating speed. Maximum stresses and deflections for the worst loading case were determined by algebraically combining deadw6ight, seismic, and operating loads. i i 4 i l I Revision 0 February 8, 1982 2 i

I

.w-.

6.0 MATHEMATICAL MODEL i The STARDYNE computer program was employed for natural frequency determination and static analysis. The fol-lowing components were included in the computer model: Beam elements were used to represent both the support frame and supplemental bracing. Modeling for the sup-port frame skid members, including anchor bolts, was extended sufficiently beyond the fan housing to accu-rately represent boundary effects. The anchor bolts beyond the fan housing are considered fixed; the anchor bolts beneath the fan housing are considered pinned. Tri-plate and quadrilateral plate finite elements are used to represent the motor base. Stiff axial members are used to represent the distance from the centerline of the support beams to 'the interface of the motor base. Bolted connections are modeled as stiff beam-column members, because of clamping pressure exerted on the motor base near these bolts. The fan housing is modeled as a rectangular box shaped structure made up of quadrilateral plate elements. Al-though the two faces of the fan housing consist of in-terconnected plate and sheet s* eel, all cross sections are modeled as having uniform composite thickness. The internal components of the motor and fan, including the cross-sectional properties of the shaft and rotor, are not included in this analysis. The effects of the motor and fan masses are transferred to the motor base by means of rigi.d elements. Revision 0 February 8, 1982 In accordance with IEEE 344-1975, the SSE response (, spectra was used in this analysis. Because the accel-erations are taken at the ZPA, their values are not dependent on damping. These SSE response spectra curves provide conservative acceleration values when compared to 1/2 SSE curves, i I, I 1 4 Revision 0 ( February 8, 1982 l p r l + -

7.0 COMPUTER PROGRAMS The STARDYNE computer program (1977 update of Version 3) was used for natural frequency determination and static analysis. STARDYNE is a public domain program which is readily available through Control Data Corporation (CDC). STARDYNE was the only computer program used in this anal-ysis. Computer output for the analysis is enclosed as Appendix B. r \\ s. s k i c q \\' 3 s 3

t' L

P W w A. s* r Revision 0 s February 8, 1982 -

8.0 ANALYSIS TECHNIQUE /RESULTS ( This section describes the procedures used to analyze the mathematical model of the fan units. Critical as-sumptions for this analysis also have been provided. The calculations for the analysis are enclosed with the report as Appendix A. ~ 8.1 Procedure To eliminate all modes of vibration that would produce a natural frequency less than 33 cycles per second for the motor-fan assembly, bracing members were added to the base skid and bent plates of the support structure. By ensuring that the lowest system natural frequency is above the ZPA of the SSE response spectra for the equip-ment location (El. 133'-0"), a static equivalent analysis is justified for structural evaluation. Accordingly, seismic qualification of the 40 MW fan unit is demonstrated (

Reference:

IEEE 344-1975). In addition to exceeding the 33 cycles per second requirement for static equivalent analysis, it is desirable to obtain a natural frequency of 66.5 cycles per second to validate the DAF used to generate operating loads. The Lanczos modal extraction algorithm was employed to extract the 10 lowest natural frequencies and mode shapes of the' motor-fan assembly. The lowest natural frequency was 67.4 cycles per second. Revision 0 February 8, 1982 A static analysis was performed combining dead-( weight, seismic loads in three directions, and operating loads. Stresses at the bolts, base framo, bent plates, supplemental bracing members, and welded connections are checked against appli-cable allowable stresses. Although some members stresses were checked by the STARDYNE computer ' program, individual calculations for combined axial and bending stresses are performed for channel shaped members. 8.2 Assumptions This analysis demonstrates that no low fre-quency modes of vibration are produced by the base skid and motor support members. The analysis qualifies the motor base, fan housing, and support members for the loading conditions described in Section 5.0. Qualification of the motor and fan is by others. The boundaries for the structural model used, in this analysis were considered as being at the fan housing-fan duct interface and at the first line of bolts to the floor beyond the plenum. All bolts (3/8" f) connecting the base skid (MC6 x 15.3 and C6 x 8.2) to the floor were treated as pinned support points (only trans-lation in (3) directions is restrained), ex-cept for the final line of bolts beneath the plenum which were considered fully fixed an-chor points (translations and rotations. fixed in (3) directions). Revision 0 i February 8, 1982 7 All offset elements between member centerlines ( at the base skid channel sections and support members were modeled as members with a finite stiffness but no weight. The internal components of the motor and fan were not modeled in this analysis. The motor and fan were treated as lumped masses with ro-tational inertias, located at their respective centers of gravity and connected by rigid ele-ments to the top of the motor base. The fan shaf t was assumed to be supported as a cantilever beam by the motor, i.e., no bearing of the shaft on either side of the fan housing. The actual stiffnesses of the motor and fan shafts were not modeled. k The 7" deep bent plate sections supporting the motor base were analyzed as channel sections, Theconnectionsbetweenthemotorbaseandhan housing frame were modeled as rigid elements, representing.the effects of the 3/8" $ bolts. The fan housing was modeled as being of rec-tangular shape for analysis purposes. The inlet and power side plate thicknesses were estimated by information provided in the McMahon Engineering report and through field measurement. Revision 0 February 8, 1982.,.

The inlet duct was evaluated as to its stiff-( ness characteristics and was found to be capa-ble of providing restraint against translation and axial rotation at its interface with the fan housing: For the dynamic analysis, (4) modal points lo-cated around the circumference of the fan hous-ing-duct interface were restrained against translation in (3) directions and rotation about the longitudinal axis of the components (X-axis). For the static analysis, these (4) modal points were restrained against translation in the X-direction and rotation about the X-axis. This results in maximum loads being transferred to the motor base and down to the support frame for purposes of checking stresses at that loca-tion. Also, this condition of restraint re-flects the loading induced by the erection sequence, where the inlet duct is connected to the fan housing last and does not assume any. of the dead load of the motor or fan. The four bolts connecting the motor base to the bent plates were assumed to transmit (3) forces and (3) moments between the two components at their respective locations; any other intercon-necting elements between the m..or base and bent plates were assumed to transmit Y-direction loads only. Motor and fan wheel weights were taken from the McMahon Engineering report. l Revision 0 February 8, 1982 -

= Operating loads used for static analysis were assumed to consist of fan torque and centri-fugal forces resulting from a theorized fan unbalanced load. In the static analysis, new TS 3"x3"x\\" members (Item No. 12) were considered to have moment free ends at the connection to the base plate (Item No. 14) for the purpose of having a con-servative effect on the natural frequency anal-ysis. These connection points were considered as anchor points in the static analysis and the base plate was not included in the model. For the design of the base plate and bolts (Item Nos. 13 and 14), the maximum moments at the far ends of the TS 3"x3"x " members were used with the forces existing at the base plate from the anchor points. This resulted in con-servative loads for ca.lculating required plate and bolt sizes. The stresses on the motor base, reinforcing L 4"x3"x3/8" members, and the component sections of the fan housing were not checked against allowable stresses. The McMahon Engineering report had considered these items, and the static analysis showed no significant stresses at these locations. E = Young's Modulus = 29,000 ksi Weight density = 0.284 lb/in3 Dimensions shown on detail sketenes we'e obtained r from field measurements. ({ Revision 0 February 8, 1982 i ? L

c r 9.0

SUMMARY

OF THE ANALYSIS f With the supplemental bracing members, the lowest natural frequency of vibration due to the flexibility of the sup-port channels was calculated to be 67.4 cps. Therefore, stetic equivalent loads used in the McMahon report - based on acceleration values at the ZPA - are justified. As previously noted, deadweight, seismic, and operating loads were applied simultaneously for the analysis. The resulting stresses and deflection in the support frame, motor base, and fan housing were evaluated and found to be within allowable limits. 1 l .j-Revision 0 February 8, 1982 -

10.0 SOURCES OF FORMULAE AND REFERENCES r 10.1 AISC Manual - 7th Edition 10.2 Bechtel Specification Nos. 9645-M-633.0 Rev. 13 9645-C-196.0 Rev. 1 96.15-E-091.0 Rev. 3 10.3 Beer & Johnston, Statics & Dynamics 10.4 Biggs, Structural Dynamics 10.5 Blodgett, Design of Welded Structures 10.6 Farr Company Drawings No. D-55526, Rev. K 10.7 IEEE Standard 344-1975 10.8 Marks' Standard Handbook for Mechanical Engineers - Eighth Edition

10. 9 McMahon Engineering Company Report 76J-ll67, dated June 28, 1977 10.10 STARDYNE Manual 10.11 Correspondence Bechtel interoffice memorandum to Mr.

R. E.

Green, dated January 28, 1932 Bechtel letter to Mr.

T. H. Cloninger, dated November 30, 1981 IEE letter to Mr. R. S. Trickovic, dated January 11, 1982 Revision 0 February 8, 1982..

QUALITY ASSURANCE PROGRAM CALCULATION COVER SilEET Calc. No.CSZ51D002A-A,B-E Job No. 9645 DISCIPLINE: MFOIANICAL ENGINEERING No. of sheets 61 J TITLE MISSISSIPPI POWER & LIGHT COMPANY GRAND GULF NUCLEAR STATION UNIT 1 SUBJECT gp i FARR COMPANY 40 MW" FAN UNITS 4-g ,er F (DATE) 4.4 E STATEMENT OF PROBLEM SEISMIC QUALIFICATION OF MOTOR FAN ASSEMBLY FOR TIIE CONTROL ROOM STANDBY FRESil AIR SYSTEM UNITS AT ELEVATION 133'-0" SAR CHANGE SAR Ci!ECKED l SAR CIIANGE REQ'D NOTICE INITIATED SOURCES OF DATA X Computer Program Data - STARDYNE Version # 3 l_ McMahon Engineering Co. Report No. 76J-ll67, Dated June 28, 1977 1 Farr Company Drawing No. D-5g gv K g SOURCES OF FORMULAE & REFERENCES [ Design Specification Bechtel 9645-M-633.0 Revision la 7 AISC Manual - 7th Edition X IEEE Standard 344-1975 For Additional Sources See Section 10.0 of Summary Report PRELIMINARY CALC! I FINAL CALC l X l SUPERSEDED CALC NO. B f/6/BE 10 DETERMINE SEISMIC INTEGRITY MJlhuh[_Mk 2[p/gy,h[Q 2/B/g[ DME DESCRIPTION . BY biECKEDBY DME APP BY DME

CALCULATION SHEET 9(04 6 cAte NO. G $2 SlD 00Z A-A@S.D& ncy so _E sos. no. 2) 2-MISSISSIPPI P0"/ER & LIGHT COMPANY ev 041s, p_ ,,noner // l suax er . GRAND GULF NUCLEAR STATION _// B2 cxo o,1, MOTO R FA N A SSEM BLY sseer no. 1 O E__W

l. DESIGN SXETCHES FOR PROPOSED BRAC. LNG hD 2 '- 4 "

2 '- 4" 7 N E 7 M h -k h ' 'Q 0-f M o 3 o 3 p ~,. E' b AT 3 = 1

  • l

^ <3_

  • \\

a i v iF FI 5 = m r ( l e Z l l n i l e--, m -p-a % e %" h a o C o> C 9 I i l i I s_ e-

CALCULATION SHEET 45 cate.no QSZ SID002 A-A sB-B REv.uO. 8 JOB NO. plSSISSIPPI POVIER & LIGHT COMPANY,,g,bMp. 2/,/,ar_ PROJECT d GRAND GULF NUCLEAR STATION_ ggg 22g j ( sue;Ec, _MOTo R F A N AS_S_F,11 SLY SHEET NO. 2 OF Gl l TEM LIST A. EXISTING MEMBERS ITE M No. QUAN. DE SC RIPTION / 2 MC G x l5 'S 2 I C 6 x 8.2 3 / C4454 4 2. 1"x 2" BENT IV. ( DAto"THCR.) B. PROPOSED BRACING ME M BE RS ITEM N O. GUAN. DESC R I PTION L 6 i TS 4 x 4 x V4 x l'- S Vz" LG. G / TS 3x3xV4 4 2'- 11/z" LG. 'T / ft. " x 5" A G' 8 4 fl. Vz~ x (o" x 'l" (cu AS SHOWN) 6 6 " x I /a >( 5 /[0 " 9 2. 3/8 lo 8 Ik. N " x I $0" x & la " iI 2 & Yz" x 4"i4~ 12 2 T S 3 x 3 x V4 x O'- S" LG. ~ I3 2 V2 tilLTl KWlK BOLTS ON 4 ITEM 14 -4F2D 14 1 & Vz x5 x 2 - I V2. Ls. { l l f r \\

M sos.uo. CALCULATION SHEET Ho45 cate.no 45Z5mpo2 A-A 31 nEv.uo. _B 3 O., f" 8[ (/g _ [M,,((f., _ MISSISSIPPI POWER & LIGHT COMPANY,,A PROJEOT ( GRAND GULF NUCLEAR Sl ATION f sussect MOTOR FAN ASSEMBLY SHEET No. 3 OF (e l ASSUMED BOUNDARY OF / ST RUCT U R AL MODEL g I j li i J 'e _j k k 11 = = emm = 4 v. 4 7, y o c a o A EX ISTIN G D/8" p BO LT S (T Y P.') SEC. A-A (] (TYP. BOT H SIDES) q_ I g y - MOTOR BASE / BOLT l ll LOC ATIO N S ll I l 11 , -, w~ ]4 - _ _ - -i== / 4 V (TYP. BOTH E NDS Ef6 h ears / %V j A V-V4 V _ %. 6! 3 4 __ d ... uevu . eve., , - 3 '%" i t '- 9 '%" i: 4 A. I' I o-a_'l. SEC. B-B

CALCULATION SHEET so8. NO. 9b kN CMC.NO O S E 5f Doo2 A-A.B-B nEv.No.,_S MISSISSIPPI POWER & LIGHT COMPANY,,1 g.1

  • ['

C ,o,,,c, GRAND GULF Hi> CLEAR SI ATION ,fg/ ,,,,__jfjf g PROJECT /$* c,, MOTO R FAN A5_SE_t1BLY SHEET NO. 4 O F GJ B Ydci 3 g i I L D D i '-4Vj' 3 SEC. C-C ( Ty' P. BOTH SIDE S) F . 2 ". i i / =- ham b~ STlF FENE R 4. D E TAIL C

CALCULATION SHEET % 45 CnC.No as? Si D002 A-A.B-a nEv.No. _.D sob. NO. ,,4 d ' #f oj,/ MISSISSIPPI POWER & LIGHT COMPANY g PROJECT SUBJECT CAD CATE / // 8d MOTO R FAN ASSEMBLY SHEET NO. 6 OF (o f 2. TYP.\\ \\ / / 3A l _2 t _1I l~ l Y,, 2 Y.,

      • p Y,
  • 1,
.c

.a

9

..s. -h

  • O ',

a g a

  • " ' if

, a -, f r-o* o. .A y O. .o s*, e' j~ g X l 5T IN G /8'" h BOLT (T P.) l SEC. D-D EXIST'IN G 6/8 6 BOLT S / 4 / b f f TYP. N \\ mcs.ogy p \\ \\ lhrj (TYR) T to - .} SEC.E-E ( T Y P. BOTH SIDE S)

CALCULATION SHEET JOB. NO. 9645 cAtc.no.QSZ6f DOOZ A-AR nev.no _ $ ire $ eaoscer MISSISSIPPI POWFR F2 11011I COMPANL av ud.$ 82 ( ) suB;ccr GRAND GULF fiUCLEAR SI ATION O[M /(( o,1, '/ cxo _ r MOTOR FAN ASSEFiBLY SHEET NO. G OF GI s MOTO R BASE / \\ n i, > < a / \\ u 9 o,, , x V ^ II M V \\ lN "N <rve m cs b/ LAM a.. 7; c. a e .t ;y' s i l-I" (TY P.) SEC. F-F

CALCULATION SHEET

  1. 1~

cuc.no DS E SlD002 A-AA13 nov.uo. B . sos. No. MlSSIS.lFPi s. Lui,VANY (,;af, (;gy,,f, ( caAnD GULF iidCIEAR SI Afl0N g j j ff/?//E PA Af f//// //0)sP FM A/./f0. guggr un_ sf o,e fog i

2. GE O METRY IN PUT FOR 'STA RDYNE' AN ALYSIS W

V, \\ \\ sv \\ gf = $4T C \\ 4 g ~g-Q- O id$ h NM g_\\ t un A 14 /\\ C k Q' e Y p \\ 4, t s \\ / s ? Qh

t. -

g~' [ t w S o4 QW =% B-st d-u Dq\\ a'a Et eg I' l E s 3 ( N 5

CALCULATl0N SHEET ,,,,,. e c j . trANY ^t no. asz 5 mooz g-A>D E neu,. 3 C MISSISalPPi t U.- GRANU GULF fiUCilAfdrAfiON "' #'* 4#4# c o.g, om ,,,,,,c, yg ..,aw Q suancr g ,EET NC. ~ ~ ~ u,,.:.,n,n,,,,,, 8 OF (p r H .vs 2 W A e h \\ N s \\ a a N 4 t g x e. hh t b g' 'N h x \\ -7 t S dd,

X5i, y

s y g s@ r g, k .g 8 1. [, D o D W T _fy N6 \\ \\g5 [._ @ 'l .g, a g" g / h _) D / o c, O- .u Q Q h '2' k 't e i -G 3.a. h " 4, ~ f N ( n \\ ' Th> ~, g 7 N 6 9 S E y U x %*:6 N' t, i .,,W g j' - \\ _Ic 4 /f Ae E / 't. E **"~ e w\\ / %1t b l

  • %c 1 %

6E/l s

CALClJLATION SHEET "U ^'A M "'" " B MISSISSIPPIId$E & e O fa MP" ~ N/{. M N 8/ Ulih3D UUlf hdLLLaMit0N_ Sr PROJECT o^te _~_ _ _ _... b SUBJECT DATEI ['L - CKD A w uses snu.m mnw on sus". er o, (, g E 4 Y A x E E

  • s Q

= O f. 4 5 b J' E

    • # a R

E a J l s ~ t O, *~/ r f (g)i R /*m @ g g$ V i le,a e i'h/ 4/ 0 a /5 y s /q r t 4 $j f;I - fi / O 'f t/ ks d L _ s. g/M I'% ,o-s 'i,y, p, s a . _.. A g,J's -- %l , ;. ( e,g\\>'/<,, " // n p f k-) N' J 5, q, c, /g q '" e s,, 0_ e) b/d f 0 :, c '\\ [ ! Q:_ p' 'y s ,s Q, y o, 0 j _[l..q,3[D i ',3- \\' X7 n 0 gle .,. s t,s a g f:. 2, f s fh g,3 lb' sJ i \\ >' e. +t a' / 9 ) p )s; lc s.., e i N, u 7 .. /a e ,i l i ,e QQ vli j, l} L.: <<,%m1@ l f M e ki % "} y' jl .:p e c 's i %w, se ('.

