Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- LR-N12-0124, Salem Generating Station, Units 1 and 2 - Final Supplemental Response to Generic Letter 2004-02 + (09:04:28, 18 September 2018)
- CP-201200347, Comanche Peak, Units 1 and 2, Enclosure 1 to TXX-12061, 2011 Radioactive Effluent Release Report + (09:08:04, 18 September 2018)
- CP-201200347, Comanche Peak, Units 1 and 2, Transmittal of Year 2011 Radioactive Effluent Release Report + (09:08:10, 18 September 2018)
- CP-201200034, Comanche Peak, Units 1 and 2, Submittal of the Annual Non-Radiological Environmental Operating Report for 2011 + (09:09:09, 18 September 2018)
- DCL-12-041, Diablo Canyon Units 1 and 2, 2011 Annual Radiological Environmental Operating Report + (09:10:07, 18 September 2018)
- LR-N12-0121, Salem and Hope Creek - 2011 Annual Radioactive Effluent Release Report + (09:26:36, 18 September 2018)
- TAC:ME8461 + (09:36:49, 18 September 2018)
- ULNRC-05855, Callaway, Unit 1, Response to NRC Request for Information 10 CFR 50.55a Request: Proposed Alternative to ASME OM Code Replacement Interval for Main Steam Isolation Valve Actuator Rupture Disks + (09:40:45, 18 September 2018)
- RA-12-017, Brunswick, Units 1 & 2, Crystal River, Unit 3, Shearon Harris, Unit 1, H.B. Robinson, Unit 2, Carolina Power & Light Company and Florida Power Corporation'S 30-Day Response to March 12, 2012, Information Request + (09:49:47, 18 September 2018)
- NL-12-024, Indian Point Unit 2, Technical Specification 5.6.7 - IP2 Steam Generator Tube Inspection Report - Spring 2012 Refueling Outage + (09:55:47, 18 September 2018)
- NEI 99-04, McGuire Nuclear Station, Units 1 and 2 - Annual Commitment Change Report + (09:58:02, 18 September 2018)
- L-2012-159, St. Lucie, Unit 1, Response to NRC Nuclear Performance and Code Review Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request + (09:59:53, 18 September 2018)
- TAC:LA0233 + (11:14:20, 18 September 2018)
- RS-12-037, Braidwood, Unit 2, and Byron, Unit 2, Response to Request for Information Regarding Thermal Conductivity Degradation and 10 CFR 50.46 Report + (11:26:07, 18 September 2018)
- L-2012-080, St. Lucie, Units 1 and 2, Submittal of 2011 Annual Radioactive Effluent Release Report + (11:36:03, 18 September 2018)
- NRC-12-0012, Updated Fermi 1 Groundwater Monitoring Data + (11:36:40, 18 September 2018)
- TAC:ME8144 + (11:38:20, 18 September 2018)
- L-2012-072, St. Lucie, Unit 1 - Response to Request for Additional Information Identified During Audit of the Safety Analyses Calculations for the Extended Power Uprate License Amendment Request + (11:42:21, 18 September 2018)
- NL-12-029, Indian Point Unit 3, Proposed License Amendment to Allow Use of the Backup Spent Fuel Pool Cooling System While the Spent Fuel Pool Cooling System Is Out of Service + (11:46:05, 18 September 2018)
- ENS 53585 + (12:01:04, 18 September 2018)
- ENS 53588 + (12:01:09, 18 September 2018)
- ENS 53591 + (12:01:11, 18 September 2018)
- TAC:ME5104 + (12:09:02, 18 September 2018)
- NL-12-0242, Joseph M. Farley Nuclear Plant - Unit 2 Refueling Outage 2R21 Inservice Inspection Report + (12:15:44, 18 September 2018)
- NL-12-032, Indian Point Nuclear Generating Unit Nos. 1, 2 & 3 - Correction to Previous Response Regarding Unit 1 Buried Piping + (12:24:17, 18 September 2018)
- TAC:ME5748 + (12:55:14, 18 September 2018)
- LR-N11-0366, Letter from Pseg Nuclear, Transmittal of Core Operating Limits Report, Reload 16, Cycle 17, Revision 5 + (14:13:27, 18 September 2018)
- RS-11-178, Quad Cities, Units 1 & 2, Registration of Use of Casks to Store Spent Fuel + (14:14:29, 18 September 2018)
