- ML20063A665 + (03:13:31, 17 December 2024)
- JSP-015-94, Requests Schedule Extension to Complete GL 89-10 Activities for 70 MOVs in Util GL 89-10 Program.Proposed Schedule Would Extend Original Completion Date of 940628 to End of Sixth Refueling Outage Scheduled to Begin During Oct of 1996 + (03:13:32, 17 December 2024)
- ML20063A662 + (03:13:32, 17 December 2024)
- ML20063A661 + (03:13:33, 17 December 2024)
- ML20063A658 + (03:13:34, 17 December 2024)
- ML20063A656 + (03:13:35, 17 December 2024)
- ML20063A655 + (03:13:36, 17 December 2024)
- ML20063A653 + (03:13:37, 17 December 2024)
- ML20063A652 + (03:13:38, 17 December 2024)
- ML20063A651 + (03:13:39, 17 December 2024)
- ML20063A648 + (03:13:40, 17 December 2024)
- ML20063A647 + (03:13:40, 17 December 2024)
- ML20063A646 + (03:13:41, 17 December 2024)
- ML20063A645 + (03:13:42, 17 December 2024)
- ML20063A640 + (03:13:42, 17 December 2024)
- ML20063A638 + (03:13:43, 17 December 2024)
- ML20063A636 + (03:13:43, 17 December 2024)
- ML20063A633 + (03:13:47, 17 December 2024)
- ML20063A630 + (03:13:48, 17 December 2024)
- ML20063A629 + (03:13:49, 17 December 2024)
- RBG-39894, Application for Amend to License NPF-47,revising TS for Removal of Component Lists,Per Generic Ltrs 91-01 & 91-08 + (03:13:50, 17 December 2024)
- ML20063A621 + (03:13:50, 17 December 2024)
- ML20063A619 + (03:13:51, 17 December 2024)
- 1CAN019401, Application for Amend to License DPR-51,revising TS Modifying Use of RPS Channel Bypass + (03:13:52, 17 December 2024)
- ML20063A612 + (03:13:54, 17 December 2024)
- ML20063A610 + (03:13:55, 17 December 2024)
- B14718, Responds to NRC Re Violations Noted in Insp Rept 50-423/93-24 on 930825-1108.Corrective Actions:Counseled Involved Individuals & Reviewed Administrative Procedure + (03:13:56, 17 December 2024)
- ST-HL-AE-4660, Forwards Record of Investigative Findings & Corrective Actions Taken by Lab Providing Chemical Testing Svcs + (03:13:56, 17 December 2024)
- ML20063A602 + (03:13:57, 17 December 2024)
- ML20063A592 + (03:13:58, 17 December 2024)
- ML20063A596 + (03:13:58, 17 December 2024)
- ML20063A590 + (03:13:59, 17 December 2024)
- 05000311/LER-1982-068-03, /03L-0:on 820722,control Room Operator Received Indication of Malfunction of Containment Plant Monitoring Sys.Caused by Improper Screw Adjustment Resulting in Binding of Channel 2R11A Filter Paper.Screws Adjusted + (03:14:01, 17 December 2024)
- ML20063A580 + (03:14:02, 17 December 2024)
- 05000382/LER-1993-009-01, :on 931115,PSV Setpoint Found Out of Tolorance Due to Errors Introduced When Establishing Setpoints.Safety Valve Test Procedures Revised & Evaluation of Changes to TS Expected to Be Completed by 940727 + (03:14:08, 17 December 2024)
- 05000311/LER-1982-068, Forwards LER 82-068/03L-0.Detailed Event Analysis Encl + (03:14:09, 17 December 2024)
- ML20063A574 + (03:14:09, 17 December 2024)
- RBG-13-212, Final Deficiency Repts DR-33 & DR-41 Re Improperly Installed Spring Nuts & Torquing Requirements for Spring Nuts. Initially Reported on 820211 & 0308,respectively.Safety Not Adversely Affected.Not Reportable Under 10CFR50.55(e) + (03:14:10, 17 December 2024)
- ML20063A566 + (03:14:11, 17 December 2024)
- ML20063A559 + (03:14:12, 17 December 2024)
- ML20063A553 + (03:14:13, 17 December 2024)
- ML20063A549 + (03:14:13, 17 December 2024)
- 05000382/LER-1993-011-02, :on 931220,determined That Two of Three Lea Position Indications Inoperable Since 931219 Due to Weak man-machine Interface.Enhancement to Plant Monitoring Computer CEA Processing Will Be Made + (03:14:15, 17 December 2024)
- ML20063A544 + (03:14:16, 17 December 2024)
- ML20063A543 + (03:14:17, 17 December 2024)
- ML20063A542 + (03:14:18, 17 December 2024)
- 05000298/LER-1982-019-03, /03L-0:on 820726,drywell Equipment Sump 1G High Level Alarm W/Subsequent Automatic Pump Operation Observed. Caused by Blown Fuse in Power Supply 20-545A for Flow Recorder & Flow Integrator.Fuse Replaced + (03:14:19, 17 December 2024)
- ML20063A534 + (03:14:20, 17 December 2024)
- ML20063A518 + (03:14:21, 17 December 2024)
- ML20063A528 + (03:14:21, 17 December 2024)
- 3F0194-04, Forwards Request for Exemption from 10CFR50.75, Reporting & Recordkeeping for Decommissioning Planning + (03:14:22, 17 December 2024)
- LD-82-075, Forwards Itemized Review of Compliance of CESSAR FSAR w/10CFR20,50 & 100.Sys 80 NSSS Design Similar to Earlier C-E NSSS Which Met NRC Regulations + (03:14:22, 17 December 2024)