  1. 2

.D QQ i 2 4 /s in *@ ' i w s V hs ~1 ,f ') 's f y m e b [D f q ps r*P e l r.c % l

g.,,,n g,.,,

Oi h H5kci t on ND o gg= M? noon e 2s L mC $ 'm a-gQaK ga~iy7 2 n t uN 4 3b m$yC C m fb$ ek* Em n ag M% l $m %r h$ g4 s xTg gh g %Q# ~O on D m5N o %5 q)c o b K / f,J 3 S y b'

  • Kh, vh%.

f ,O% y N< % ~~%.k% p'%N V y o f r e /o ?, ~' o ~ s (7, ("f a 'k,n i '.,,*m ,s; ~ o s 7 o 1%N g~ Ws g.]~ I' a \\ 'o )' g c L, g ~7 (< U s Nh p p / v%

  • n 2

y ^~h ' ** '3 A Z 4 R 3 T J s' - 3 ^ / l o A o s @M/s

  • b '

6 g ?, ( z ? ap C s R / E ~ B q~ g g tt E V /, M s g /0 g { g 3 8 g/ j / 9 OI >/ u 1 T ,K /, D F 1 I 7 D 7 D 0 A t - 4

g. -

s 8 SS r%f N, 4 % S' ,\\ f >' f, I y b( \\ i , i

CALCULATION SHEET n er r .NO. M133 /DOO2 A-4 g b Ib. P [.;g Mjgy 'N' ha*W ,p,,, '4 h GLEhR SIhil0N BY 9, PROJECT L

SUBJEC, Cg DATE.

U**//f />& m '//// Nopp4 4 ATJej,* SHEET no' // o F 6 f IP '** m ,,p LL ,p ^/,,,{gt. rv? i + 7v? '. o73 ] pic7 > 18 3 " ~~79 p ,y' @ f g / g V "@' ~ p -T~11 / .,, c - n! a g ,A'@ 0 /T r 8 s s 'I'So g 7T ' e < 3l$, h e

  1. ,c-

/

g...

.. d 'gt I "w

y. '4,g ud) g' f "'

I i n:t \\sf [ i>= f szs I In, g /ui a l eD /348 in y n e y A so es -br g / ,a c fci z a 'O g' v's t T.t ,g7 OA y >ne si S5 O' l 1r, 4 2 -; iu 3' r 1 g ~ -ica d ic z t %t dV i 3 6 r, S-Mpo l// U u y z } L-i u x3g ;A / l g7All k

CALCULATION SHEET cnc.NO. QSE 61D002 A-A,B-B ace.no. _B sos. no. PROJECT BY DATE p GRAND GULF NUCLEAR SL AILON~' gy [ g! t' i A*p //E p n g ttyr/J MJoe FAk Afff&, sugsr no. IZ OF Gl I r{1 1' 8 f 47 Y @} ys' ' 4, q N 'n 5 M' g,m Q Y f0 f., N q

g h f.o' 4r

, ',,, o j a Y' p;' A, b.s v e-g e: g ..c G f -w g ,G <g!o, f j ag;, K'A s,f g .e A ~e x a 6 x e 1 X xr ;,, e Jw e a j p-, [' i g e- 's g',,,, ,,3 ('a? p,f 6,;gl,,V'),{/ 'f&" s ~, r;. o ,3 %,vA e m ' l,(p kn ,f1 Dy U y 0 %,y L ,,,s k,0 (Lic. !g i ya e'"* \\/ 9 ~ iS?, N (* N,,, s y se ,a ,7> e,g ,.g@ s o s @ s,y{ (f ' @,a rg?'" g ,,3p/gfo' s' arr s,;" <9 Q p 9 ,o g*' o pf g , +.

CALCULATION SHEET % 45 cAtc.No GLSY 5f DOO2 A-A B-B r.Ev so _ B Jo2.NO. gy._ h, _ CATE.l2-Of_O f PROJECT ~ U SUBJECT GRA.'iD GU.c huutEAN S: AfiON V CKD N t'Y' DATE b I MOTOR FAN ASSEMBLY sheer No _ 13 0 F Gl MOTO R 7 T E_ t C.G. OF MOTOR I ( WHEEL N ( ) x l I /0 a i i DETAIL ~4~ MOTOR t FAN WHEEL 2G'I Gos ,~ N 397 f ~ < 2tos gyg-3 q. 2'll y 29; h \\ l h b Ng 60 l i zaz 6 d' O' , 2 6 '$ n G. o. \\ .75" z <gq 3 WGHT. @ NODE 268 = 268* NOTE: NODES 240 AND 164 WGHT. @ NODE 2.'7 l = '71. 3 ARE IDE NTlC AL 1

CALCULATION SHEET 3646 cAtc.No. OS7 SlDSO2 A-A B-B ncy. so. _D sos.no.. ev d M oir, i2/2t/sl MISSISSIFPI POWER a LIGHT COMPAflY ,,no;,c1 O GRAND GU!.F fiUCLEAR STAil0N c,, gd_ ,,,, g g g su,,,c, 14 0F (o f MOTOR FAN ASSE MBLY sscer no CO D I NCr OF L k x 3 x 3/8 STIFFENERS I.W (m.) 15 64 n ioz ,y,,y,,,,,h[ (Q b's OQ w Is go, ,c, ,,1 g, 46 85 302 M 'to 3,3 O 4 l-I. %- (Tye.) Y a =E (TY P.) 11 88 97 /6 10c

r 3

ML b JD d l sns'v isq " is 3,y311 v l 8 8 Gl i

312, 3l04 I/5 0

6 52, (ib 3,9 (iit 124 l l

CALCULATION SHEET [m. 5 cuc wo. Q SE 5 f DoplAA*33 "'" " B s e. n. Qp PROJECT _ JalSSISSIFPl FOU" & IICH' CD:L:Aliy U ,,,,,c, m a catn a tuas a ou c,,, -Jpk nom nounsa s"EET No. I6 OF 6f T T O pI o f PAtg NOUS /g g_ /78 9 I mi 9 lo b ,s. e C,_,, ,,,9'g isa g 'z7 5.. n. g 10 ss 9 ,,r g zzo 4" 'rs A<t3 g-Q, 5,, %,n,es 0 r 19 9 e g\\ jg y }- a x E s

CALCULATION SHEET soa no. moq5

  • ^'*'"* GS E S I D o oz p-MISSISEIPPI rotEn g glGHI CO PANY
  • ' 1 (J.

DATE_L#24[gf '"oster ( GRAAD CU:.F HUCLEhR S1 All0N exo ) [ g ] '"*'Ecr 2 070R FAN 433g Ly SHEET N ' /0 OF G/ MOTOR SIDE STIFp 5NERS ON FAN youg,N& 33') il70 s 33(,<

}

'/75 Ejg 3% 35' yo d h. '/74 3 Ol' 336 f15 334' [ 'N33 I7/ ,I jg,g > 32.5 2/ N 33o /57 333<N /53 N

  • S24

'g ,'# D N n ( j

3gg, 332<

x

  • 15z

'37.3 R 32e Np Y b Q' '32g n C af 327 X si '32/ >320 1 l l

M scano. CALCULATION SHEET 1 9(o45 cyc.ua a s a 5 in002 A-A 4-3 nty.ao 8 frilSS!SElFPi F0"!i~ a i!Gil. CCH!'AWY d h% o.1caz/22/ei PnOJECT ey O GRAND GULF i!UCLEAR STATION cs,{ [ [ ,,,,j gg su,,,c1 MOTOR FAN ASSEMBLY sseer no. / '7 OF (el__ _ DdCT SIDE STl F F E N E RS ON FA N HOUSING 353 Y zyr '35z / 351 4 .,.\\ '350 g >* 2NO 1,s, x, 34 '34'l 221 g94 220 264 zob e,yG I ,exe nu ,nz iss MS,,z 250 zg, ,,z ,11 344 zS9 l 221 8 42 25'T 1 19 9 h. M/ 263 ApolTioNAL MEMBERS FOR LOAD TRANSFER r l

CALCULATION SHEET N4I CRC NO. R$Y nID 002. A-A B-B nEv.NO. O JOB NO. PROJECr _ MISSISSIPPI P0'llEP & IIG!!T COMPAi;Y ey km d.ll o,1Egdt I GRAliD GULF i:UC!.Ela 31 Afl0N c,, y ,,,,_j g g g sus;ECr MOTOR FAM ASSEtlBLY ssEEr NO. /8 OF bl 337 I'lb D 3' ' '175 x N f N ,ze ,sz 333 \\ 'IV 9 320< 'n 324 N y ,

  • M eez w

x. ,, 3x-x x 3 323 . sz, MQ,W} Q . og., in f 320 o es 57 \\ 2

cal.CULATION SHEET 9GY6 CALC. NO. GS E S I D 0 02 A-A. B-B netf. No. B Joe No.- MISSISSIPPI F0VKR & LIGHT C0f,1PANY

d. bd otte iz/zs/si sv PROJECT i )

su ;tcy MED MU WMM SIEM ( '[ _ b ',1,hgh cxo o MOTOR FAN ASSEMBLY SHEETho 19 OF GI 'll

/07

/lG GZ<, 64 1 ,z4o / sm / ) / 156/ y s h3 4/D 238 ,,q / /y 33, N3s3 ~ }/ ^ -y ,a/ ~ - /, >e-x 3s, / 115 ( --% 33 m / 1I h 350 320 / 2 / 61 , se ,z, 3 ' 63 s ,,0 a 4,,- <s, /

CALCULATION SHEET sonso_lb45 c,tc,,o arts;ppo _A-A,eg., cry,,o a _glSSIS IPPI Pm'ir. A 110l!I COMKil av / ).n~6.,L P M o.rrg2j.a_t / PROJECT b/ suaster - 0[$bh0 GELF NUCLEAR Si AliON c,o gdL[s o.1,/dg2/2. MOTOR FAN ASSEtiBLY ssttr uo 20 OF bl NODE AND MEMBE R No's OF PROPOSED BRACINGr I ITEM No. G TS bx 3x M Y u 291 goo @ f'O 296 sor x_ I, ;_ i 'l (1 5" "6" 9 5"

9. 5" q

ITE M NO. 5 TS 'lx dx N/ AND ITEM No. 12 TS 3x 3x '/4 Y L zes 11 2 ,4, - E. g 351 - , %o ALL NoMENTS FREED Ii l AT SUPPORTS ,ren no.s a ex o m cs0Detco ns accrase0 tat eran 3 x u.~) v mY u

a

=1 . f, 2'IS 12 'I @ f @31 <, e k @ l@ Q 2'I) r 76 " 2'72 o h @ l! l_ ~ ' = = % } 50 Q 20 R Q to Q 8 s. m e-s- l 1 i i i

CALCULATION SHEET W #/ ,03 uo cuc no. an5 moo /.AA,M acv ~o B MISSISalPPI PO'/.E. & IGil 00t,1PANY ,, 6 u v daupp, e ~' //.M e/ c 1, q suestcf GRAiiD GULF (WCLEAR SI ATION c,,ygjj w c,,,y,gg, u ff,/)//d s9,M/yf/f /%'/t?N J'AN Afff//*_ sntti no _El_OF__k L ]'/>r..)9, ng JFfs/on PA/3;p i/E?, D/ Dr</Mo& S es' A ff: svfM A Y // I J-3 s l7t<wC is of I ~ !,r.1 : sies o n /> , s t': s 7s s t.: r v u 3 3 fr /At AstVA I /9st"2 A.v~ ft 's lfg a 7 ' //It npf4 L $!*.I $.g A ,;.,,upp,1 ./ o = yi,y/> c, sii/.ys,-p;...,,,, e a,, ? O .I.1 63 .51/2 d ' /1 Jr ,r g 'r, , ps,,jA ;.6g : Te '>t 7ps rwr, s: r.r I.s /3 ,>ssf : frA' W n :fr/ Ann 7: /3 6.4 E 73: *i' f./.' f u s~f 7/* PP ! ? / /' d*'e*/ ) i j C'w : D Ynsp,e 7N/f,w/rff 4'r.C/P/// t'/' furd SAR Jst.<0 J$. $AA? d ,/ :

  • /.*0 c. rf N ff frc :>..'Es r

.s> dt 1~ / / /* 'o ~ t ) ~.97 QC '7' ~ (/.I .7~ 7,C c : . <f. 8 (' /Jedd' ") : G. 6 ~/ Cl. 6/I Jsf s f/;.:

o. C C l'.*fE //nn yt, r /w.s/>/.

s~ w'.: ) f J /~j = SJ& = /* So / *' ' '" ' 'i s a / '.os , > t, ss-n') O t i

CALCULATION SHEET %S6 cuc.No G1E3&DO2 A-A.B-B pay.uo B Jos ho. enosccr _l}lSS!SE!PPI Fm'.'FP F1 IIGilLCQflPRH e<

d. 3_d o rcJ/2i/e,2 C

susarer GRA iD GUL? iRC!iAR Si ATION jMj_ ,,,,4/zr,/pt c,o htoIOR FAtLASSEtiBLY s ccr no. 22 or GI TOSE SE CTION S 2 7 1. c 3 -f-3j 't 2 T= 2 t (b)2 (pz (REF. P&. 2.lo-4,5wDGETT) bt-d bd Crog = btd SFZ= SF3 = 2(b-Qt A S5F2= $5F 3: WHERE G' STATICAL MOME NT OF CROSS-HATCHED ARE A A600T N.A. b= 2t l l l l J ( t

i M so3no.__ % A5 CALCULATION SHEET cuc no OlaL5D_]o_2Jd4-ft atv no. B enonct ___MISSISSlPPI l'O','!f" E llc'.!! 00I'ANY ,28, m G. b4%. c.1sJ/29182 L

suanc, GRA..'D GUL?..

LEAR SI A[l0U [/'lf,,,[,W te,h t c,3 M o_TO R FANJSAE t1BLY_ setsr uo D _ OF Gl SFROP NO. AN D SECTloH PROPERTIE S BPROP NO. DE SCRI PTION / MC O x 15.3 2 c (, x 8.2 3 C 4 x 5.'l Jl T DEEP SENT Ik 5 /.5"x 1.5" BAR

  • 1 r ^ \\"

ene t 8 81GlD ELE MENT $$ 9 TS3xSx'l A 10 TS ll K'l x 'Al /3 R." el" x M 5 l'l Lll A 3 4 /6 3 15 TS 3x 3 x!// /6 TS (n(e x VB M 4 FICTIClOUS MEMBER USED FOR MODELING PURPOSES E Mi G E N E R AT E D B Y STARDY N E' L

CALCULATION SHEET

    1. #1~

sos ceo - CALC NO G5Z5]DD01&A,Di nov no _D MISSISSIPPl POWr" & 'IG!! CCMPAiiY 4W/ 4aup/.

a. //. 3/

C ,u,OJECT PR ,y, GRAciD GULc om ai,R St All0fJ c,, gg]W ,,,j g f y _, ,,c, f/AMF #AMf f's H. von = fan #HFM, gng g, no y,y_og_(,3 . ). //C fr /f. 3 /

i. ss,

1 A: </.f sf:6,0.AA 3.So 7 {'. 1 9 C f ai : ? J o fr:. *f a.: 79 - J. 97 T /.sg b a J, JF3-6 r.3Jo .JS3 ~' S J F,o : .p r 3. Sv. 335 _ s99 g J.S h' - O r ?.*o ) 4 r e +. 3 9 r, 4..f. r,t ) 'I ~ ~ 51 5 ) = ~'. 'YAS 4 SJfp: ~'. GJ 6 r ~?. S f.C7 7 a p n'f. >* r * !s .e.s.c r. u S) < y r =.nin

u., :

w -u .. ?' 7 J..)? .f r. n c) e l= f, o' b OJS 15.* 'h, f fff. %') ~f o i

(*. f 3 /),'. *:s f } ' /.-

'e } 9y 7

CALCULATION SHEET fd #f cate ~o GS15 IA09EA_A#-B ste.no _S saa no. PHOJEC, _fAISSISEIPP! PCETR S 'lGT COMPANY ,, _ 6+// 4ad ,,,, N.h.a/ c,,Mj/ ( ) g,,,c, GRA:sD GUlr uuttiR Si Ail 0N _ _,,,, /;f f u Fen <w no m ! son,e c as s urs, sue,,no z s__gy__q I !). C& >'f.." , y l s.soe, 1 A.'..'s di S ao Afa A Cro 7 y.'s 7 f.0 :.ree b = d. / Ipe.6G: 2* Pt b J ?f = fo. O X

  • A =

0.60 f 2.+ l jy,, - 2x /.920(.343) = 0. Sf 7 ?. 4 A 6fs ( =J ? 1 '.k} ?. s!9 ' (. ! * !.s! 7)/. ' " / ~ :' 57 0,, = f [ f d ? rs. 4'agt ). ? J ' = ~ ad !sc3= /. 5 7 a..'.

t. y r J.' * / r. f p JS Cg r

$

  • d 6 v' t. / 0
3. 1 ~'

.got w..ysj) J} f f a ,7 = j p 3 6 ?s) "" ! ' i.* ~. t. z!l.' / '.-?).j o t t.y =

CALCULATION SHEET 9' #r cac no RSzs1DDRt.ka,B2. eiv no - D sco no MISSISSIPPI POWER & 8 IGH' COMPANY _,, (444au ;/., // " B/

raoxc, o,c

( GRA:,0 GULi leJuCAR SI Ail 0N c,,gQ c,,j/ac/g_z_ l ,,,, c, f:PR/// AnsW/spf /UDA'.r/w At/Fn_ weeruo 2b__of Ql ]* C O S'A } /. /ft a s /. f q d'= ./. c 6/*/E84 f =./GC /s s./84 f Zr: .ya S S 19 c 3/9 i JS8 I- - ff; : ,/ 7 * /RJ ..!6 5 l /. Cf ! f/. r& J /<!GS ),

  • Syd g

". A,e s.59 f;. hr./84) /.0 + (s.58J ~./8.r) 4Gdiff ~

  • f ^6) =' /-/3S*

ffry, A/3S<^EP

f. SJ8 f.w.~

dg. Ef/s/sv.?pf,)y/.std.