- RS-11-180, Quad Cities, Unit 2 - Request for Technical Specification Change for Safety Limit Minimum Critical Power Ratio + (14:29:40, 18 September 2018)
- NG-11-0256, Ltr 11/16/11 Duane Arnold Energy Center Confirmation of License Exam + (14:31:29, 18 September 2018)
- RS-11-110, Ltr. 11/16/11 Braidwood Confirmation of Operator License Exam + (14:31:38, 18 September 2018)
- NL-11-1812, Edwin I. Hatch, Unit 2 - 2011 Updated Final Safety Analysis Report, Revision 29, Chapter 6, Engineered Safety Features Through Chapter 7, Instrumentation and Control + (14:35:34, 18 September 2018)
- NL-11-1812, Edwin I. Hatch, Units 1 and 2, Updated Final Safety Analysis Report, Fire Hazards Analysis Changes, Technical Specification Bases Changes, Technical Requirements Manual Changes, 10 CFR 50.59 Report, and Revised NRC Commitments Report + (14:35:38, 18 September 2018)
- Contraband + (14:48:27, 18 September 2018)
- DCL-11-104, Diablo Canyon Units 1 and 2, License Amendment Request 11-07 Process Protection System Replacement + (15:01:02, 18 September 2018)
- ULNRC-05774, Callaway Plant Unit 1, (Ldcn 11-0010) New Technical Specification 3.7.20 + (15:04:40, 18 September 2018)
- L-2011-471, St. Lucie, Unit 1, Information Regarding CVCS Malfunction Provided in Support of the Extended Power Uprate License Amendment Request + (15:06:31, 18 September 2018)
- L-2011-418, St. Lucie, Unit 1, Response to Non-Proprietary NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request + (15:08:33, 18 September 2018)
- RS-11-167, Calvert Cliffs, Units 1 & 2, ISFSI, Nine Mile Point, Units 1 & 2, R.E. Ginna Nuclear, ISFSI - Submittal of Exelon Proxy Material Related to Application for Approval of Indirect Control of Licenses + (15:09:27, 18 September 2018)
- DCL-11-072, LAR-11-006 - Revision to Technical Specification 3.3.5. Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation + (15:21:47, 18 September 2018)
- NG-11-0171, 2011 DAEC Initial Examination Proposed Exam Files + (15:36:09, 18 September 2018)
- L-2011-434, St. Lucie Plant, Unit 2 - Response to NRC Request for Additional Information (RAI) Re Extending Power Uprate License Amendment Request + (15:48:45, 18 September 2018)
- GEH Hitachi + (15:51:36, 18 September 2018)
- RA-11-025, Response to Request for Additional Information Regarding Application for NRC Consent to Indirect License Transfer for the Proposed Merger of Duke Energy Corporation and Progress Energy Inc + (17:21:37, 18 September 2018)
- IR 05000445/2011006 + (17:22:32, 18 September 2018)
- L-2011-342, St. Lucie, Unit 1 - Response to Nuclear Performance and Code Review Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request + (17:50:05, 18 September 2018)
- ULNRC-05781, Callaway Plant, Unit 1 - Request for License Amendment to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) (License Amendment Request Ldcn 11-0012) + (17:53:13, 18 September 2018)
- CP-201101065, Comanche Peak Units 1 & 2 Final Safety Analysis Report (Fsar), Amendment 104, Technical Specifications Bases + (17:56:02, 18 September 2018)
- CP-201101065, Comanche Peak Units 1 & 2, Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 104 + (17:56:08, 18 September 2018)
- L-2011-311, St. Lucie, Unit 1 - Information Regarding Steam Generator Tube Rupture Steam Release and Margin to Overfill Provided in Support of the Extended Power Uprate License Amendment Request + (18:16:43, 18 September 2018)
- NEI 99-04, Oyster Creek - Submittal of Commitment Change Summary Report - 2010 + (18:22:18, 18 September 2018)