ML20063A636

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Dec 1993 for Calvert Cliffs Nuclear Power Plant
ML20063A636
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 12/31/1993
From: Cruse C, Piazza F
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9401260211
Download: ML20063A636 (11)


Text

.

  • B ALTIMORE

. GAS AND ELECTRIC 1

CALVERT CLIFFS NUCLEAR POWER PLANT l 1650 CALVERT CLIFFS PARKWAY

  • LUSBY, MARYLAND 20657-4702 CHARLES H. CRUSE PLANT GENERAL MANAGER CALVERT CLIFFS January 13,1994 1

U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 4 December 1993 Oncratinc Data Reports l

j The subject reports are being sent to you as required by Technical Specification 6.9.1.6.

Should you have any questions, please contact Mr. Bruce Mrowca at (410) 260-3989.

Very truly yours, kh 'l ? //

L P f/

CHC/FP/ dim Attachments cc: D. A. Brune, Esquire

{ J. E. Silberg, Esquire R. A. Capra, NRC D. G. Mcdonald, Jr., NRC T. T. Martin, NRC P. R. Wilson, NRC R. A. Hartfield, NRC R. I. McLean, DNR J. H. Walter, PSC P. Lewis, INPO K. Larson, ANI 9401260211 931231 5 l'[

PDR ADOCK 05000317 R p99 g{I

~ , . . = . ~ =

f i ,

'. j i l

\

j oco*********************************************************s***********c***

! UNXT 1

! OPERATING DATA REPORT j ocoo************************************************************************

l Docket No. 50-317

! January 13, 1994 Prepared by Frank Piazza Telephone:(410)260-3821 OPERATING STATUS l l

1. UNIT NAME Calvert Cliffs Unit 1
2. REPORTING PERIOD DECEMBER 1993~
3. LICENSED THERMAL POWER (MWT) 2700
4. NAMEPLATE RATING (GROSS MWe) 918
5. DESIGN ELECTRICAL RATING (NET MWe) 845
6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 866
7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 830
8. CHANGE IN CAPACITY RATINGS NONE
9. POWER LEVEL TO WHICH RESTRICTED N/A
10. REASONS FOR RESTRICTIONS N/A Cumulative This month Year-to-Date to Date
11. HOURS IN REPORTING PERIOD 744 8,760 163,501
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 8,619.0 116,969.0
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 3,019.4
14. HOURS GENERATOR ON LINE 744.0 8,599.5 114,578.4
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,986,093 23,035,968 290,314,819
17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 662,384 7,646,012 96,473,546
18. NET ELECTRICAL ENERGY GENERATED (MWH) 635,795 7,334,896 91,804,282
19. UNIT SERVICE FACTOR 100.0 98.2 70.1
20. UNIT AVAILABILITY FACTOR 100.0 98.2 70.1
21. UNIT CAPACITY FACTOR (USING MDC NET) 103.6 101.1 68.0
22. UNIT CAPACITY FACTOR (USING DER NET) 101.1 99.1 66.4
23. UNIT FORCED OUTAGE RATE 0.0 1.8 8.7
24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):

Refueling, February 4, 1994, 95 days l

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP: )

]

N/A <

l

i 1

l UNIT SillTrl) OWNS AND POWER REDUCrlONS DOCKET NO. 50-317 UNIT NAME Calvert Cliffs-UI DATE January 13.1994 COMPLETED BY Frank Piana TELEPHONE (410) 2N)-3821 REPORT MONTII December 1993 i

ME1110D OF SilUTTING LICENSEE CAUSE & CORRECTIVE DURAT10N DOWN EVENT SYSTEM COMPONENT ACTION TO NO. DATE TYPEI (IIOURS) REASON 2 REACTOR 3 REPORT # CODE 4 CODE 5 PREVENT RECURRENCE 93-06 931207 F 0 H 5 N/A FK XFMR On 12/7B3 a transformer fire at the Waugh Chapel Substation, located 48 miles north of Calvert Cliffs, required a power reduction to approximately 75%

reactor power until repairs were completed. While the power was reduced, a leak on the 13A Fecdw2ter Heater relief valve was repaired. The relief valve was overhauled and the setpoint was increased. The reactor was returned to full power on 12/893 at 2000.