  • J ? $^

/3 s ??{ Y /* $ ? 1./$l w 3 3/9ffv./GS) N,s y ) $ f /5 8~'~./3 < / f t 9.:) ' J=3 5 =

  • s 3't.C

CALCULATION SHEET cate ao QSE51ppo2 A-A,3-3, ncy.uo. B soe uo. MISSISSIPPI POWER a 'IGHT COMPANY 6/a/. /ea,I- [ M. e. e/ O ,RoJECT P BY OATE GRAND GULF fiULLEAR St All0N c,,gg g ,,,, f/ jg'3 ff/Ms?Ab N 991 thic# /NJ As rf//, snt Es no. 2'1 OF le I t fs)ECCh7/NA7f ]//4 Y 7Yd 2 d*7 " 6/=.? f: J//; I^~ I i A - 7h,g;) J ZO-Q)3//g = /. Gif f ~ " = 7/'/")A-2, ) ' llt-$) %. i.ss.s-h 3 ^ 7f3/;) ' :!!- 2// ) ?//s l i I i Ty <,' /.% W 5 th'4',JJG)$ft.ih:Mj)/ r,;2) <] h t p = l3. <v 7 / ' .If ~,, / 7 ]!"~ b ) f 1 s~p(I'-Y;,) h ' 5 ) f.^ %; / sN; )~ ).SC g/. *j/3p s) 6 ~ / z 63 8 = 7 ',,*l ; =

  • ' fi
  1. . -,/

3* (2.o p s. o. sn

rc=

2 /..:.;; J ' ~.- r/5%). r a h 3//;) ~%: D e,{, ) = / ?<M .r:r - .e m< < i. au

i. o,

' T. ' ' ) v 3//g / f,'. ?'..* \\'.;//, }. 2f f ='

  • l'r :0

}p lSk' =

  • J/ >' ' 5 / '

_ y,g3o b ( .I 7 '93) 3 / [ .%;)('~%;) = o.")] l I -/ e .7

CALCULATION SHEET

    1. 'r sos no cate no GSZ5MOLicAD:D neano 3.

MISSIS:alPPI PO'.E & IGl; CCfh AfiY ,, 0 /e y /,a,,,.f. ,,,, jf. f,. e f g GRAaD GULt fiacLt!AR SI All0fl pg_ {

jgg St9 )//f /V;Drtjpj //Hel' rA 4 AtIFN,_

su g g, no. 2_9 o 7 (, t / $*h fot/D /.3//.C. = l/r l _/ A: {/-f) I: pjf/f) =

  • d.'/ 9

/,, t l J=

  • /.?of f /* 5)

?//8 Cs *$$(/*f) /.Od x Sf r ff): 0 c4 S~ f //S): fffy : /. r h

  • Oftf 7E D 3

7.) souc /vi n= /. o I, 7,' //) ~ = 8 93 y,./ dos (~

  • db' ffy - ffy : 08S J!r,- firy : /. S l

CALCULATION SHEET 9645 ce.c.no. _Q 57 5i D 002 A-A D-3 nce so. B JOB NO enonci _ MIS $l3,lEEl I. i t5...' w [1. / _4Ch cartj2 I[82_ ey l suanct GRAND JULF fiUCLEAR St AT10N cxo k'(2Y _ ,,,, i44 p2 / MOTOR FAN _A53f21&LY saur no. 29 OF (o f

9. t ISD TS 3x 3 x 'l4 A=

2.57 IN

  • 2 (. 2 5)(2.15f(2.16)'

E 4 T= = 5.I99 In ?. 9 5 T 2.95

)

,T 4 Iz' I S: 3./(t IN 3 3p *c. / N

  • S F2 = S F 3 =
g. ( 3.

. 2 5). 2 5 = g3, ,_L z.5y t =.)/q" - 2 H z. = H 3 - 3. 0 in I } Cr=

l. 3'l5 itt

= 2.95 + 2.15 L Q2=Q3= 0.0 (. 25) (l.375) t 7 ( / 7 5 (. 2 5) = l. 4/ 22. 3 gy QA l.42Z(2.5% $$F2=SSF3= 2.33/ = = It 3.16 (f x.25) Q = ST AT I C A L MOMENT OF SH ADE D ARE A ABcVT N. A.

r CALCULATION SHEET M see no-HvA 6 cate no OE ID002 A-A JrE c:mNo. O PRoJECr __g133133ppi rc7 2 L!Gil COMPA.1Y ,, Jhiju d.htu&wf_ oaru/zi/82_ b sussect GP,A.' D GULF ;UCLEAR STATION cs, Jf(/ Z,,,4. ,,,, e/2ch: MOTOR FAN ALSEtiBLY sacer no 30 OF (o f 10.) T5 4 K 'l x 'l4 A = 3. 5'l I N *

2. (. 25)( 3.75) (3.75) =

f 3, f g 4,N 4 p >>. 9 5 t 3.'15 7 T2 = T 3 = 8.00 IN q / / 2 (4 0. 25). z5 = 0. 5 3 s 3 / / Sk 8 SF2 = 3F3 = 3.54 9 m v f{z= y3= Il. o I H. t= %~ Cr= 3.15(3 15) 1.815 is. z = 3.'l5 t 3.'T5 V 'l.o( 25D (I.875)1 ? Il-{5YI 7 5) = 2 G 4l ill Oz = G3= 2.33'i SSF2 = SSF3 = = = It 8.00(2(.25) e

CALCULATION SHEET %5 CALC No p S2 61 D 002 A-A HS_ cru no. 8 JOB NO. I!2I!O2-PROJECr._. fdbb BY

  • MJ MG

_. DATE .I I b

suBscC, GRA.,D GULF ljuCLEAR St ATION cm, )][d' % ~ /_m.,-

oar Mads 140 TOR FAbLASSEtiBLY ssectuo SI oF C,1 I5) Th. S E CTIO N A' x l2 l 2 b* 2.0 IN 3 3

  • r= pbd' N

v =. 307 (d. 0)65') # o./54 IN 2 V ( R E F. PG. Z. 0 -2 StoD GE TT\\ H i= Z 3 d d 0 ( G'

o. osf y gu 37 =

= 4 5('l.03'= 2.06'T IN I3= { l '? S F z = S F 3 - 0. 8 5 ( R E F. STA P. L '/ N E) nr.=it.c-113=

0. 5

CT=

0. 5" SSF 2 = SS F.B = /.50

( R E F. STA P D'( N E) f \\

CALCULATION SHEET 7645 cuc.no. os2 slDoO2 A-A J-D nEv No 8 JO B. NO. PROJECT I

  • I I!' F '#[N BY fd{.5

_ D A T E _.] I!0b Gl D CUli autLEAR Si AH011 cx020 Yo,b EUBJECT DATE M MOT _QR FAH ASSEMBLY ssEet uo 32 oF GI MEMBER R0.14)-L 4x 3x /8 3 L .nsz~ q ',_,g.. 3 4 4 3 2. z A= 2.48IN I 2-z = 132. IN4 .T -3= 3.% iN 3 4.0 6[d 37, = IO. (o (o 'l.'. / =. Sil/ (REF. SEC 2.10 BLODGE 3 z 3 bs 3.0 /d 3 = .375

  • O 0

/3 =. 3 0'T ~ T = Z /3 bd = . 3/4(d.o)(. 375[ +. So'T (3.oX.315)3= 3 . II5 f t4 SF2 - ( 3.0) (.315) =. 454 2.et8 SFs= (4.0) (.375) = . vos 2.48 d2=40IN d 3 = 3.014 C r =. 3'75 (3-07S2)2(. S'15) =. 9224 Q g_ z = 2 (4 - i.28)z (.3,73)= ,,3gy7 E a3-3 = z ssez= ^ 224 l 4 6h =

3. I'1'l

/.'12 (. 3'75) 1 3 82. (2 A 8h SSF3= 3.9 t, (. 375) = 2. 31'l

CALCULATION SHEET JoS NO. Ddh CALC NO. OSE 51D_oo2 A-A 8-B r,m No. 8 fdFS!S3!PPI F0"!ER & LIGHLCmjEliHY er di w a. 34_ o,1,,/2i/82. enonct Y

susac, GRAND GULF UUCLEAR STATION

, y,,,[ ,,,, f gp3 cxo MOT _QR_EAft_lL55R1B LY ss c o, No. 33 og ei I(p. ) T S (s x. & x. 3 b / 2 A= 7.cf 5 sN. T= 2 i.395)[5 62 5Y(5.62 5)* = 66.qq gnA

5. 6 2 5 t 5. 0 25 N

Iz = I = 40.5 IN S 2 ( 5. 6 2 5) (. 375) = 0. 531 SF2 = SF 3 = 7 95 2 ,is/ //s, Ilt= 6.0 IN. l l Y + 3g 3 3 y H 3 = 6. 0 IN. 0' t = 3 f P_ - / Cr = = 2.8l3 ret.

5. 6 2 5 + 5. G 2 5 G 2=G3=
6. 0 (l315)(2.818 t 2 ( 2.I,7.5) (.315) = 6.913 IN 3 z

SSF2. = S S F 3 = QA = 8.9:3(195) = 2,333 It 4 0. 5 (z x. 3'T5) ( 1 I I

CALCULATION SHEET JO3. NO. 9IN b _Q 5_L51DOO2 A-A,L-pacy.uO. 8 CMC. NO PROJECT fE.V' ' ' ! Y " U IU Y[i.) gy J._- D A1E __ __._ h_ ( GBLD udu-iidCLEAll Si All0ii b O. 3M_ o 1cgG/_84 sussect Cxo MOTOR F AN A51!UiBL'I saser uO.___dO F Gl

3. C ALCULATIONS a.

5 7~UDP' ASSUMPT/ON FOR BOUNDARY CONDITIONS FOR DUCT ATTACHED To PL EWUAA CHECK DUCT STIFFNESS A s s vu e t =.105(GA6E 12) use A vERAGE ~ je el b/MENSloNS c \\ l - _. _.V '4 l b = 3 0.76 ' l d = 31.13 ' ~ D L' J I = t d'[3 b + d) = (/05)[31.13)'[3(3 0.76)+ 31/3=2 092.38 b /N' l(w, = 3 ET = 3 (2 9000)(2 o 9 a.3e). a e t-9. s 3 "'" L l'10) ' As e ciu> Ton nR CHECW C1X 64 STH=FNESS P rf 1 // o a = 2 f.I25 e', e 9 I L 60.25" = 6"> L."__> I = 3. 8 6 # i N ~ ( kg(3L - to) Q * = 6(2 9000)(3 Ps5) . /5 (

  • 6El h ( 60. 25) - 1 buts)(zu2s'f l

ATl'o/A/T of LonD J

CALCULATION SHEET 9045 cate.so..CL52_1LpnO2_A-Ay-9pEv.no. B sos. no PROJECT h-IL BY DATE GRAND GULF t;UCLEAR SIMl0N c,, J 4, jM_ 041EJzd&_ sus;Ecr MOTOR FAN ASSEHBLY SH E E T No. 36 OF (, l COMPARE DUCT 70 C9 x5 + sT/FFA/ESS (7-Um 2 8 4 +. 3 3

  1. '" > / 6. 6 V'^'

(~ww teyi) 7~O CONS'/bER THE byc7 7~0 PL EA/W7) BouAldARY C ONb/7/DN A 5 F/XEb in mANsLM7/oNAL b/ rec 7/cNs will C NOT S/ GN/FKANTL. Y /MFL UEA/cE 7)~/E cal C uLA7/OA/ OF NATURAL FREQ l/ ENC Y FOK L o WER M ODE 5 e l l l l

CALCULATION SHEET JOB NO _.3_44 5 c4C No _QJ_L61D 002 A-Ay-3 pay so __b __ MISSISSIPPI POWER & LIGHT COMPANY,, _ L1/) _ gaug o,1cafjs/az enosect _ /_d o,1,fh//2__ C GRAND GULF fiUCLEAR Sl All0N [ sue;ter c,o MOTO R FAN ASSEEDLY sactr No __ 3h of_h l b. MASS MOMENTS OF INER.TIA 1. MOTOR Y z X= GgI l'- 3" _i p W = 26 8 ( UNITS OF ST AR DYNE lHPUT ARE lb IN L = h V) t* =. 5 (zG 8)(@ = (o /0 5. 4 lb-IN E Iy = I 3 = jfg W (3r2, j 2) = )(7 (26 6)(3 x (o.75* +- IS N = 80'l7.7 lb-nl 2. FAN Y 4 (W HE E L C.G. '@ s/ L ^ = l [ 3.48' W = '7). 3 ' i 10' i g AT WH E E L C. G. ; . 5 ( 'll. N ( '[ [ = (o98 'l.f i b - i N Z ( Ix= Iy=Ig= Yz (m. 9 ( 3 x 14* t to *) t 'll.3 (3.4 8) = 47 5 /. D lb iN 2 E WNERE 'Iy=T7s It FAN t VJ d

M soe no - CALCULATION SHEET 9Gl6 cuc so 23 51 DOO2 A-A A-B nEv.uo. _E _glSSISSIPPI POViER & LIGill COMPANY,, A J 4 g,,,,/is]_82. __ PROJECT b sue;Ecr GRAND GULF NUCl. EAR Sl ATION c,,g g 2 ,,,,gp2 MOTOR FAtU15SEMBLY SHEETNo. 3'l OE_!a l C. FAN O P E R AT I N Er LO A D S W H EEL WElGilT = 71. S 2 0 H. P. MOTOR FAN OPE RATING SPEED = l'/50 RPM SYSTE M LOWEST N ATUR AL F R E Q U6NC Y = LU : G(p.5 H2 ( ASWE DATA FROM McMAHON ENGINEE RING RE PORT) 'll 3 lb-Sed g= .l85 = 38(o.4 IN ASSUME FAN UN BALANCE IS EQUIVALENT TO ABOVE MASS LOC ATED Ol~ FROM CENTER OF ROTATION C

n. =

FA N O P E R AT I N G F R EQ U E NCY = l'150 x / MIN. x ar RAD = /83 2G35L Go stc I Re v. Sec RE S ULTANT C E NT RI FUG AL FORC E = M r_n.2 P = 18 5 (. oi)(/ 83. 26[ = 62. l ?> P= I wfiE R E w = GG.5 E x. Z tr = 4l1. 8 3 rad D.L. E = ( w )7 3 i D. L. F. = /*230 183.2q 2 417. 8 3 / APPLIED LOAD IN GLOBAL Y AND E E 'R ECTION S FOR STARDYNE IN PUT = Px D. L. f = (s2.13 (1. 2 3 8) = 76. 9 #2 11 @ ( FAN TO RQ U E = = 720. 3' ? 720 = RPM I"150 .. LOADS APPLIE D AT FAN WHEE L - Fy = '77. 0 F1 = - 7 7. 0 l Mx= 170. o # 1

CALCULATION SHEET sorno._ 3 bef5 cAtc no _RS?. 5 f D002 A-4,8-Q cry so _D 5lbb i A PROJECT 44 VATE M BV U

suanc, GRAND GU!.F NUCl. EAR SIAT10N c,o gg %ds

,,,d/d%2 MQT_oLEA_N_MS_EliSLY sacer no 3M OF 61 d. ALL OWA BL E STR E SSE S A. ALLOWABLE STRE SSES FOR STRUCTURAL MEMBERSNCGxf53, C. (o x 8. 2 C 4x 5.4 '7" DE E P BENT Th' S TOBE SECTIONS 3 3 3 W AND PL/\\TE ELE MENTS FOLLOW s AISC M A NUAL)'7 E'DITioN : Fy = 3(a XSI ASSUMED Fa= AAlAL ALLOWABLE STRE SS: DE PE N DE NT ON RATIO AND ASSUMlNG ALL AXlAL LOADS ARE COMPRESSIVE ( AIS C SEC. l. 5. l. 3. l) F b = BE N D l N Cv ALLOWA B L E STR E SS =. (o Fy (Aisc151.4.) Fo= SHEAR ALLOW ABLE STRE SS =.4 Fy ( AISC SEC. f.5. f.2) Fu FO R B AS E PL AT E =. '75 Fy ( Al SC SEC. l. 6. l.d. 3) B. ALLOW A BL E WELD STRE SS =.4 x FY BASE METAL e. 4 ( 36): 14. 4 ' KSl ALLOWABLE FORCE ON l" FlL LE T w/E LD = Fw = I4 4 Ny C. ALLOWABLE LOADS ON BOLTS-SEE INDlVf DUAL BOLT CALCS.

