Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20059G617 + (07:05:26, 17 December 2024)
- ML20059G616 + (07:05:27, 17 December 2024)
- ML20059G614 + (07:05:28, 17 December 2024)
- ML20059G615 + (07:05:28, 17 December 2024)
- ML20059G613 + (07:05:29, 17 December 2024)
- ML20059G611 + (07:05:30, 17 December 2024)
- NRC-94-4036, Forwards Proprietary Responses to NRC RAIs Re AP600 Instrumentation & Control Sys.Responses Withheld (Ref 10CFR9.17(a)(4)) + (07:05:31, 17 December 2024)
- ML20059G608 + (07:05:32, 17 December 2024)
- ML20059G604 + (07:05:33, 17 December 2024)
- 05000293/LER-1993-024, :on 930930,determined MO-2301-5 Had Inadequate Thrust to Perform Designed Closing Function.Caused by Running Efficiency Used in Valve Thrust Calculation. Modified Motor Pinion Gearing + (07:05:39, 17 December 2024)
- ML20059G600 + (07:05:40, 17 December 2024)
- HL-4476, Monthly Operating Repts for Dec 1993 for Ehnp Units 1 & 2 + (07:05:42, 17 December 2024)
- ML20059G594 + (07:05:43, 17 December 2024)
- ML20059G591 + (07:05:44, 17 December 2024)
- ML20059G590 + (07:05:45, 17 December 2024)
- ML20059G588 + (07:05:46, 17 December 2024)
- B14619, Proposed Tech Specs Increasing AOT for Charging Pump from 72 Hours to Seven Days + (07:05:47, 17 December 2024)
- ML20059G586 + (07:05:47, 17 December 2024)
- ML20059G584 + (07:05:49, 17 December 2024)
- ML20059G582 + (07:05:50, 17 December 2024)
- ML20059G581 + (07:05:51, 17 December 2024)
- ML20059G576 + (07:05:54, 17 December 2024)
- JSP-005-94, Provides Final Response to NRC Bulletin 93-003, Resolution of Issues Related to Reactor Vessel Water Level Instrumentation in Bwrs + (07:05:54, 17 December 2024)
- ML20059G575 + (07:05:55, 17 December 2024)
- ML20059G573 + (07:05:56, 17 December 2024)
- NRC-93-0153, Ro:On 931216 Failure of EDG 13 Occurred.Fuel Rack Linkage Found Disconnected During Troubleshooting.Caused by Clamp Bolt Coming Loose.Investigation of Why Bolt Came Loose in Progress.Engine Shut Down & Fuel Rack Linkage Reconnected + (07:05:57, 17 December 2024)
- 2CAN019401, Monthly Operating Rept for Dec 1993 for ANO Unit 2 + (07:05:58, 17 December 2024)
- JSP-719-90, Application for Amend to License DPF-62,revising Tech Spec 3/4.6.5, Drywell Post-LOCA Vacuum Relief Valves + (07:05:58, 17 December 2024)
- ML20059G568 + (07:05:59, 17 December 2024)
- ML20059G567 + (07:06:01, 17 December 2024)
- ML20059G566 + (07:06:02, 17 December 2024)
- ML20059G562 + (07:06:03, 17 December 2024)
- ML20059G563 + (07:06:03, 17 December 2024)
- W3P90-1163, Forwards Relief Requests Associated w/10-yr Inservice Insp Program Per Section 50.55a(g)(6)(i) of 10CFR50 + (07:06:04, 17 December 2024)
- ML20059G559 + (07:06:05, 17 December 2024)
- ML20059G560 + (07:06:05, 17 December 2024)
- ML20059G558 + (07:06:07, 17 December 2024)
- ML20059G557 + (07:06:07, 17 December 2024)
- ML20059G554 + (07:06:08, 17 December 2024)
- ML20059G555 + (07:06:08, 17 December 2024)
- 3F0194-06, Monthly Operating Rept for Dec 1993 for Crystal River Unit 3 + (07:06:09, 17 December 2024)
- JSP-720-90, Application for Amend to License NPF-62,changing Neutron Monitoring Functions of Listed Tech Specs + (07:06:10, 17 December 2024)
- ML20059G546 + (07:06:10, 17 December 2024)
- ML20059G545 + (07:06:11, 17 December 2024)
- ML20059G542 + (07:06:12, 17 December 2024)
- ML20059G540 + (07:06:13, 17 December 2024)
- ML20059G537 + (07:06:14, 17 December 2024)
- ML20059G538 + (07:06:14, 17 December 2024)
- ML20059G533 + (07:06:17, 17 December 2024)
- ML20059G532 + (07:06:18, 17 December 2024)
- ML20059G531 + (07:06:19, 17 December 2024)
- B14723, Reactor Containment Bldg ILRT Rept + (07:06:20, 17 December 2024)