Text
.
PHILADELPHIA ELECTRIC COMPANY 10crR 55.41/.43 UMERICK GENER ATING sT ATION October 26, 1990 Docket Nos. 50 352 S AN ATOG A. PENNSYLV ANI A 19464 50 353 (a s s) 3 7.isoo. ext. sooo License Nos. NPF 39 OR AM AM M. LEtTCH NPF 85 Mr. Thomas T. Martin, Regional Administrator U. S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406 SUBJ ECT:
Limerick Generating Station (LCS Units 1 and 2)
Licensed Operator Initial Qualification Program l
Reference Material Submittal to:
)
Mr. Mark Parrish EG & G Idaho, Inc.
1520 sawtelle toad Idaho Falls. Idaho 83402 (208) 526 9356 y
Dear Mr Martin:
The referenced material listed below was submitted for use during the scheduled visit of the NRC Region I to administer Limerick Generating Station.
Unit 1 and Unit 2 Licensed Operator Initial Qualification (LOT)-Program examinations the week of January 21, 1991 through January 25, 1991.
This information is sent based upon " Reference Material Requirements" Enclosure #1 of the NRC 60 day letter dated October 23, 1990.
A listing of the enclosed material is as follows:
All Licensed Operator Training (LOT)-lesson plans (including Diagnostic Systems Training) l I
All Administrative (A) Procedures (including Nuclear Group Administrative. Procedures) l All General Plant (GP) Procedures l
All Off Normal (ON), Operational Transient (OT), and Trip.(T)
Procedures All Chemistry (CH) and Radwaste (RW), Procedures e
l li % &
uV TEya D
A 2
y
{;
o Mr. Th: mas T. Martin (2)
Oct:bsr 26, 1990 All Event (E) and Special Event (SE) Procedures Standing Orders Tank and Pump Curves All Fire (F) Procedures All Emergency (EP) Procedures All Surveillance Test (ST) and Routine Test (RT) Procedures All Fuel Handling (FH) and Reactor Engineer (RE) Procedures All Annunciator Response Cards (ARC)
All Health Physics (HP) and Radiation and Meteorological Monitoring System (RMMS) Procedures Unit I and Unit 2 Technical Specifications (with PORC Positions)
All System Operating (S)_ Procedures Piping and Instrument Diagrams (P&ID's)
LCS License Event Reports 10/1/88 to 9/30/90 (as applicable to Operators)
I Plant Specific Technical Guides '(PSTC) e This material should cover all information requested in enclosure #1 for the development and review of LCS written examinations. This material, along with i
material necessary for simulator and plant' oral examinations will be delivered to 1
i your Region 1 Headquarters on or before November 15, 1990.
If there are any questions with this material, please call V. J. Cwietniewicz,. Superintendent Training, 327 1200 extension 2080.
l Very truly yours,
/1 is I,9
, j e.
/
PTD:km1 xc:
L. H, Bettenhauser, Operations Branch, Region 1, NRC T. J. Kenny, USNRC, Senior Resident Inspector, LCS J. H. Williams USNRC, Region 1 S. Hansell, USNRC, Region 1 Document Control Desk, USNRC, Washington, D. C.
INV0 ICE 1
PROCEDURES
.NO. 0F BINDERS BOX NO.
A 5
i CH 5
2 EP 2
3 F
2 3
l FH I
3 GP 2
4 HP 3
4 ON/0T/T 3
5 PSTG l-5 RE 1
5~
RMMS 1
6 RT/R, RT/0, RT/5 -U/1 2
6 U/2 1
6 SE/E 1
.6 S
19 7,8,9,10 Tech Specs
- U/l
'1 11
- U/2
-1:
11' Tech Spec Pore Positions 1
11~
RW 3
10,11 RT-l/3
- U/1 3
12
- U/2 2
- U/1 3
13.
- U/2 2
- U/1 6
M,15
- U/2 4
l Trip Procedures 0
23 Annunciator Cards - BOP 5
16,17,18 i
MCR 8-LESSON PLANS LOT - Index to LOT-2004) 9.-
21,22' LER's - 1989-1990 1
19 0
P&lD's
.2 20 OST - Index to DST-005
.1-20.
l Standing Night Orders & Pump 1
- 20 i
Curves
^
NGAPS & Reference Manual 3-19 l.
l s
i,.
x.
V
.t-
,i i