I CALCULATION SHEET som so 96 el5 cuc so RSE SIDOO2 A-A B-B nev. so B .RISSISSIPP! F0WFR R IIGm COMFJdNL av km d. sum oire '/zi/8E PROJECT ( GRAND GULF liUCLEAR SIM10i1 cxo 20 duI4s / MIL suaster oire MOTOR F AhLfLS S_EM&LY sscci so. 39 OF Gl

c. I. CHECK COM BIN ED Axl AL STRE SS AND BEN DIN G-ST RES S A.MC 6xl5.S MEMBERS (lTEM No. l)

TARE MAXlMUM FORCES AND MOME NTS FROM MEMBERS 5 70 'l t o to f4, /47 ( 14 6 0 F STA RDY N E OUTPUT: 3 Y ( r1E M.14) Pax. = elOY Mt= dflef ( M E M. (o) M3= S85~4 ( M E M. 5) MAX. = ///.5" BET W E E N BO LT S

l. 2 ( 41 5)

=,/ 7.4 Fai 18.53 Ksi ( AISC TABLE l-3Co) = PM N. I.06 ( 'fa = h . DI KSI = {yz= A l ( 2 'I S = .20 KSI 4.94 -ft,3 = W 30)= . 05 RSI 75.4 ,'3 l SINCE d .001 4 15, = = 3 .20 .05 s COM BINE D RATIO =. 001 t t =. 01 < l. 0 0. 9.. ( AlSC EQ. l. 6-7-)

21. D f j,g 1

E. C b x 8. 7_ ME M BE R S ( ITE M N O. 2) TAKE MAXIMOM FORCE S AND MOMENTS FROM MEMBERS 18 TO %3 OF STA R DY' N E OUT P UT : pax.= 11(,# ( ME M. 2 2) et= u s' M3= 1564" d MAX. = 23. 895 BETWEE N BOLTS KQ l.z (23.875) 5 9.4.. Fa 3 17.Tl Rsl = = g, .537 l l

CALCULATION SHEET 9645 cite no. osa sipoof A-A.B-B ngv.no. 8 JOB No.. i PROJECT._ MISSISSIPPI F00EP. & LIGili COMPANY k d. b d w o,1, llzl/82. er Q suo,,c, GRAND GULF I;UCLEAR STATION gj4f 2 Od OATE MOTO R FAN ASSEMBLY sattr uo.

  1. o oF (,1 fa =

=.05 KSl 2.40 fb2 =.35(1.4l) =,gfgS; . ea z. fb3=

l. 5 8 ( 3.o')

, 3(, g3; = 13.I SINCC a =,' ~.ol <. l 5, qq Co M BIN E D RATIO = 01 t ' II t =.ob 4/.O O. R. 2I. G Zl.G C. c el x 5. 4 M E M B E RS ( ITEM No. 3) TAKE M Ax l M UM FORCE S AND MOME NTS FROM MEMBERS 24 TO 26 AN D 103 OF STARDYNE OUTPUT : V 4 g P AX,. = 74 " ( ME M.109 / FIz = 118 " * (MEM.25) M3= I l b l # ( ME M. 24) d M AX. : 56' ( ACTU AL LENGrTH) Y$ I' A N fz = 6,9 4 yst. - j$O = = PraiN. . @f] '0I Fa = . 044 Ksl = I.57 Qsz = .r2(l.I26) , y gg, 313 Eb3 = l'#b (2'O . 60 KSl = 3.85 d SINCE ".64 . 01 4.I5, = = Fa 4 .ob 4 I.O O. R. CO MBINE D R ATlo =.01 + t = ,g

I M som.uom_9b & 5 CALCULATION SHEET cuc no a:Z 51DOO2 A-AM ngv.uo B PROJECT _glSSISSIUm?E G M 0fPANY ora

d. b_;2xebu o,1e _i/zikt

( GRAND GUI.F HUCl. EAR STATION A 4 4.s o,,,2zz/sa suo;rCr c,o F10 TOR fat 1_ ASS _EM_LY ssecruo 41 OF (o f D. 7 DEEP BENT d (lTEM No.4) TAXE MA&lMUM FORCE S AND MDMENTS FROM MEMBERS 31 TO 40 A N D Afi T O 5 0 OF STARDY NE OUTPUT: PAX. : % (MEM. 41) Mt = / 81 '# (MEM.31) M3 = 2707"# (ME M. 30 ) M AX. BE TWEEN SUPPORTS = I'-1 k[ = 2 /.81 )(( /. Z. (21. 8l) // 6.9 = = FMN. 57 b 2 = WHERE r MIN. = =, gg g g, .g Fa~= / 6. 'IO KSl fa = =.05 KSi ,, q 62= .16 (l. 565) =, q q g 3 g .638 hb3 = 2.'ll ( 3. 5) = . 7Z l(S I 13.244 SINCE fa.=.oS =,0o3 e,gg, Fa / B/70 44 17 CO MBINED RATl0 =. 003 t h 1 266 " b ' l U 0 N-4 4 TS 4x4x'4 MEMBERS (ITE M NO.'S 5 6, ( sz) 3 E. TS 3 x 3 x 3 TAKE MAXlMUM COMBINED AX, l A L A N D BE N D I N Cr STRESS FROM MEMBERS 101 110-112, /51 -I54 OF STARDYNE OUTPUT AND USE 3 ( ALLOW ABLE AX I AL STRESS FOR TS 3x S x '4, ITEM NO. G: KJL l.z(35 s) r=

f. i o 3 8.'7 :. Fa~ 11. 27 KSi

= l iS ACTUAL LE NGTH OF ITE M NO. 4 wHERE

M JOB NO. CALCULATION SHEET 645 cate no Q5_Z 51D001 A-A J-D_ prv.uo. B MISSISSIPPI FO'llER & LIGIH C0f,'PANY,, ct.) fag,,,, ilzl/82_ ,,,,,,c, ( GRAND GUI.F NUCLEAR STATION ff 'gm/,, ,,,, f/g/pg ,,,,c, c,, e/ 2. O F Gl MOTOR FAN ASSEM&LY succino_ MAXIMOM COMBINED AXlAL AND BENDING STRESS IS FOR MEME>E R 153 AND 15 f.l44 XSI SINCE f.lll d XS! < l'j.27 X51 ) ALL TS 3 x 3 x f4 AN D TS 4 Xi x % M E M B E RS ARE O R. FO R COM B I N ED_ A_x,l AL AN D BE N DI NCr ST RE SS X. CHECX COMBINED SHEAR STRESSE S F RO M MAXlMUM STRESS

SUMMARY

SHEET OF STARDYNE 0' T POT : M AXIMUM CO MBIN ED SHEAR STRESS = hV2 MAX. + f0B MAX. t TMAX. =. 612 +.18"T t.4 5 6 = I. 76 K51 1.2 6 KSI < 4 Fy =.4 ($6)= 14.4 R$1 0.R. ( AISC SEC. f.5. l. 2) III. C H EC K STRESS E S ON Pi ATE SE CTIO N S A-II' E2." x (o ' x 'T" ( I TEM N O. 8) TAXE MAXIMUM FORCES AND MOMENTS FROM ME M BE RS Slpl 90 TO 95 0 F STA R DYNE OUTTUT. 3 pax. = % MTo R = 13" ( NcGU Gl BLE) Fz = 70 Mr = /5'# (NEGU Gl BL E) N F3= l # (NEGLIGIBLE) M3= d5V 2" 1 xk f 5G"N G PLAT E * / P + N N l \\\\,\\ ~ ( ASSUME 2 s = ASSUME CROSS-HATCHED AREA IS E FF ECTIVE AREA FOR RESISTlNG LOADS AND APFt Y sum OF (7) FORC E S AS A SHE AR FORCE

  • CALCllLATION SHEET JOB NO.

9645 cate so-QS E S ID_Op1._A-A 8 MISSISSIPPI PO?iER & LIGilT COMPANY,, g, g,jg,B2 ctv so. gj ,,,o, c r L

suanc, GRAND GULF i;UCLEAR SI Afl0N pg gg L40IO3,_EA N_AME11BLY s cerno 4 3_.o F (o i ft =

(%t 40) /60 PSI '.l'T fSi 4 l'/.4 X5I O. R. 2 x.5 f6= A = 13(oS PSI = 13'l V.SI < 21.G KSI o.K. 5 (LR I T E M N O. 8 I S O. K. C HECX WELD CON NE C. TING ITE M NO 8 TO ITEM No. 'S 2,3, 4 el - ( A33 v MC 2" v>CLD SEG ME NT FOR CO NSERVATIS M) 2 guy,tyg=,[,o LUX = N LWZ = 2.0 x + g, SMX= (2o%=/.33 ( SME=

2. (. 5) = I. c E

=i i E2 Fz =. 0'T Fy =.l0 ( A35UtC 'N_L To V) ELD) Th =.e/b" fr = .01 du = br = t .3'TNg ',, 3 3= ,o = 3'T k N b Y.02 2 2 t 3'I R EQ ' D WELD

  • j., =. C 3" OSE Th WELD (MIN. RE C' D -

~ AI SC SE C. f. l'!. 5

8. It
  • l6"
  • I V$ A S hiV (ITEHNO.C{}

MAXIMUM fy LOAD : 'l36 AT MEMBER lob OF STARDYNE 00TPUT L ( -- l t e =.34f l 2 t w =. 20' 3 q, dvi= t,.o -2(. M 5)=. 5.31' T d bo = 1.12 -(f.w + $3: I 6G j j-192~

M soa No.- CALCULATION SHEET 9646 cuc.No. Q S7 51DOO2 A-A.B_-D. nev.uo B ., _h% /1];d o.1,_1/2d_ez _ NISSISSirPl F0i,El n :iGli, Coi.1ANY PROJECT O

susarc, GRAND GULF !!UCLEAR STAT 10N cs,yghfds

_ o,1tjzy/p 2, fdOTo &_ FAN ASS EM BLY 41! OF Q1 seter uo. FOR CON SERVATISM) ASSOME TH AT ONL'/ THE ( 1) STI F F E N E R S RE S IST Fy LOAb AS A COLT)M N - (REF.SEC.41 BLO D GE TT A N D A ISC S E C. I, /0. 5) 3 A = 7_ b S t s = 2 (/.66)(.315) = /.25 in (con S E R V ATIVE) 2 .I = 2 (.375)(l.669 =. Z8G IN 3 12 F= M0 'N l 5 /4 d w =.'l6 (5.31) = 3.9 6" ( AISC /.10. 5.1) e=

8. 3 F a ~ 2 1. 2 1 KSl

= = g f (a = . 3 5 Kbl 4 21. 21 K bl

0. V.

= l.26 BEARING STF,E SS ON STl FFE NE R S : 36 Kbl 4 4 Fy = 32.4 K31 0. K. (a lse 1. 5. t. 5.1) V= = CHECK REQUIRED SlEE OF WELD TolNING STI F F E NE RS To WEB 0 F C b x 8. 2 : Lw= H w = 4 (5.31) = 2/.24 f'r = ', _ *24=.02Nn R E Q' D WELD * '4". 00l " lUSE 0/ G" U E LD C. & '/4" x I ' fo" x 6 /8" ( I TEM No. /0) 6 MAxl MU M Fy toad = 6 0(p# AT ME M B E R 5'T OF STA R DY N E OUT P UT C ~'r' des e senr & 7 (s ruim i n n i / J = 0.c3" M 6 = /.8/" 3

r M soe no. CALCULATION SHEET 9b45 cuc no ass 51D00L.%%B-D eu no B eeoxer __ MISSISSIPPI POWER & LIGilT C0!.irAtlY,, _ _ w d. b b _ o rs 1/.2_f/e 2. ) su,ac, GRAND GULF [luCLEAR STATION .d d o,1cgt7/y2 c,o f40 TOR FAN ASSEMBL'( 45 OF (el saccr no. FOR CO N SE RVATIS M ASSUME TH AT ONLY THE (2.) 3 STlFF E N E RS RC SIST Fy LOAD AS A COLUMW: A = 2 b s ts = 2 (18l)(.2.5) =.91 #N 2 r = 2 (. 2 5) ( l. SI) =.zS gn 4 12. k= ,k, =. 52 / N. r= Je= % aw =.95( o.os) = q.99- )l* Y.1'I

1. Sb Fa ? Zl. lG K SI

= ,57 } ha=

b'( KS I 4 2 1. I G.< S I O. K.

= . clI . l F = 32.4 KSI o. K. SEA R IN G ST RE SS =.VI KSI ' Y CHEC K REQulRED SI E E O F WE LD '3O rNING STI FF E N E RS TO WEB 0 F B E NT lt. - t w = 4 h = 4 (0. 6 5) = 2 0. 5 2. S = ig"'y, =, o 2. % . 0 0 I R E Q'D wlELD = = USE ${6 NCLD

f CALCULATION SHEET 9035 cAtc NO asE5f ooo2&A,6-B arv. uo. B Joe. No gaoster __MISSISSIEELff!KR & IIG'lI COMPANY GRAND GULF [10 CLEAR SI ATION ffK/ ,,,, f/gjf, V

sussec, cx, MOTo R_EANA5S EMBLY cscer no.

4 6 0 Fll D. & V2 "n 5 i G" (I T E M N O. '1) LOADS ON i ARE NEGLIGIBLE (MA A. SHEAR FORCE = 20 ) MEMBEP lo'T OF STARDYNE OUTPUT '/2 TL i S 0.K. E. & M"x4"x4" ( lTE M NO. II) SINCE Th IS V)E LDE D To TT. S x 3x '/4 TOB E SECTl0M) JT p0ES NOT ACT INDEPENDENTLY IN RE SISTING BENDING MOMENTS l. ONLY StjEA R LOADS ACTING ON SECTIO N NEED TO BE I N VE STIGATE D : M AX. SHEAR FORCE S FROM ME MBE RS 152 AN D 153 OF STA RDYNE OUTPUT: F2 = IIS F3= /z 6' f0pr 06 Ksi = 5(H) f9 3= . O'I R Sl = 5(4) USING l.5 SHE AR SHAPE FACTOR. FOR SOLID RECTANGLE AND AD DIN G [9 2. d f03 ALGEBRAIC ALLY3 M A X. S H E A R ST R E S S = 1 5(. 0b t. 01) =. 20 Ksl 4 F e IM Ksl0.0 Yz 8'S ARE O.X. l ~ l l L 1 l 1 J

CALCULATION SHEET M sos.r.o.__1635 cnc. no. OSE 51D002 A-A E-8 crv so B eno;Ecr._MISSISSlPHfCER & tlGHi COMPANY,, da ^

d. buib4 oars //22/az.

L suanct GRAND GULF HUCLEAR stall 0N /,, / - ,,,, Magt c,, 41 OF Gl MOTOR FAIL /LSSEMBLY sHEErNO. _LV_. C H E C R REQUI R E D WELD Si1 E S A. BETWE E N C(s A8.2 AND M C (o x t6. 3 ME M B E RS A N D BETWEEN C4454 AND M C- (s x 15. 3 ME M BE RS ( I T E M N o. S 2 43 To ITE M NO. I) TARE MAXlMUM FORCES AND MOMENTS FROM ME MBERS /8)23 3 24 & Z(s OF ST A R DY N E OUTPUT AND APPLY TO StiALLE ST WELD PRO FILE - ASSOME D To BE INSIDE C 4 x 5.Y MEMBER 2. l.~ C g 6.4 I H 2 = 3.4l l LW3 = 2(l.4) = 2.8 3 + ~ 3f LwT = 6. 2 l I 4 (z x 3.4l + l 4) = /.12 -t SMZ= I 3/6,, 3 ( 3.4l t I.4 ) L 2 /.4" 1.4 (3.4i) + 3.dk = 6.*i; SM3= FoR WELD PROPERTIES

  • REF. PG.1.4-7 BLODGETT PMr = (3.41 + 2 x l.4[- I.4 (S.4 i + l.'4f= /2. (o(,

3 iz. ( 3.4 i t 2 40 Fi = 4d M i= '7'* (N E GLIG I B LE) Ft = 63* Mt" 3i8"# F3 = SI ti s =- II6/"Y A Iz = '

. 02 '/IN 3 g IIr

01 '/IN 'O = g C6 32 I* Ib .41 & (g, 4 + = 6.21 11% (o.'71 fr = 02 t 01 +.4'l* = .47NN ~ 2 41 PsE Q' D W E LD = , q =. 0 3.. . de M I N. R E Q' D W E LD IS 0. R.

s M JOB.NO. CALCULATION SHEET 9(P45 cate.uo. QS15 f Dool A-A. B-B ncy eo. 8 PROJECr._MISSISSIEELEGMR & LL0th C0t.1PANY o, Mw d. )Juh_ o,re i/zz/82. L

sunuc, GRAND GUl.F UUCl. EAR Sl ATION cso 2 %,. Z -

,,,, /jb/yz. MOTOR FA F1_AS..S E F181Y ssetr uo.

