L-2011-311, St. Lucie, Unit 1 - Information Regarding Steam Generator Tube Rupture Steam Release and Margin to Overfill Provided in Support of the Extended Power Uprate License Amendment Request

From kanterella
Jump to navigation Jump to search
St. Lucie, Unit 1 - Information Regarding Steam Generator Tube Rupture Steam Release and Margin to Overfill Provided in Support of the Extended Power Uprate License Amendment Request
ML11231A946
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 08/18/2011
From: Anderson R L
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2011-311
Download: ML11231A946 (2)


Text

0Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 FPlL August 18, 2011 L-2011-311 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Re: St. Lucie Plant Unit 1 Docket No. 50-335 Renewed Facility Operating License No. DPR-67 Information Regarding Steam Generator Tube Rupture Steam Release and Mar-gin to Overfill Provided in Support of the Extended Power Uprate License Amendment Request

References:

(1) R. L. Anderson (FPL) to U.S. Nuclear Regulatory Commission (L-2010-259),"License Amendment Request (LAR) for Extended Power Uprate," November 22, 2010, Accession No. ML103560419.

(2) Email from T. Orf (NRC) to C. Wasik (FPL), "St. Lucie Unit 1 EPU -draft RAIs from Reactor Systems Branch (SRXB)," May 12, 2011.By letter L-2010-259 dated November 22, 2010 [Reference 1], Florida Power & Light Company (FPL) requested to amend Renewed Facility Operating License No. DPR-67 and revise the St. Lucie Unit 1 Technical Specifications (TS). The proposed amendment will increase the unit's licensed core thermal power level from 2700 megawatts thermal (MWt) to 3020 MWt and revise the Renewed Facility Operating License and TS to support operation at this increased core thermal power level. This represents an approximate increase of 11.85% and is therefore considered an Extended Power Uprate (EPU).During the course of their review and as provided in the May 12, 2011 electronic mail[Reference 2], NRC staff in the Reactor Systems Branch informally requested information related to steam generator tube rupture steam release and margin to overfill to support their review of the EPU LAR. The requested information is documented in Attachment 1 to this letter. Attachment 1 contains AREVA Proprietary information and Attachment 2 is the non-proprietary version of Attachment 1.an FPL Group company St. Lucie Unit 1 L-2011-311 Docket No. 50-335 10 CFR 50.90 Page 2 of 2 Attachment 3 contains the AREVA Proprietary Information Affidavit.

The purpose of this attachment is to withhold the proprietary information contained in Attachment 1 from public disclosure.

The Affidavit, signed by AREVA as the owner of the information, sets forth the basis for which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4)of § 2.390 of the Commission's regulations.

Accordingly, it is respectfully requested that the information which is proprietary to AREVA be withheld from public disclosure in accordance with 10 CFR 2.390.In accordance with 10 CFR 50.91 (b)(1), a copy of this letter is being forwarded to the designated State of Florida official.This submittal does not alter the significant hazards consideration or environmental assessment previously submitted by FPL letter L-2010-259

[Reference 1].This submittal contains no new commitments and no revisions to existing commitments.

Should you have any questions regarding this submittal, please contact Mr. Christopher Wasik, St. Lucie Extended Power Uprate LAR Project Manager, at 772-467-7138.

I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge.

Executed on 4-c. ,OU Very truly yours, Richard L. Anderson Site Vice President St. Lucie Plant Attachments (3)cc: Mr. William Passetti, Florida Department of Health