Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20058D739 + (15:02:40, 17 December 2024)
- ML20058D740 + (15:02:40, 17 December 2024)
- ML20058D738 + (15:02:41, 17 December 2024)
- ML20058D736 + (15:02:43, 17 December 2024)
- ML20058D734 + (15:02:44, 17 December 2024)
- ML20058D733 + (15:02:45, 17 December 2024)
- ML20058D728 + (15:02:48, 17 December 2024)
- ML20058D727 + (15:02:49, 17 December 2024)
- ML20058D725 + (15:02:50, 17 December 2024)
- ML20058D722 + (15:02:52, 17 December 2024)
- ML20058D721 + (15:02:53, 17 December 2024)
- ML20058D720 + (15:02:54, 17 December 2024)
- ML20058D719 + (15:02:55, 17 December 2024)
- ML20058D716 + (15:02:56, 17 December 2024)
- ML20058D713 + (15:02:59, 17 December 2024)
- ML20058D712 + (15:03:00, 17 December 2024)
- ML20058D710 + (15:03:02, 17 December 2024)
- ML20058D709 + (15:03:03, 17 December 2024)
- ML20058D707 + (15:03:04, 17 December 2024)
- ML20058D706 + (15:03:05, 17 December 2024)
- IR 05000373/1982008 + (15:03:06, 17 December 2024)
- ML20058D701 + (15:03:07, 17 December 2024)
- ML20058D698 + (15:03:08, 17 December 2024)
- ML20058D696 + (15:03:10, 17 December 2024)
- ML20058D695 + (15:03:11, 17 December 2024)
- ML20058D694 + (15:03:12, 17 December 2024)
- BVY-90-104, Responds to NRC Re Violations Noted in Insp Rept 50-271/90-09.Corrective Action:Procedure AP 0155, Current Sys & Valve Breaker Lineup & Identification, Revised + (15:03:13, 17 December 2024)
- ML20058D690 + (15:03:14, 17 December 2024)
- ML20058D688 + (15:03:15, 17 December 2024)
- ML20058D687 + (15:03:17, 17 December 2024)
- ML20058D684 + (15:03:18, 17 December 2024)
- ML20058D683 + (15:03:19, 17 December 2024)
- ML20058D682 + (15:03:20, 17 December 2024)
- ML20058D680 + (15:03:21, 17 December 2024)
- ML20058D679 + (15:03:22, 17 December 2024)
- PLA-1205, Final Deficiency Rept Re Inconsistencies in Vertical Dynamic Model for Reactor/Control Bldg.Initially Reported on 820426.Deficiency Determined Not Reportable Per 10CFR50.55e. Reporting Responsibilities Per 10CFR21 Satisfied + (15:03:24, 17 December 2024)
- ML20058D677 + (15:03:25, 17 December 2024)
- ML20058D675 + (15:03:27, 17 December 2024)
- ML20058D674 + (15:03:28, 17 December 2024)
- ML20058D671 + (15:03:29, 17 December 2024)
- 05000336/LER-1982-027-03, /03L-0:on 820619,control Element Assembly Motion Inhibit for All Control Element Assembly Groups Discovered Inoperable.Caused by Failed Nand Logic Chip (S/N 742ON) Due to Loss of Motion.Chip Replaced + (15:03:34, 17 December 2024)
- ML20058D669 + (15:03:36, 17 December 2024)
- ML20058D668 + (15:03:38, 17 December 2024)
- ML20058D667 + (15:03:39, 17 December 2024)
- 05000321/LER-1982-060-01, /01T-0:on 820703,spurious High Pressure Signal Caused Reactor Scram Resulting in MSIV Closure.During Subsequent Pressure transient,11 Safety Relief Valves Failed to Actuate at Prescribed Setpoints.Caused by Setpoint Drift + (15:03:41, 17 December 2024)
- ML20058D665 + (15:03:42, 17 December 2024)
- ML20058D663 + (15:03:44, 17 December 2024)
- ML20058D662 + (15:03:45, 17 December 2024)
- ML20058D661 + (15:03:46, 17 December 2024)
- ML20058D659 + (15:03:47, 17 December 2024)
- ML20058D657 + (15:03:49, 17 December 2024)