  1. 8 OF bl B. BE TWEE N BE N T PL AT E S A N D C 0 x 8.2 ( C 4 x 5.4 (frEM No.4 To No.'S 2( $

TAKE M AXIMUM FORCE S AND MOME NTS FROM MEMBERS 2'7 70 30 O F STA RDY'N E OUTPUT AND APPLY To FOLLOWIN G-v/ ELD PROFILE: r ~ C 4 x 5.4 Z! L W 2 = I/2 L W 3 : /.58 L H b = 2 (f. 6 6) = 3.1 b Y 7 LWT= 3.10 3-3 4 I SM2= l.58 =.83 1 2. SM3=

l. 5 8 (2.0) = 3. l b

-~ l# l FMr= l.58 3 + 3 x 1. 5 8 x 2.o2 = 3. 62 L F, = $95 M,= 18I' # F2= 103 Mz= 632 4 F3= 96 M3 = '7 5 6

  • Q,

.10 . I 6 (1* So/2), ,o g k i.58 3.82 to 18(I.0) fir = 3,, 9 + 3, g7 06 "/[N = [g = . IO + + =

l. I 3

[n a.,o .es

s. Iv (t = l.10 t.0 8* + l. I3
l. l 3 N

= . 0 8 R E Q' D VJ E LD = = I4.4 $lb" M IM. R EQ' 'O N E LD I S O. V. (

CALCULATION SHEET .,08 no. _ % 1 5 cate.no an sIDDo2 A-A D-R nev.No. 2> 3 eno;ter _ MISSISalkhinud'"" ""'"'"T ev MIUd*~ d- ""bd 04rc ilzz/82. L. suascer GRAnDEJLEniM.EllSIADON d 'dI-o*re-MzN1 cxo t10. TOR 1AN bMEB6LY _ sHetino. 09 OF (n l C. AT NE W TS 4 x 4 x '/4 ANb TS 3x 3 4 8/4 ME MBERS ITE M NO. 5 To ITEM No. 4 ITEM No. b To I TE M N o. S 2 A N D 'l ITEM Ho. I? To ITE M No.'5 II AND I4 TAl(E MAXlMUM FORCE S AND MOMENTS FRoP1 MEMBERS /07 /l0 3 3 iSI To /54 OF STARDYNE OUTPUT AND APPLY To ' HE FOLLOWING WELD PROFILE : LW 2 = G.0 _E_ LW3= 3.0 L -{- - 3 / v)T= 9.0 SM7= 3.0 (5.0)+ 5.0* / =105 0 2-SM3= 3.0* (2 x 3.0 + 3.0) = 4.5 ( 3" _l 3 ( 3.o, 3.c) FMI: ( 3.o + 2 x 3.0) 2 - 3.o' (3.0 t 3.0)1=24. '(5 12 ( 3.0 + 2 x 3. D) L E T C z = 2.G'/) C 3 = 2.0 To REFLECT V ALUE D m' SA ME PRO FILE AT T5 4 44A'/4 F, = 1781 M,= 1 o 5 d-i Fz = 135* Mz= 1216 1 g a F 3= 17 8 tis = 17 'l2 " C lY . Il (2.0) I ,03 /itt 'I G.o t = 2 9,,7 g l py = -j3 .,i ( 2. 5 c =,,,g s.o. 24.<15 I.29 1 22 l 79 (n

  • q_o

, o. 5 4, 5 -.54>k1 t + fr= 03 +.06 +. 54 . 55 /r1 2 2 = se REG [D WELD ' gq,q =.04" ALL '/4 ' W E LD S A R E O. R

CALCULATION SHEET M son n o. % 45 ccte no 05 2 S i p oo E A-A 8-9 nov.so. B 3 _MLSS]S]Fil PGM & !!C:l! C^"IW or dW d b>wb DATE I!22!01 pnostet ( GRAND GULF i,UCLEAi! SI All0N csokd Md-o,1c //tv/r2.- su,,,c, MOTOR FA tLASSEMBLY sster no. 50OF (o f D. BE TklE E N & '/ "x 5" x6" A N D c4 x 5.4 ( lTE M NO.'T To ITE M N o. 3) 2 TAKE MAXIMUM FORCES AND MDMENTS FROM MEMBER lo'T OF STA R DYNE 00T POT A N D APPLY To FOLLOVING WELD PROFILE : Y2 L W 3 = 5.0 LWl: 7 LW3: LWT = 10.0 6'Ok = 8 33 b SMZ= 3 t 3 -s S M3 = 4.0 (5.ob 2 0.0 2 PMr= 5.0 3 + 3 (5.o)(4.0Y = 6 0. 8 3 6

5. 0" I

i f Zb* M,= 2"# (NEGLisisLt) F= F= 20 Mt= "Tb " # 7 F= 6 # (NEGLIGIBLED M3= l'lO" 3 f1 = 5o e,+zele=ezus s = ,,.>e+ ft IS NE GLIGlBLE 'l>l" H E L D I S O. K. 1 l t

CALCULATION SHEET Hs45 CALC.wo. OS E S I D OO2 A-A.B-B cEv.so. B soa no. .#1SSISSIPPI PO'lE & i.lGII; C0f.iFANY ,, j t u g h 4 A1E il22_!st PROJECT D SUBJECT CKD DATE U MOTOR FAME 1EECLLY' SHEET No. Sl OF (_o f E. BETWEE N # '/2. x 4x4" AND 'l DEEP BENT ft (ITEM NO. Il TO ITEM Nu 4) ~ TAKE MAXIMUM FORCES AND MOMENTS FKoM MEMBERS 15%. AND 153 OF STARDYNE OUTPUT AND APPLY TC THE FoLLOWING WELD PROFILE : 2 LW2: Y2 LW S = S O l LW3=

6. 0 = LWT 3

+ 3 y SMZ=4.o[3 5.33 = S M 3 = 4. 0 ( 2. 0) = S.00 Ptir = 4.o S + 3 (4. o) (2.0)2 ;, g,, 7 j

4. D,,

(, o i I L Fi= I289* Mi= 0 Fz = 11 5 M z = 17.1 8 ' M3= 1030 "' F3= 12 8 0 (- =

  • 4.o ll-

.03 %n = 1.29

1. 2. Z l.09

.53 K/iN i = E" 8.0 5.33 8.00 2 N fr = I.032 +.0 2 + 53 2= 53/[N 53 ,4,q =. 04.. RE Q' D WELD = 3/10 W E LD I S O. K. b

M Joano__S_bd5 CALCULATION SHEET cAtc No (LS_E S i D oo2 A-Ay cre.so 8 moster _MISSISilFPi FC/.li': & ilGM. 00?.!FA iY,,I

d..bmM oire i/22/82

( GRA?;D GULF i;UCLEAR SIATION gS,2, _ ,,,, gfkda sus;ccr c,, MOTO R_EAtLASSE M D LY ssettuo 52 OF Gl I"ch ANCHOR B oLTS To FLOO R 3E. CHEC K SH E AR A ND TEN SION IN 6 TAff MAXlMVM FORC ES FROM EQUlLlBRIUM CHECK SECTioM of STARDY NE OUT POT AT NODES /8 TO 23) 276,278)(264: NODE (S) Fx. Fxz Fx 3 Fx,2, pg32 = MAX. SHEAR IS To 23 52 202 I42.# 15l N ?.'16,216

17. #

24 20 25 e 282/ fog 438' G3* /Z3" M Ax. TE NSiON = Fxz MAX. = 438 (ALL Fxz LOADS ASSdMED TENSILE) MAX. SHEAR = /51 # Y "ANCH0P BOLTS ARE TAKEN FROM Altow ASl E LOADS ON 6 FA8R COMPANY D R A W I N G N o. I)-55 52 b RE V. K, N OTE 11. ; MAXIMUM TE NSlo N LO AD = 1000* MAXIMUM SHE AR LOAV= l'/o # SINCE MAXIMVM COMPUTED TENSloN = 456 < foco I MAXIMVM Cot 1PUTE D SHEAR = 151 4 l'70 I D/8 6 ANCHOR BOLTS ARE O. L { COMPUTE BEARING STRESS: l CRITIC AL THICXN ESS FOR BE ARING IS FL ANGE OF C0x8.2,tp =.343" l Fe < l.35 Fy ( AISC SEC. l.5. 2.2) MAX SHEAR - ./5

l. l1 XS I < l.35 (56)= el 8.6 RSI O. L fp

rp x d cotr . 35/ 3 (. S'l5)

CALCULATION SHEET % 16 cs.Lc.so RSl5LDOOZ A-A B-E ncv.so. 8 soi so JSSISSIPPi fif R & IIGil! COMPMit av 1 )w d. sum OATE I!22 N PROJECT y sue,cc7 GRAUD GULF fiUCLEAR SI AT10f1 Q' 1 / ~ /4 72' c,o o it M OTO R F A N _ ASS _E11S LY sseu so 53 O F 61 V_L. CHECK SHEAR AND TENSION ON RE MAINING BOLTS -ASSUME BOLTS I/1" AND LARGER con FORM TO AISC SPECI Fic arl0 NS FOR UN FINISHED A307 BOLTS (Not4 HIGH-ST R E NGTH) : l) ALLOWABLE TENSlLE STRESS = Fr = 20 KSI

2) ALLov>ABLE LoAp JN TENSION IS BASED ON TENSlLE STRESS ARE A:

Ar = .7854 b - ( AISC SEC. l.6. 2.1) WHERE D= SDLT NOMINAL DIAMETER n= TH READS [lNC H $) ALLOW ABLE SHE AR STRE SS = F+ = 10.0 Rsl BASED ON FULL NOMIN AL A RE A //) CO M BI N E D SHE AR AND TENSloN : ( AlSC SEC. l. 6. 3) TE N Slo N STRESS f't ' 2 6. o -/4 f'+ l 3 @ BOLTS, ALLOWABLE Lo AD$ \\ ILL BE TAXE N /6 l - FOR FROM TABLE S7.) PG 8-30 0F ' MARXS' STAND AitD HANDBooX FoK MECHANICAL ENGINEERS' ASSUMING LOWEST ALLOWABLE SHEAR AND TENSILE STRE.SSES TABUL ATED) l ALLOWA BLE SH E A R LOAD = 6/D T ALLOWA BLE TE N SILE LDAD: 680 l l J F = l. 35 Fy ( AI S C S EC. f.5. 2.2) AL LO W A B LE BE A RING STRE SS= 7 t

CALCULATION SHEET Joa No. lb_45 cate.No. _QS E 5 t DOO2 A-A.E-8 asy.No. B I!22 !O2 PROJECT By Jto > DATE GRAND GULF llUCLEAR Si All0N gj _ _f2 g7, / ( sus;Ec7 c,, M OIO R FA t1_MS_E_M BLY SHEET No 54 OF bl A. YB @ BOLTS CON NECTING tiOTOR BASE AND FAN HOUSINCr TO '7 " DEEP BENT PLATE S A nom.=. 3008 IN Ar- .'7854 (.625 2 .22GO,N = FROM PGS. If-3 4 4-4 OF AISC MANUAL 3 ALLOW ABLE TEN SION LOAD = 1/. 5 2 ' X ALL oW ABLE S H E A R LO AD =- S. 0'/ TAKE M AXIMUM FORCES FROM MEM BE RS 52 6'7,0 2, G'7, 0 0 ( 7 0 3 OF STARDYNE OUTPOT: { P= Fre n = 60$ F' IM 2 Y F 3= IBB LET TO T AL S H E A R = Pz t F3 = I41 t 183= 332. ll. 52 " O. K... Fre n. = 60 Q =.lol L F= 332 =. 33 4

3. ort o((((

k R S COMBINE D SHEAR AND TENSION ' . (o f ft = 2.'70 KS = . 2% fd = = I.08 KSi ,3g g O. Y:(.. DIRECT TE NSIL

  • ft= 2.'fD 4 2 6.0 ~ l. G (l.08) = 2G. 29 YSt STRESS h=2.0 KSI codrgoLS

( BE ARING LET THICRNESS OF FAN HOUSING INLET STAND BE CRITICAL SECTION FOR BEARING t:. /345" '33 3.13 KSI d 1.35(BGh=J/8.(,KSI O.R . Fp= = . I5115 (. G 25)

M JOINO. CALCULATION SHEET % 45 cite so clsa s p coz A-A.B-g stv.uo. B MISSISSIPPI P0\\VER & LIGHT COMPANY y Mw G.) S' oire i /22/82 PROJECT ( GRAND GULF HUCLEAR STATION cxo gd %1_ / o,e/ 27Iz. suonci MOTO R FAN _ASSF,113LY ssstr uc 53 OF (o f .~. 8" BOLTS A R E O. X. Y"$ BOLTS C ON N E CTING MOTOR TO MOTOR BASE B. 2 A nori. = (.5['I[j= 19 b3 IN * / 7854 (.5 ',3*3[=1419IN z Ar = .. At LOW ABLE TENSION LOAD =. 1419 (2.0)= 2.84 AL LOW ABLE SHEAR LOAD =. llioS (10)= l.9b TAKE M AXIMUM FO RCE S FF.OM ME M BE R$ '73 To '74 O F STA RDYNE OUTPUT: P = FrcN. = 430 Fz = *t8 F3= 89 Y LE T TOTAL SHEAR = Fz t F3 = 18'l 1 FrE N. = 430 = 49

4. 2.84
0. (

Fs= 18'1# =.19 ^ e 196

0. K.

6 COMBINED SHEAR. AND TENSIDN: l .49 l Ft = .,4,,= s.~4s xSi ~ ' ' G- .91 KSi = ,3 g b -~ 3.46 XSI 4 28.0 - 1.6 (.9'N = 2(o.4 5 RSI o.X. $ktssf[.!

  • ft=

conrgots / BE ARING : THICKNESS OF MOTOR BASE IS CRITICAL SECTION =./b44" (. 5) = 2.3l KSI < l 35 ( SG') = 48. G KS I O. R. ,. Fp = .f 1

CALCULATION SHEET M JOB.NO.. 9445 CALC NO. _dh_EJ l DOOz A-Ay-B REV. NO. O MISSISElPPI F07lER & 1iG!!T C0MfANYo,. L (1. E & o.1, i/22./82 PROJECT GRAND G' LF liUCLEAR SI AfiON .8 M_.d-o 1,_ %d2 J U cxo suestC1 MQIol_EAN ASSE LBLY ssecT NO. 56 0F Gl '/ ~ $ 60LTS ARE O. K. 2 c. C. Fg % SOLTS CONNECTING MOTOR BASE To FAN HOUSING APPROXl M ATE BOLT LOADS SY FIN D I N G RE SULTANT LOADS AT N0 DES 32G To 328 AND S32. To 33tf) v)H ic H ARE C O N NE CT IO N PolNTS BETWEEN MOTOR BASE AND POWER SIDE FRANE ON FAN HOUSINC7: COMPUTE RE SULTANT C.ORNE R FORC E S FROM QUAD Fh No.'S 205 To 207 AND 2 /4 TO Zlb OF STARDYNE OUTPOT QUAD-It No. NODE Fx i(lbsh Fx z Gbs') Fx3Obs.) 205 326 04 7 i zG. 6 29 0 321 36.6 48.8 G.l Zob 32 7 3.1 -'11 8

3. 7 S28 I I. 5 90.0 11 1 2 0'{

326

24. 2

-62. G 2.4 2 14 332 -21.9 40.9 19 4 333 - f. 3

15. G

- 1. 2 215 333 / o. 3 -/G.G - 0. 2. 334 S.G $2.8 -6. 5 Elb 334

16. 6

-GN. 3 - 1. 3 TAKE MAxlMUM VALUE OF ABSOLUTE SUM OF FD8CES FOR QUAD-It 205 To Z o'T AND 214 TO 216: lEfx:l lZ Fxz l l Z Fx3l 205-217 142.3

  • 398.0 57.l # '

(r 214 -z lG 60.9 19 0 2 8. G MAK. TENSION = 57# = Fx 3 '( g3x, co3p3 pce MAX. SHE AR= lelz.3 t. 39 8T 540 ' Fxit Fx2. j gov > OF BOLT 5

I CALCULATION SHEET JOB. NO- - D CA!.C NO..D S 7_5 i D 002 A-A.@-D REV.NO. O BY - I/21/61 PROJECT __M}bb!bb!bh! OEP bb!bb!(9"bkNU oATE ( GRA3D_GJLLF NUCLEAR SI ATION Cxo 2 N M, I. - //zP/72 suB;ECT o,TE MOTOR FAN ASS _EMBLY SHEET No 57 OF bl WHILE THESE M AXlMUM LOADS ARE RE SlSTED BY (5f) BOLTS) ASS UM E O N L Y (2.) AR E E F F E CTIVE M AX. Lo ADS /goty : TENSIO N LD A D Fren.= =2Y 2 SHE AR LOAD FC = = 270 2 SINCE Fr o4.= 23 4 ALLOW ABLE TENSION = 660 4 FS= 2'l0 4 ALLOWABLE SHEAR = 5/0 ( 3/g" p BOLTS AR E O.K. 9 e I

r-CALCULATION SHEET M JOB NO. 1 96 5 cuc no 05E s t DO OZ A-Ay Rev wo B er Ih /1. bd one t/22/82 PROJECT _ MISSISSIPPI POY!FR R. Ilm!T r0rpgt _ GRAND GUI.ULUGl. EAR STATION cxo 2 D onc /dpb h sueJcci 58 oF 4f MOTOR _EAN ASSEMBLY ssett uo VLL. CHECK $ Vz x 5" >( 2'-I VZ" ANO Vi p BOLT 5, ITE M No. S IS t I4 TAKE FORCES AND MOME NTS FROM MEM BERS 1 5 2. 4 15 3 OF STARDY N E OUTPUT : Fx Fxz Fx3 Mxi tix2 Mx3 MEd.152 I2 89 l15 0 G[$ 1090'# 12 8 D 1216" 832'* W MEM.ISS 441 88 ASSUME MAXIMUM FORCES ACT ON (0 BOLT AND ' HAT MONENTS ARE S U M MED FOR Th.AND BOLT AN ALYSIS (CON SE RVATIVE) W + TE N510 N/D0LT 5 /5 n 2 = 27SI 6 _ 4 7_ SHEA R/ ggt 7 : //5 + /28 = 243 y m i-- 3 ASSUMING 'l'/i EMBED MENT' LENGTH, f 'c = #/ 000 PSI FO R FLODR SLAB 2 .. FRoti HILTI KWIK SOLT DATA, ALL W ABLE TENSIO N= 2800 O l ALLOWABLE SHE AR-2560 DOLT INTE R ACTION: + =. 84 < l.o O.R. g gog g l 1 Y " HILTI KWIK BOLTS ARE O. K. Z l M 2.z sn(d 0 CHEC K 8 ABOUT SECTION A-A: hb' $=

21.02 KSI

( g V." rt is 0. g. si Nc E f3 = 21.qz esi e. 45 Fy =. 'l5(%)- 2 7 0 Ksi, 2

i M sos.uo. CALCULATION SHEET H,45 cac so 057 SiD002 A-Ay amuo. 8 _ M{hhlhhlfff_f gl,iQ 0 l] ] @ p g _ BY Y A d-oATEI!2202 PROJECT /d2/8 h susarcr f; RAND GULE_flDCLEARSdDON cxo_b oatE MOTO R FAN ASSE MBLY SH E ET NO 59 OF (s i F. n,S et Ac e MENTS ~ MAxlMUM DISPL AC E ME NT ON E NTI RE STRUCTURE =.0063 @ NODE 2@ FROM Mc MTHON E NGINE E RING RE FORT) M AX. DIS PLACE ME NT OF motor ROTOR =. 003'73 " ALL OW ASLE DIS PL AC E ME NT OF MOTOR ROTOR =./406 " ALLOWABLE DEFLE CTION OF THE MOTOR ROTOR DOE To D E FLECTro N OF SUPPORT MEti8ERS (NOT ACCOUNTED FOR IN Mc MAHON ENGINEE RIN G REPORT) 15 EQUAL TO./40 6" O . 00373" = I% 8'7 " MAX. ROTOR D IS PL ACE ME NT =.0024'@ NODE 2'1I < / S li 8'7 " O. K. l 1 = -. -. m

CALCULATION SHEET sos so % 45 cate.uo. Q32 SlD00.7_ A-Al-B ney so. B PROJECT _ S IFPI PO?!ER & LIGHT COMPANY 8,_dtt1~(1.b2advugou, l/2zjaz GRAND GULF NUCLEAR STAIl0N g_,g i [ one/_2F/#3._ (

suestc, cxo M0191_EAN ASSEMBLY SHEET No.

(B o OF Gl 3 AN ALYSIS RESULTS

l. LOWE ST N ATUR AL FREQUE NCY OF MODI FIED STRUCTURE = G7.438 HE BRACING ADDED TO STRUCTURE E FFECTIVE LY RAISE S THE LOWEST SYSTE M N ATUR AL FREQUENCY ABOVE 33 HE To VA LI D ATE SElSMIC. EQOlVALE NT LOAD AN ALYSIS AND Mc MAHON ENGINEERING CO. REPORT
2. MAXlMUM DISPLACEMENT =.OoV5 " IN ycDIRECTION AT NODE 2.40
3. MAAlMUM CDM BINED AXl AL AND BE NDING STRESS = 2.%0 KSl (SE E MAxlMUM STRESS SUMM ARY PAGE OF STATIC ANALYSIS)
4. M AXIMUM COMBINED SHEAR STRESS = /. 30 KSl (h 2 t tN s + T)

(SEE MAXIMUM STRESS

SUMMARY

PAGE OF STATIC ANALYSIS)

5. M AXIMVM QUAD RlL ATE RAL STRESS =

138 KLI (von MISES VALUE\\ G. MAXIMUM DISPL ACE MENT AT FAN WHEEL =.00PA ~ ( N oT E FAN 5 HAFT WAS MODELED AS A RIGlD MEMBER) l l

CALCULATION SHEET M JOB.NO. HMS cate.NO. Q SE SID002 A-AK ege.No. B enoxer _ MISSISSIPPI POVIER & LIGHT COMPANY av Abd SW oire 2/Mez ( suener GRAND GULF NUCLEAR STATION,,gg g /r/n o,1 SHEET NO [01 O F (o f MOTOR FAN ASSEMBLY (SEE AP PENDIX B)

4. COMPUTER LOG I DE NTI FIC ATl0N NO.

TYPE OF ANALYSIS DESCRIPTION SDFAN50 STAric D is p. 3 toAos)STRE ssEs S DLA N WS LANCE.0S FREQUENCIES d MODE SHAPE S L g

{. -Attachment l10 to AECM-82/74 FCN-M-1137 ~ FCN-M-1138 FCN-M-1139 . FCN-M-1140-- FCN-M-1141 FCN-M-1142 FCN-M-1143-FCN-M-1144 FCN-M-1145 - FCN-M-1146 FCN-M-1147 i j FCN-M-1148 FCN-M-1149 FCN-M-1150 s. FCN-M-1151 j FCN-M-1152 j E' I I i h l i. I. 1 i i 4 1 i i ,,-,n.., -n-n,.. ,.n.v, n ._,n.,.c -,.,,-m n-- -,,-.,.,.-,,n-.. n,n,n,,. ,n- -,.,-.w.,, ,a.n,.. .e...

~ "" g/ A, CHANGE MEQUEST/ NOTICE 's 8 l esWNe Rh-M- //37-JOSNO.H45 PAGE _ l OF 2_ ,$1 N]EfrSMU OR SPEC. NO.q(.Apm.g a-La g,_g _ R EV. r TITLE 44*w aMa A4 m, ,fCPA00rfrJR CHA6 IGE / EXISTING CONOlflON lA(d h -, gc g -' o I i,m w,.. a +. m% u.~e a

m. a q pts
l. w hw -

c \\ M. a1 m c e i A. CapueW.MOUSST/3 KETCH OP NECBSAAY) l ( A 5 - au

  • 1

'.r - j supy ? I } \\ ~ [ d @j-i h\\ l OCOM PPE APPROVED PCR - SUgmelT TO PROJECT ENG.C PPE APPROVED PCM. PROCEED WITH WORK g ' j fyg PPE DISAPPROVED C l kREEAiWD BY: h.___mhk A DATE8hC7$ L PFE: 88 DATE //JL9/#4 THMiIS: DCN * } ?Ac.Itnar,3Y ENGINEERIalG -DESCRIhlON OF CHANGE - \\\\ e m eA rt ylh u TO SPEC.* REV

      • CN,

" 'v-Telecopy To GPD oEviATiOu,D

5 t

2 l R.K..o.cNIS 8.9.1 PMB ^ pga,,_,,_,__op 'A5344810 RESP. ENGR: DATE-- CHKD: \\ GROUP SUPV. DATE-i PROJECT rNGR. APPROVAL YEsO NOO 4,,,,,, ,,7, -- Lt DATE .}: pCMitGE8 Yes O NoO Cor _

ng7, i T&J Cc3. Wood sa: L. F. Dele: C. K. 84ecoy: T. E. Rooses Ple: 0080/

uffhh. 3/81 (Form No iil646-9 C) 4, g gg h)

L p. 4 I 'IIU SUPPLEMENTALSMEET 9 CHANGE REQUEST / NOTICE PAGE P OF 2 I d p r l c ] h f y F-w - Ts rs s e.m 1; &~#M*5$ .Salene'L l%atiQ.' FwTe 't (

t.. a a=

l-l

  • v D'*

j .-h.. y.. .. g' j gg d& l l lil WC ~ l

  1. 4 ~ #

_t h,. ?~ l- - f i i gg l [ 1 1 h .. /._e 5 -8 ML - W s

  • gp?.cv ~-

/ } dal f A k C. l {\\\\ er f* a Y l %~ ~ . has.ntqstlin. [i l 'j 5 / ) _1 ~ TETs4*= 'M' s 15" Jl T< T= W si3ve" son 2. K.. "W e *

  • 4 Fa ~~ < 4 Fa"...

g. -- ' 5..... t" ~ ~ ~ ~ ~E-Ste"g henat fai' VL # A'307 Sein

  • W / hts p

( } 3 M*13222. A 1/M (p.

^^ MPL* gjg CHANGE REQUEST / NOTICE g 0 car, vcht-w //3A F JOB NO. 9645 PAGE 1 OF 'E REF. DWG. OR SPEC. NO.464ar-t%-M. p-GS -l f-6-q REV. 5 TlTLE A4.h hbA.) REASON FOR CHANGE / EXISTING CONDITION l S oN. M 1,. cm m% et L.qug l A u evonoc+ to c 4-4

  • caf e.t l mo u ns w e6%

en acA voSE c e t &73 4eetR', CHANGE REQUEST / SKETCH (lF NECESSARY) h s - (3 v t \\ t-BE m ii. J. r'3 pp Q Fp nr I; 7 i, i _ a u LL .2 i;, Ge PS -e 2_ 7 j' LLMUO N,U JO3 NO. 9' : l tft!PatR

  • CD d) 7 G 0 0 ~2.- C PFE APPROVED *FCR - SUBMIT TO PROJECT ENG.O PFE APPROVED FCN PROCEED WITH WORK PFE DISAPPROVED 0

[/((f/9,g(I / DATE / /2 G 41 PREPARED Y: , WDATE t/ sepp t PFE: g ACTION BY ENGINEERIND -DESCRIPYlON OF CHANGE.. THlMS: DCN = TO DWG # REV. SCN = TO SPEC. : REV. DEVIATION : D DATE PAGE OF REMARKS 7##A/fM/7 7'O (T/8 MM7Nr/ d/lbESP. ENGR: DATE CHKD: GROUP SUPV. DATE CHIEF ENGINEER DATE PROJECT ENGR. APPROVAL YESO NOC DATE SAR CHANGES YES O NO O CDT - DATE TO: C. D. Wood cc: L. F. Date: C. K. McCoy: T. E. Reaves File: 0080/ GPD.13222 Rev. 3 81 (Form No.9645 9-C) fe e n 4 2_8 - p Ag g t f

/ SUPPLEMENTAL SHEET CHANGE REQUEST / NOTICE PAGE L OF 2 Solenoid Mountinej Rf (3 Sides + 4 W 2's'/C a6&e'Lonf 3r,d' YE = R 10'< 10" a h" W / 4 - h" O' s 5 z" d )Y \\..g weaa,A vo q; / L ong WiWi Bows (Viorw+ 4 3i344 s 5"Long, b n.nw ViL) Top e4 \\ en od shod in g p ' ' j.- I Vs" T Y P-k from T S. is nerewed 'l t. deep fee i v e* e 4 \\ces & w C Min, edge die (l'il i $ MomTain ed g T3EAN T E L]. W A '2-9//C holes fo r Vt' 6 5 2"Long x . / A 30 7 B oi t s hi / R,'e s a$g*~ ;5 ~ 3//6 V Lot _ bon ho\\es r ; 3 s \\% + 'N %4 d' 3f,'/4' vH-1 I I I T.S Ys {s Yg" s 4 QVg' 1,%-* I .g,- t + O m '.t fac side we.sa l ~Ug, t GPD-13222. A 1/78

y. ** L & Ii; A((A CHANGE REQUEST / NOTICE Q3 EO a e NQ O i onme RM-A- //39 o o JOS NO. M45 PAGE I OF 1 ,$l l fwppgesJ OR SPEC..** St-M-id*).1 -a L - 1.1 - i *REV. C TITLE QA R _t A_d. { FttR CHANGE /EX45 TING CONOITION lL.+.- h e r_%( L l( ifA p. ma---+ % c o u..- . mi - A m.a at a !I mis._4E c3 av 'at7 4 Coest G, Ii;tmes4EgemJSBT/8KETCM (IF NarsmaAaty) 7 f i ) l f 1 A3-non+- ( )a y Q~4 i 1 ) ( l 4 'f e e f. c L i 0 Vl 1 1 !NUM1D %OOEd PFE APPROVED FCR. SugtetT TO PROJECT ENG.h f PFE APPROVED FCN. PROCEED WITH WORK g PPRFPAllD BY: k... %% - m DATE f rffgL PFEt DATE /MF/fe / i j^4ryJeefff ENGINEERIN4I-DESCRI OPCHANGE.. TIKSIS: DCN * / TO DWG # _- R EV. j FROM $ 2/j gg sCn

  • t 1

[ TelecoPy To GPD 8"',

  • a

,,, o,, o

p. NoeNIS..........Eb I.-
  • ^ -

-~~ PAGE nF , jg 5 I %MASA& RESP. ENGR: DATE CHKD: . m m...._. .... w "^~ 4MF'95GINEER DATE l$ DATE

h. lO AAT&ANSE3~

Yes O NOO M-DATE i l J TCO:CCD. Weed os: L. F. Dnee: C. K. MmCoy: T. E. Rames Fly: 0080/ (l)

tWsu221Uw 3/81 (Porm No.9046 9 C)

L

m e -- .m ._e e ,.. e,. O ] Pen enm m'et- @ SUPPLEMENTALSHEET CHANGE REQUEST / NOTICE PAGE L OF L Y E.6Ef~4. 'LM'kEr avr W ;m7...-es727es007us4 I ( i y t, nr. -f Mr y.- - -- - - nc i y Il wd [fo A l y I( %=/ ,i 2"* % V. 11 35 /W + f3 ,r .= - WV \\ sides. r l p -.z p. !5 w 2rr8r_awge ivg A " \\C/ lt ,..PrAIL VIEI,1 L_..,' ( - ~,t - - .%. m a.i. tr.is c m r = ;E _ _- sg 7 3 hwten = A J Ql t a h,, _L+ m_.L nat a.A_sn... i + unh .w.m c 1.. t i l 8) ( y .ve.t.cg& tem 4 runchel i i y f*- hw:.n_mae.1K. _ 1) 1l .'SEcTioM @ ~A Te iz" tany.-. ___ _ s 15-Tii i 64 lW N alk j t I *t t , ew" ( } JL I' i 1" 'll/isf' i! MI L L OF f'\\ A n 91 M 6 I.,_, ~ 4 T.. W6 SEC.T10R i T+ __ _D=,, Myslum.o l j, !__T_ h.$ h Vd'A G"EdE{\\eng~ h b 1

4. nC= iv ~ = VC = 49**

a 2 j .3__ ._. 'E 444** Vs" r +. '4~T4144 Y4 A 6 V4" \\ cn a3 ~ l4 i 5~ ltik W8%W4 W" j 6 ' -' .._ Z-91 W 5 bases fue a Vm" W A307 Bewi WM*s s ty s N O )

i "P' # y[A CHANGE REQUEST / NOTICE O0 No O m Ftn)-A /l4O J JOB NO. 9645 PAGE I OF 1 REF. DWG. OR SPEC. NOS[pg -M,qa-Qt - t.1-(,-C REV. 5~ TITLE A 4, h SL W.bd REASON FOR CHANGE / EXISTING CONDITION lLQ %N y cgus b n, A)) g voos c % So e V4-4 Am s o l e ns,'O mav&1s$ ry h w 6% ge v uo.%'de C91171 f oc l A _ CHANGE REQUEST / SKETCH (lF NECESSARY) BE(HTfL y rr c.r p As-evtw M!?U"U /7:7P f( FEg 1 S ing ' MS[Lbh JOB NO. 96.:5 fc< 1 9 q.4 . e, l 2 WP81R

  • Q1'E 11 G O01-(

PFE APPROVED'FCR SUBMIT TO PROJECT ENG.O i PFE APPROVED FCN PROCEED WITH WORK g l PFE DISAPPROVED C h///jffig/gv DATE.2/I'// 2 PREPARED BY: % Q DATE1/fi/g t PFE: ACTION BY ENGINEERING -DESCRIPTION OF CHANGE.. THIS IS:'DCN = TO DWG # REV. SCN = TO SPEC.: REV. DEVIATION D DATE PAGE OF l REMARKS 7W4/fp/r TO GB' fr'c erT/0A/. 8/2 RESP. ENGR: DATE CHKD: l l GROUP SUPV. DATE PROJECT ENGR. APPROVAL YESO NOO CHIEF ENGINEER DATE DATE l SAR CHANGES YES O NO O CDT - DATE l TO: C. D. Wood cc: L. F. Dale; C. K. McCoy: T. E. Reaves File: 0080! GPD 13222 Rev. 3/81 (Form No.9645-9-C) [

r ~ SUPPLEMENTAL SHEET PAGE L OF 2 CHANGE REQUEST / NOTICE Exis+ing 4 6s0 Vs" : HVAC Suppor+ Q2.E77 GOO 3 H ig 4 ,/ f, 1 I i I I \\ r 36de\\ /%V H 29 Va l l ~ 14 L $g l 7 Y~ ~ - k= 1-hhh lpg, _F A 3/d-* H A PLAN VIEW lfh___y 4 7 / \\ YP.2. Piaces I 2.VZd {_~ s" ^ //6 I 4 $v" \\\\ l 1i E '2 EVg ~ 3/p;,V e% if6 4 l i, g 3/ V ^ '3V-4 16 BILI OF MATER 1 Ai.S IT E M ** DE5CRIP TION p i T S 4"i f =V+' a ct" L o n 3 1 l 2 T 5 L 3"4 V4' x 29 W Lon3 / 3 4 2"* 23 V4" x 5

  • L o n 3 4

4 2."xT4 V4" a i\\ 1/4." L on 5 2.- 9/16'# holes for v2. ' # A 30 7 6 oit.s W/ N sw 6 E 5 F i < 5 W " s V 2.* (ate %0 GPD 13222. A 1/78 i l

r MPL" /A CHANGE REQUEST / NOTICE g g 0 om, ym-n / / 4. F I0 JOB NO. 9645 PAGE I OF 1 REF. DWG. OR SPEC. NOQ(,4(_ M. Gly,p-e g. p.p.s p g REV. I TITLE $4 $.., A dd.j REASON FOR CHANGE / EXISTING CONDITION l A u% m A i c-Cm d te\\ hwe 4e t. kdd4.utha e4 %*T4t41<^ T el etMd m.m4.% a tvedk O *)_ 1 7 1 SCG S 6. nk%( ew CHANGE REQUEST / SKETCH (IF NECESSARY) E f. i.' * ' t y :- -, As-h m N W B. my c P.'0] !I i i et f ~- Jos c:o. 9m i d t WPalR

  • q q,.*t_716 M 1 C PFE APPROVED *FDR - SUBMIT TO PROJECT ENG.O PFE APPROVED FCN -PROCEED WITH WORK PFE DISAPPROVED 0

'2 @ DATE //f(/fL PFE: g/// jjg{ DATE J///g 2 PREPARED BY: ACTION BY ENGINEERl'NG -DESCRIPTION OF CHANGE.. THM IS: D6N = TO DWG = REV. SCN = TO SPEC. = REV. DEVlATION D DATE PAGE OF REMARKS 7RAA/ SMIT TO GFD FORRT/nl. dN RESP. ENGR: DATE CH;'D: GROUPSUPV. DATE PROJECT ENGR. APPROVAL YESO NOC CHIEF ENGINEER DATE DATE SAR CHANGES YES O NO O CDT - og7g TO: C. D. Wood cc: L. F. Dale; C. K. McCoy: T. E. Reaves File: 0080/ GPD 13222 Rev. 3/81 tForm No. 9645 9-C) p

F w ECM~ SUPPLEMENTAL SHEET CHANGE REQUEST / NOTICE PAGE R OF 7_ Exisi,np4*(4 a 1/O' HVACBc- / Leperts Q2. E.77 CxC O + H o t + [ll Notch' ' / deep w E' leny7 ~ Wl6V h Ag 854 I ci l 4_ 4c 4 I/29 l0 0 + 6 %lYi>c1l 4 2V+ / Solenoid Moo nkn g g % +,,, / 2 jl' I R / ., W \\ W g 1 L' 1 ~. '_ ~ ~ l' p' 3//6V a G ' 3/16V l SECTION B-B SECTION A-A q3 '/2. ' 1 hMy. 2.% 1; gl. i W. 3//6V E N ot c.h e s a s in A:eated J u -- r V2" deep A V( Len g A - - - - - - --. - -_ L} ..A e/ 3/lCo' Filici Welds in / w 3 oceas indic.aved SEC7 IOM C-C. Y2.' 3/ s BILL OF M ATERI ALS ITEh* DEsr.R T.97I.oM i g i TS 2 2< V( x 6 3/s

  • Lon 3 D

2

4. Pli < 2.'s 'l4" < \\9 7/g* Lenc3 3
4. 2"= 3" = W" x 5" Long

+ 2 - 9//C 5 bc le t ferC a %$an ' 2' '- or, E-Vf & A-237O Hs 5 IE 3 V2" s 3 '/f s I/z" ~ GPO.13222 A 1/78 t

I 'v4 MPL" y[A CHANGE REQUEST / NOTICE 0 g g . fcn).n //42 F l0 JOB NO. 9645 PAGE \\ OF

  • )

R E F. DWG. OR SPEC. NO.4[,A R-th-(ol y,l-a t - U -/f -f R EV. l TITLE S&%v Adobg REASON FOR CHANGE / EXISTING CONDITION lb%%W Ce Ah.\\ hwpc, A ad s ous-c 4- < www < 1.-, 1J

m.. s e n.

sta h m+ n a% 'r' dP R '? 7 & 015 B, ~ CHANGE REQUEST / SKETCH (IF NECESSARY) BECHi!L ce : c-o GTP-(;R lT_'Pg" g _ gg W TI910}9'M JEtssnrn% JOd NO. 9649 ge -e p Cg r 1 . g) 5 WPatR

  • Q \\ E. ~7 7G 003-0 PFE APPROVED'FCR. SUBMIT TO PROJECT ENG.O PFE APPROVED FCN. PROCEED WITH WORK PFE DISAPPROVED 0

/ h p M DATE.2./fc/FE PREPARED BY: M g DATEf//ffgL PFE: ACTION BY ENGINEERING -DESCFflPTION OF CHANGE.. THI5 IS: DCN = TO DWG = REV. SCN = TO SPEC. : REV. DEVIATION = D 7 DATE I PAGE OF REMARKS 76fpfp/r to 6/B /P>##CT/0// 8NN RESP. ENGR: DATE CHKD: GROUPSUPV. DATE PROJECT ENGR. APPROVAL YESO NOO CHIEF ENGINEER DATE DATE SAR CHANGES YES O NO O CDT -

og7, TO: C. D. Wood cc: L. F. Dale; C. K. McCoy: T. E. Reaves File: 0080/

GPD.13222 Rev. 3.81 (Form No. 9645 9 C l

r P&N~ SUPPLEMENTAL SHEET PAGE 2. OF A CHANGE REQUEST / NOTICE p-- / +e ' l' e4 f cW+ A u V l or o b I y a 4c 343 V- ?L AN VI.EW 3llbV i b 4 k+ ? ,, 7 I/4 " i -2rtz/yzg.42vy r e s 3 i 4'lq Mf 49 S"' " b~b 6 / '*/ Eds+1ng A 3'x 3'x w ( y vA c. d s[s Support Q 1177 GOO 3 HIO - g' 3//6 V 3//6 ) 5-Sectio n B-B P[ T Th,3 Ly \\ W: w.,. c. 3 5 ecM en c-c BILL OF h AT E RIALS ITE M = DEsc RI PTIoM 7Q h l l 4 2,"(2"* V# A 6"L on c I i 7 2. 4 I Yz< l % < V4" < I4 /4 " L en3 3 5 l'/2* I VZ' A V4'8 91/S Lon9 4 3 'll/V d Bot

  • het<s Fei 3 - VZ' Of A 70 7 G cit 5 5

z-R 2'd <2>t t 3/E" GPD I't??2. A It78

r l MPL# A)[ A CHANGE REQUEST / NOTICE O3 l NQ Q n ra-m- //43 JOB NO. 9645 PAGE 1 OF 1 REF. DWG. OR SPEC. MO444QM.6n.t-QS-f.1-6-C REV. C TITLE S M., RALj REASON FOR CHANGE / EXISTING CONDITION l A4 % % ;-v p, a, e t L. p g, -4 c Aaa s,u 4. nu um s.t.enesta ene.. n% g chh on o t h%gn e v Ale 77toeXG. e CHANGE REQUEST / SKETCH (IF NECESSARY) k g 'g ) F4FJlfiliiF T Bhll!!! J' ~m r

E 910 BS2 I " -*- f % *

' JLbLL bl((fLQb J DS NO. 9645 WPalR

  • CQ 2 ^4 7 3 & 001-C.

PFE APPROVED.FCR - SUBMIT TO PROJECT ENG.O PFE APPROVED FCN. PROCEED WITH WORK DATE !!,(6/F2-l/ PFE DISAPPROVED 0 ((Mg d,~ D ATE J/f/f.L / hcg,g/gg PFE: PREPARED BYh % Mig ACTION BY ENGINEER'ING -DESCFilPTION OF CHANGE.. THislS: DdN : TO DWG

  • REV.

SCN : TO SPEC.: REV. DEVIATION D DATE PAGE OF REMARKS p/grg/r yo 6pp 70# AcTNA/-[MI RESP. ENGR: DATE CHKD: 7 GROUPSUPV. DATE PROJECT ENGR. APPROVAL YESO NOO CHIEF ENGINEER DATE DATE SAR CHANGES YES O NO O CDT - og7g TO: C. D. Wood cc: L. F. Dale: C. K. McCoy: T. E. Reaves File: 0080/ GPD 13322 Hev. 3,81 (Form No.9645 9-C) g

,i / FC N V'\\ - \\ \\ % ewn No. SUPPLEMENTAL SHEET PAGE 2 _OF 1 R. CHANGE REQUEST / NOTICE /%teno:A Mod:ng $ - dy~ m-V B __ C _(7/8 y c _. --_3- _,,_ + l __. _ ( 'p2 .-..s.~ L [*~ l )1WO f7Y" WiraV B e-- / ) H - 5 74 -N b /[Er; sting +4 414"a V4 : 4-HVAC D uc t Svppoc QP_ P_7 7G OO314 2A _:1 L 3 Sides y q 37 ?- ~.e O SECTION A-A 7. n V [W% V P BILL OF MATERIALS secTron e-a ITEM

  • DESCRUl10N a

4 2" x 2."< V4" = IG J/N L o n 3 l(u]} 7 i S rs y a g e t_ m3 j & vic < r < v. s

t., A307 Bot +s W/ Nes 2-9//6 8 holec for '/i p 4

5 , R. 3 W < 3 % S/s " GPD.13222. A 1/78

r-N(A CHANGE REQUEST / NOTICE O8 MPLo sm.un-m-ll4+QO N JOB NO. 9645 PAGE l OF 3 RE F. DWG. OR SPEC. NO.%4 c MLn.t-o(- 1,1-f,. ;- REV. v TITLE f c.% hws. A QEASON FOR CHANGE / EXISTING CONDITION l AA e mW c.A,A ,e AJJ scenert +e s4T+t - eet.no.d m. o rA 3. old en ~ o ch4'n' r m 6 7 7 4 0 '3 B. CHANGE REQUEST / SKETCH (IF NECESSARY) Beat:it ? m kg_ Qv.gg MEi7il7P riU 16 jgg,? ,I se< Pays 2h u REETTTd JOa ;;O. 9b '5 h 9 lVl WPalR

  • GG7 i GCOb C PFE APPROVED.FCR - SUBMIT TO PROJECT ENG.O

{ PFE APPROVED FCN. PROCEED WITH WORK PFE DISAPPROVED 0 Y < /6 '2_ l PFE: c,[g'//,j><fg q# DATE2/p/g. PREPARED BY:hm, Ng DATE m ACTION BY ENGINEERttlG -DESCRIPTION OF CHANGE.. THi$ IS: dCN a TO DWG : REV. SCN = TO SPEC.* REV. DEVIATION = D DATE PAGE OF REMARKS 7pp/fmr yD app AR Acred.[28 RESP. ENGR: DATE CHKD: GROUPSUPV. DATE PROJECT ENGR. APPROVAL YESO NO C CHIEF ENGINEER DATE DATE SAR CHANGES YES O NO O CDT - og7g TO: C. D. Wood ec: L. F. Dale; C. K. McCoy: T. E. Reaves File: 0080/ GPD 13222 Rev. 3'81 (Form No.9645 9 C) g g @b 9 % =4. s

r FCN-I SUPPLEMENTAL SHEET PAGE L OF 3 CHANGE REQUEST / NOTICE bis tng 4 4<4's W : HVAC Suppoc + Q t E7 76@3 H \\ 5 '> p /~ A sk" h ___M g m/ 9 M M M M M M M m m _ _ _ f g'* _. l / "N '\\ - r ,c a a B NB 2 /g,, 5 g W/6V ga c o .u. 1 h CICh05Ck Ouhikh] 4A PLAN VIEW ] f 3/W ^ssa.s i 3/6" 3/l6V i e i J 6 i l6 .y y tig age i _t ~ '\\ vl Sec%n A-A i l g.e 4 g g4 Q GPD-13222. A 1/78

f i /

== o bb SUPPLEMENTAL SHEET PAGE 1 0F 5 CHANGE REQUEST / NOTICE -=aw T 7/$' [::- _2 3" _L ~T x7 s TYP /g/ Loron a-a BILL OF MATERI AL.5 l ITE.M* DESCRIPTI.ON 1 E BV2. t 3Vix Vz" 2 TS 2'x 23 V4 x IN' L ona 3 IVi.s \\VU V4 v 3 Vi L"ong 4 E. A 3//(, x 4" < 3/8 5 2-9/l6" $ hcies foi 2.- Y 2. 6 A 307 G c9 r ~1" x \\ 'e.*~ < VA 4 5

  • L o n o.

6 4 z Tlz " t 3 V." Wi(2 Totan ~ 7 E 2 1( ts i GPD .A 1/78

MPL* ys)[4 CHANGE REQUEST / NOTICE 0 d g g .. reu-A- / / 4 s F I.' JOB NO. 9645 PAGE i OF 1_ RE F. DWG. OR SPEC. NO. gpg.w(,h.1-CC- (.l-le-V REV. Q TITLE G 4 sy k\\d.,) REASON FOR CHANGE / EXISTING CONDITION l kA. %\\ te C m x % e\\ b g.ag e AM < mpp a % m% s e r ~, a

m. m m.

C,t a, _ wt t a$ e t-CR 7 4. M foo2 A. CHANGE REQUEST / SKETCH (IF NECESSARY) DtCil!'l '07 %~bU h I D [ ilIi l 9 8 7 q' rE 910 ;gj I t. -e. & A g -4t L ULE WJ$h.[-. iLbt2> x o.9ue O i 'b I V WP&tR

  • Q"2.~f 't ) ROO1-C-PFE APPROVED'FCR SUBMIT TO PROJECT ENG.O PFE APPROVED FCN - PROCEED WITH WORK PFE DISAPPROVED C PREPARED gh DATE f /pC/$'2__

PFE: [;/ g gd< M ~ DATEJ/f//4 ACTION BY ENGINEERI AG -DESCFilPTION OF CHANGE -- THfS IS: bCN TO DWG # REV. SCN = TO SPEC.: REV. DEVIATION = D DATE PAGE OF REMARKS 7)244/fM/T To G'O #4 MNA/ /NN RESP. ENGR: DATE CHKD: GROUPSUPV. DATE PROJECT ENGR. APPROVAL YESC NOC CHIEF ENGINEER DATE _ DATE SAR CHANGES YES O NO O CDT - DATE TO: C. D. Wood cc: L. F. Date: C. K. McCoy; T. E. Reaves File: 0080/ GPD.13222 Rev. 3 ~81 (Form No. 9645 9-C) -[-//h gh

i } o "~ ~ SUPPLEMENTAL SHEET PAGE 1 0F 7 CHANGE REQUEST / NOTICE E x ist ing 4 4 5 4 3/e" HV AC O v e.t Support Q2. 277G 003 H is T* rl$ J '/4 e T-- a !~ l 3' " -T 4 --y // s ' 3/( I 7 74 I [3//6V I /4 W[ M H-A, '* " ' # " "" ' S PLAN VIEW [Vg h .L - gi = I& 6 I" N 7/ " A.)'s 6 .L ><v_. TyP).3/ 6 SECTION A-A BILL O F M AT ERI A\\.5 ITEtv tL5t.RIPT10M 4 2"< f = V4 = 7 7/s" L ond5 A307 Boh s h i 2.- viv$ hotes for V a g q 3 a s w v o v r c2,.,-o c V GPD 13222. A 1/78

4 f MPLo g[ A CHANGE REQUEST / NOTICE 0 caas Ferv M- //4[. r iO JOB NO. 9645 PAGE \\ OF 1 REF. DWG. OR SPEC. NO4r,44-m.Gn t -at -1,1-L g-REV. S TITLE SeJ,.% A AAQ REASON FOR CHANGE / EXISTING CONDITION lLNe %% k

c. A to\\

h AAA emooer4 No cumm pt e ~, d ,m.ocM m ntd e em m c_4 o8e r 6 \\ "t_M G-O B "A h. CHANGE REQUEST /SKET'CH (IF NECESSARY) DEC}{IlL,, Y3 ks-Svilb O P @ 7 : ~ ' U ] ~ fy: "1 m> h u a.,,--,_ !.. _ lf Ii-- sm py 2_ =. tm ': s. ;o. 95.:5 @,\\ WP&tR * $ \\ 17 310 0 T - C PFE APPROVED *FCR. SUBMIT TO PROJECT ENG. O PFE APPROVED FCN. PROCEED WITH WORK g PFE DISAPPROVED 0 PREPARED BY: h%@sDATE I/s q)6b PFE:,pfif g p, 4 D ATE 2/9/g 3 ACTION BY ENGINEERING -DESCRIPTION OF CHANGE.. T$$IS: DCN = TO DWG = REV. ( SCN x TO SPEC. = REV. DEVI ATION : D DATE PAGE OF REMARKS 7)CC#f/))/T 7b SFB #d8 Af7M dhM RESP. ENGR: DATE CHKD: GROUPSUPV. DATE CHIEF ENGINEER DATE PROJECT ENGR. APPROVAL YESO NOO DATE SAR CHANGES YES O NO O CDT - og7g TO: C. D. Wood cc: L. F. Date: C. K. McCoy: T. E. Reaves File: 0080/ GPD 13222 Rev. 3'81 (Form No. 9645 9 C) /7)-// S < <- w.a % kg

.i SUPPLEMENTAL SHEET CHANGE REQUEST / NOTICE PAGE L OF 7.L E 'ir %3 4 4'54's3/8' HvAC ,/Support o1277 Goo 3 H 03 9 s' y / - ~ G3 6 l 3//6V ~ ~ 2 V[ Ak l h gV 4 3siad3jg (y ,3 5\\ des f wV\\ 5+ -c,,a tb-u,,3 W \\16 4 s, f LAM VIEW 'h i l YA 4 _3/1/ \\" I

4. t

.W ~ h h y h t \\Yh

  • Vd Q e gg p A gp Yf w w s p s e <.n s _ _.1
E

~ in P te. v.. w W/ 2'

- -%_ g gg Gr 5,

H ",c

  • c "' - '

b hin' C boi

  • tom c - E a-I care 3 )4xi w,A q
  • J*2 %

Se ct 'o n A - A 04-*S3i.s4% do. + l 3/8 h o*

  • or c 4 Sc\\ mod R,

~ r~ 3 '= +'5//i W l S e c % vs m Ese - < :p o cR BILL OF M ATERIM_5 1 T_E M " BESC.RT_ PRON TS 3i 3"x V4' x *P/8" Lon3 i E-M 2 'T 2 *x VC x 3 '% L o n S 3 f? 4 5 5//c, x 5 ' K i l 4 2-9/t v G bo\\es For 2. '/2." # A 3 0 7 Be a s. l 5 4 z " s l '/v s yv s s " L o n g 6 [Q, 3'sE1 3'I O 'IC (7. % % Q - l GPD 13222 A 1/78 1 l

F MPL0 g CHANGE REQUEST / NOTICE OE No O m rw-~ //91 JOB NO. 9645 PAGE OF 1 R E F. DWG. OR SPEC. NO.46A8; P~lsh.) - CS - f.I-(,- ( REV. 5 TITLE <mc a y Aag mt REASON FOR CHANGE / EXISTING CONDITION l A th e,,n %,\\ N ,,e b ald < o PD a rk bo S M LE *

  • falw ell mounties alava on, ach A c Q \\ W Coo 't_ tt CHANGE REQUEST / SKETCH (IF NECESSARY)

BECHTIL 7 ;~ 7@IPj5i OW k5-D v i\\ b 13 1 6 M 7 ![31.9 U Ua 2 N+ pag e .i'J+ c40. 9545 s 0 ) L6 WPalRh Q\\E'1T GOON ~C PFE APPROVE 0L FCR. SUBMIT TO PROJECT ENG.O PFE APPROVED FCN PROCEED WITH WORK (g>l J['[/h PFE DISAPPROVED 0 PREPARED BY: b.. Qg DATE ^/t(/G 2_. PFE: [ d g g /u DATES _/,f/yL ACTION BY ENGINcERING -DESCRlhTION OF CHANGE.. T>flS IS:' DCN a TO DWG 2 REV. SCN = TO SPEC.

  • REV.

DEVIATION = D DATE PAGE OF REMARKS 7F4NfW/T Tb 68# #04 ACTNA/./IN RESP, ENGR: DATE CHKD: GROUPSUPV. DATE PROJECT ENGR. APPROVAL YESO NOC CHIEF ENGINEER DATE DATE SAR CHANGES YES O NO O CDT -

g37, TO: C. D. Wood cc.

. F. Date: C. K. McCoy: T. E. Reaves File: 0080/ GPD 13222 Rev. 3/81 (Form No.9645 9 C)

F ., s FC N OWN-No.Y\\ ~ ll 47 SUPPLEMENTAL SHEET PAGE 1 0F 1 Exis+ ;o 4 3"<3'i Ys' BVK CHANGE REQUEST / NOTICE Support ole 77 Goo 4HlO B ill e4 R a w nis / y y (3 5;Jes T.t. e m" be se r t p+:e n a 4

  • l 1

'e ei d i TS 6L Wi73/$ 3o l l 6%' Move % IV a

x. t volyE,04 rf I

3 9.4" c"< 3/g", 4 4 2 "x Iv2."< ri cs v ' I I " J[ 7//b 5 2-9//v @ i .__. ]Y " _r hol e s G et 2.- l._I. 8 YrpA3o? I li ~y *' btts W/ bj i f \\A iib Ns A A e e vorov, C E b*

  • U PLAN VElW 35iaes) g g

] \\ \\ Notch 3//6' TyP I lVi6/ \\ Av ps \\vgup \\ ? \\ l i / \\ / \\ l 6 W: g T.. i i, al I I i 2"d Yi,O 1 I WA l I er T I h 3' V (' 1M sa%v-t Sec_ % o A-A GPO-13222-A 1/78 1

MPL= pl4 CHANGE REQUEST / NOTICE YgIl.. 0 n.n~-nnu JOB NO. 9645 PAGE I OF 1 RE F. DWG. OR SPEC. NO.1/,4f-A-61). C-t/f 1, t- /,.( REV. C TlTLE fahs., R Ag a/ REASON FOR CHANGE / EXISTING CONDITION l A o%e. (o sho( hm ,. g A 14 s -o sa A An r4 r&4* n <dwr,7) mooa. c ( h,3 m a d o&%e/ '/D 1 W Cee1.0 CHANGE REQUEST / SKETCH (IF NECESSARY) EEC lli! E ~' L_ r r B 16 isE', hs - B vi W U85Lra r Trr: lbLt. ru, m .lO ' c C. 9S ' 5 few p%< L O l \\ v WPalR # Q 1*t-1 T G Go 4 -( PFE APPROVED FCR. SUBMIT TO PROJECT ENG.O PFE APPROVED FCN. PROCEED WITH WORK Q PFE DISAPPROVED 0 I PREPARED M g DATE // ( / f L PFE: gp DATE.2//d/E L ACTION BY ENGINEERING -DESCR'IPTION OF CHANGE.. THl(IS: DCN TO DWG : REV. SCN 2 TO SPEC.: REV. DEVI ATION # D DATE PAGE OF REMARKS fpjNrm/7 To ApD fo# NT/oA/ 8/l[ RESP. ENGR: DATE CHKD: GROUPSUPV. -DATE ROJECT MGR. AMON WC C CHIEF ENGINEER DATE DATE SAR CHANGES YES O NO O CDT - og7g TO: C. D. P%od cc: L. F. Dale; C. K. McCoy T. E. Reaves File: 0080/ GPD.13222 Rev..,!81 tForm No. 9645 9.C) N, e

I 1 s. SUPPLEMENTAL SHEET PAGE 1 0F 1 CHANGE REQUEST / NOTICE

gy Q sia-s 3Sas\\

1 \\, ~ 2 l%V ~ s< / y4 y q H-l'/f-*l p ik k.. @.* .__ m ^ +3 .., a y PLAM Y1Ebl T[~~ rglr i I l l ig! i gi at!__ l i a gg u 4'41 ,d I I I 41 A 2ili l l l l \\} I/z. & ro ut n Secfion A-A BILt. OF MATERI. ALS ITEh* bEscRIPT10% i E 8"t E't 1/ 2 hl/ 4-ViG hiWi bei&s 6 '/ :. Lor. 2 T S 3 x 3 o t/4 s %" Long 3

4. lt 2."x V4' x A L on g

{g 4 ..R.+"4(o"<3/$" s z-w g so m e 2-yc e s w > e,1 s V GPD-13222 A 1/78

MPLe /\\> / /3 CHANGE REQUEST / NOTICE OA NQ O WF,cro-m //49 s JOB NO. 9645 PAGE I OF2 j R E F. DWG. OR SPEC. NO.gq. n g,n,q. og. f,, - r,. g REV. C TITLE S%444, A 4\\d 4J REASON FOR CHANGE / EXISTING CONDITION l kube C. A ee\\ hwwiut( A1J racooM +o su h u/ ~ ;J m,,. mu ~ c ra., ,n o cw%', ' m t-7 7 T-oo3 A. CHANGE REQUEST / SKETCH (IF NECESSARY) CillI T!,

o M2.U_Ii]E 3 ks-G vi \\b I$ FiJ c!.1962 uth8MT[TL g

g{1 JO3 NO. 9645 B W P alR * @ g 6 "I l G O O 4 ' C PFE APPROVED FCR - SUBMIT TO PROJECT ENG.O f PFE APPROVED FCN PROCEED WITH WORK g PFE DISAPPROVED 0 PREPARE ,{ Q ATE I//f/ g y PFE: h M 4 _ J _ D ATE.2./g/p ACTION BY ENGINEERIN'G -DESCRIPflON OF CHANGE.. TFff$ IS: DdN TO DWG # REV. SCN = TO SPEC. = REV. DEVI ATION : D DATE PAGE OF REMARKS 7Lwrm/r 73 <pg 70/2 Ac77M/.8AN RESP. ENGR: DATE CHKD: GROUPSUPV. DATE CHIEF ENGINEER DATE PROJECT ENGR. APPROVAL YESO NOO DATE SAR CHANGES YES O NO C CDT - DATE TO: C. D. Wood cc: L. F. Date: C. K. McCoy: T. E. Reaves File: 0080/ GPD 13222 Rev. 3/81 (Form No.9645 9 C) h t 1. hO %3 A g- - ~ ~ ~ -

%N-en/NNo.W-\\\\A9 SUPPLEMENTAL SHEET PAGE_2 OF 3 CHANGE REQUEST / NOTICE / FuttLenSth 3 Staes

  • N W" V N ~2" on he Ma c a>

4 ~ ~ ~~ ~ ~ - - - - Eiis u C 6= lo 5 of 3" HVAC Sued 4R\\G.4 r., 3"

O i( syg_ _ _ _ _ _ _

ort Qiz77G o N e


m Ip,_

15 W l I; i ~ 3/isV.. See be&ad _L o O A ^ T vs A DE T All PLAM. VIEW -N & o-> Soienoid Mouni-inn Ne \\' N' ~ 4!l { gay (.y ll l h ' 4 4.. i 11,.r_ yf' i. ,C F-ati_ JL rh %q j 2 -- f ", p- - - 2%'~'r ~ T \\ L7F 3 5 des ) Sec%on A-A \\,-3j$7y y c Pia m nQ) gPD-13222. A 1/78 3T* h4Ak T4g4

ScW-SUPPLEMENTAL SHEET CHANGE REQUEST / NOTICE PAGE 3 OF S I TYP %,/\\ p ._. p._ # ^ \\ TyP

i. i i

/ %/ :y ' o ' i i l I [T o l l L_ 'i. O i i I I L i, ll f-15/6 i i I n-- 11 Sec h B-B Bill of F\\et e.viais T5k'**Yld/NEion3 1 TS 3 437 V4 w \\ciYe sonk' ion 3 2 TS26Zh*Ve"5% 3 4 E, 4" < 3 " < %" (4 +e *4 5 9/108 hae s fo r YzG A307 Bolts W/ N v+s ('4 +ve9 6 E 2 ' 7 P." 5.1/s' ( 2. *o9an 2 gl 4V GPD 13222 A 1/78

P MPL* gj$ CHANGE REQUEST / NOTICE .O . cama FYrv-m~ M6 V s JOB NO. 9645 PAGE 1 OF "L RE F. DWG. OR S*EC. NO.9p C./%# y,f-Qs. #,e rREV. i~ TITLE Shh hk4 ) REASON FOR CHANGE / EXISTING CONDITION l h u%e Ce nN g e\\ h,g e c A>J mmem-e+

  • e r.t*4r e

- 4

  • t,\\

mammste. et.A em a&Me d ?_ l'15 & o o t A. CHANGE REQUEST / SKETCH (IF NECESSARY) U HI:t S Q Y l'._"_,z*_p ? I ifhgrg(3(f[.i.f 10 As.- ht w n. ;o. 93.15 $ee Pacg# 1 O \\ l V b1'P&lR

  • Q 2.E 11 Cs O O A-C-PFE APPROVED.FCR - SUBMIT TO PROJECT ENG.O PFE APPROVED FCN. PROCEED WITH WORK PFE DISAPPROVED C I

PREPARED BY: aQWDATE //(/gn PFE: [ // h DATE 2./s/g.z ACTION BY ENGINEERidG -DESCRIPilON OF CHANGE.. THl3 IS: DCN : TO DWG : REV. SCN = TO SPEC. : REV. DEVIATION D DATE PAGE OF REMARKS r#4A//p7/r TO 6pO fog ACT/OA/. 8 k RESP. ENGR: DATE CHKD: GROUPSUPV. DATE PROJECT ENGR. APPROVAL YESC NOC CHIEF ENGINEER DATE DATE SAR CHANGES YES O NO O CDT - og7g TO: C. D. Wood cc: L. F. Dale; C. K. McCoy: T. E. Reaves File: 0080/ GPD 13222 Rev. 3!81 ! Form No.9645-9 Cl y k

SC N-SWN-No. f'\\- \\\\ 5O SUPPLEMENTAL SHEET CHANGE REQUEST / NOTICE PAGE L OF 1 E x is+ ng e S~ 5 'a 3/e' MyA C / L+ suppor- 02.E 77G OM E.\\S S Q\\ R,, ,1 g m L _fg (9 - -- - - ~- v s x ~ i yf " ~ 3A6 l -- i.g 3/ieV /

2. %..

3 S ides 3/16V\\ ( EB V8" )ote.noia noon +,ng a 3 g4 44 l PLAN VIEW gA 3hGV y _ + 'l 1, vz" y g ~ %,, 6" + iti + rr i i i g I III l l O I g l Ji 4Y. l! 2 i _mA_ 1 / Sec m nA-A -gy 3 3 Sid es b+s O rnm.a for Clarity l l eILL of M A T E RT. ALS O I TE M

  • DESCRIPT\\0M t

T S 4W'a Yd s 6 7/8" L o n 3 a TS3 @ V4 5 % Vf' L o n 3 3

4. 2" A 2/ < W < 2.'/f L o n 3 4
1. 4" < 3 Yi' 3/9 '

5 4 E W2."

  • F4 ~ 4 5 " L o n 3 6

E 4vi*e9tvVg" 7 E - 9//(,*' 6 holes foi P - A-307 Bot &s b4 / M v 4S GPD 13222-A 1/78

_6 MPL# M/6 CHANGE REQUEST / NOTICE O2 -eft /Ne F/ Na M - M / o O N ~ 6' JOB NO. 9645 PAGE / OF + 2 % tt R EF. DWG. OR SPEC. NO.9/,40-/M-g3n,l-ch t,f-if. REV. l TITLE.64 (% Lhb d REASON FOR CHANGE / EXISTING CONDITION lAae mM e Gm% ee\\ % bd i aA) Der b As f AMa n y Mennbd N u n4) q o(d # og a t.4 C d e,O Q O D f0 M b CHANGE REQUEST / SKETCH (IF NECESSARY) B? tl':, f6)EEp~~~m n 7 SEE PAGE 2 /j)) --. -4j,, i. l7 2~ i. U. 9.'. 4,- 7, 1 \\ " .O WP&lR* $ g g 3 % (3 e CW L PFE APPROVED'FCR - SUBMIT TO PROJE NG PFE APPROVED FCN - PROCEED WITH V!ORK PFE DlS PR VED 0 PREPARED Y:6 Q DATE I//(/p2. PFE:, / /[p g',_ DATE //,2i/f,,1 ACTION BY ENGINEERISG -DESCRIPTION OF CHANGE.. TFWSIS: dCN = TO DWG : REV. SCN = TO SPEC.: REV. DEVIATION O DATE PAGE OF REMARKS //MNfr/7 70 6#P /OR #7704). YkESP. ENGR: DATE CHKD: GROUPSUPV. DATE CHIEF ENGINEER DATE PROJECT ENGR. APPROVAL YESO NOO DATE SAR CHANGES YES O NO O CDT - DATE TO: C. D. Wood cc: L. F. Dale; C. K. McCoy: T. E. Reaves File: 0080/ GPD-13222 Rev. 3 81 (Form No.9645-9-C) ~

.I = I ~ SUPPLEMENTAL SHEET PAGE 2. OF 2. CHANGE REQUEST / NOTICE EXIST)NG A 3ha 3hsV3 LOE\\TODiM AL BRAC::.. TOPS wkMGER Qiz77 T S 3 3. vi sGh" Jr -GOO 4 BOG 9//cG HOLES roR l' i" "" b*7~~Op"E ' " '4'3W W" & 4a.oNC4 I' A307 - }-

BOLTS-]O

~ f qfs c-W/N UTS ,x_, /. W / 950LEMO\\D MouMT\\MG PLNTE <a iv %" a 7" L ONG W / '/z" e NOTCHED FROF\\ ROR120NT AL L.EG F OR 2%" FRov\\ E A S T EDGE. PLAN V EW .-/, i / % ) %V, _[ li alie V l sI i, 3f,, y j'

  1. fMR. 3"a3 Vi A5 ST \\9TEMER l

-./4 ? O D GPD 13222. A 1/78 \\

T MPL" A CHANGE REQUEST / NOTICE .0 cam, te e m- //Fa F JOB NO. 9645 PAGE 1 OF' 1 REF. DWG. OR SPEC. NOOg.m.gn,t.er -l A -11. } REV. I TITLE $a&a4v R +\\d d REASON FOR CHANGE / EXISTING CONDITION [ 6%e %%1 e Ca A e e\\ \\o .g (. A AA e u np at b h e C4A *

  • hl mA m u d,%.

ohk ew a cAeo Ar Q *2_1 M (-615 A. CHANGE REQUEST / SKETCH (IF NECESSARY) Ci. !! ?, &{f}il.i~ T'.7 -...- ; D U3 t E]g82 ks-8ol\\V U E L 5 M "[I'[ j ' Q Jos No. 9a5 $ce b 1 ff ,W WPalR * @M 11 (i 0d+ C PFE APPROVEU FCR - SUBMIT TO PROJECT ENG.O PFE APPROVED FCN - PROCEED WITH WORK g PFE DISAPPROVED 0 PREPARED Y: 6 Q4 DATE 8//ffg L PFE: [ g [ DATE p/;r/p2 ACTION BY ENGINEERihG -DESchlPTION OF CHANGE.. T 4 IS: D64 = TO DWG : REV. SCN = l TO SPEC. : REV. DEVIATION : O DATE PAGE OF REMARKS 764A/fM/T 70 6PB FO/' ACT/oA/.[ hESP. ENGR: DATE CHKD: GROUPSUPV. DATE PROJECT ENGR. APPROVAL YESO NOC CHIEF ENGINEER DATE DATE SAR CHANGES YES O NO O CDT -

og7, TO: C. D. Wood cc: L. F. Dale; C. K. McCoy: T. E. Reaves File: 0080/

GPD.13222 Rev. 3'81 (Form No. 9645 9 C) / h 'e e f\\ -4. A i $T / v

I .I 4 VC f\\)- SUPPLEMENTAL SHEET CHANGE REQUEST / NOTICE PAGE ~2-O F "2 / b v c + 3 3i = 3'il a '/ E. H V A C Lisin 4 5vppec & C2. E 7 7 G 00 t R 12. 7 7*" A 'v-m m N /~ 3/ic,g 44 e,, i g, \\Y1 g NI6V SK" -1: V Q 2~ - (ri) D g (3 Staes ld g)~~ 4 A ? d x , ;,t;,fg,, 1/6 9 " 2 A / seenosa noumu3 al PLAN VIEW 3E>-. \\u ge" N/6 k. p"N4 l O ~ i y2 m 1/g"% 3/4" 4]s sesion B-B seeion MA Bi\\\\ of Maie.rio\\s I.+ e m" De sc ri phon 4 f x 2, x W"

  • 1 O Yt" L e n3 i

2.

4. \\ %"-( \\'di t V4" = 5 V " Lon3 g

t 3 R. 4" ( 4 <'1/g " c3 4 2" n L Vt s V+" A 1" L o n 3 5 3' 4 3" x 3/8" G 2-4// F p h ole s for A 307 Gol+s W/Nv% GPD-13222 A 1/78 - -}}