1 F: Forced 2 Reason: 3 Method: 4 IEEE Standard 805-1984 S: Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram.

C - Refueling 3 - Automatic Scram. 5 IEEE Standard 803A-1983 D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Reduced Load F- Administiative 9 - Other G - Operational Error H - Other

_ _. .. - _ = - _ _

AVERAGE DAILY UNIT POWER LEVEL woo *********************************************************************

l Docket No. 50-317 Calvert Cliffo Unit No. 1 January 13, 1994 Prepared by Frank Piazza

Telephone
(410) 260-3821 ,

1 l DECEMBER 1993 j ****************

i i j Average Daily Power Level Average Daily Power Level

! Day (MWe-Net) Day (MWe-Net)

1 866 17 866 i

865

. 2 864 18 I

l 3 865 19 866 i 4 751 20 866 5 847 21 866 6 863 22 865 7 752 23 867 j l

i

! 8 761 24 868 9 864 25 867 10 864 26 868 11 865 27 868 12 866 28 868 13 865 29 868 ,

14 865 30 869 15 866 31 868 16 866 1

l l

, _ ~ . . . _ _ -- , , - - ~ ~ , - - . -.- . , - + , _ . .

i e

1 DOCKET NO. 50-317 CALVERT CLIFFS - UNIT 1 January 13,1994 1

l

SUMMARY

OF OPERATING EXPERIENCE T

December 1993 The unit began the month at 100% reactor power and 860 MWe.

On 12/4S3, at 0310, the power was reduced for water box cleaning, removal of the Main Generator cooler section and repair of the 16B Feedwater Heater relief valve. The unit was returned to full power on 12/5S3 at 0630.

On 12/7S3 at 1017, a transformer fire at the Waugh Chapel Substation, located 48 miles north of Calvert Cliffs, required a power reduction until repairs could be affected. Power was decreased to approximately 77% reactor power at 1200 on 12/7S3. During the power reduction, maintenance was performed to repair 13A Feedwater Heater relief valve. The unit was returned to full power on 12/8S3 at 2000.

The Unit ended the month at 865 MWe and 100% reactor power.

l l

I i

r n- -- _ . . - - . - - -

January 5, 1994 NFM 94-004 Pa'ge 2 of 4 REFUI' LING INFORMATION RE0VES_I

1. Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No.1. l
2. Scheduled date for next refueling shutdown: February 4, 1994.
3. Scheduled date for restart following refueling: May 9, 1994.
4. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

l Operation after refueling will require either " Core Operating Limits Report" or will require a change to Technical Specification 3/4.2.2, "Lir. ear Heat Rate".

5. Scheduled date(s) for submitting proposed licensing action and supporting information. ]

1 Submitted September 1993 for Core Operating Limits Report.

6. Important licensing considerations associated with the refueling.

None identified at this time.

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

(a) 217. (b) 1426. (Note 2)

Spent fuel pools are common to Units 1 and 2.

8. (a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

(a) 4710. (NOTE 1) (b) 0.

9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining  !

space for one full core off-load. i March 2014 NOTE 1: 4710 total licensed site storage capacity.  !

(1830 pool + 2880 Ispsi) j NOTE 2: 48 Spent Fuel Assemblies in the ISFSI and 24 in process of being  !

transferred.

i

oco*************************************************************************

UNIT 2 OPERATING DATA REPORT

  • co*************************************************************************

Docket No. 50-318 January 13, 1994 Prepared by Frank Piazra Telephone:(410)260-3821 OPERATING STATUS

1. UNIT NAME Calvert Cliffs Unit 2
2. REPORTING PERIOD DECEMBER 1993
3. LICENSED THERMAL POWER (MWT) 2700
4. NAMEPLATE RATING (GROSS MWe) 911
5. DESIGN ELECTRICAL RATING (NET MWe) 845
6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 866
7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 830
8. CHANGE IN CAPACITY RATINGS NONE
9. POWER LEVEL TO WHICH RESTRICTED N/A
10. REASONS FOR RESTRICTIONS N/A Cumulative This month Year-to-Date to Date
11. HOURS IN REPORTING PERIOD 744 8,760 146,856
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 6,072.4 106,036.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6
14. HOURS GENERATOR ON LINE 744.0 5,941.8 104,523.6
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,997,513 15,720,751 266,865,543
17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 671,946 5,197,091 88,155,869
18. NET ELECTRICAL ENERGY GENERATED (MWH) 645,972 4,974,705 84,243,134
19. UNIT SERVICE FACTOR 100.0 67.8 71.2
20. UNIT AVAILABILITY FACTOR 100.0 67.8 71.2
21. UNIT CAPACITY FACTOR (USING MDC NET) 105.2 68.6 69.5
22. UNIT CAPACITY FACTOR (USING DER NET) 102.8 67.2 67.9
23. UNIT FORCED OUTAGE RATE 0.0 1.0 5.7
24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):

N/A

25. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:

N/A

UNIT SilUTDOWNS AND POWER REDUCrlONS DOCKET NO. 50-318 UNIT NAME CaIvert Cliffs-U2 ,

DATE January 13.1993 .

COMPLETED BY Frank Pia 72a TELEPHONE (410) 260-3821 REPORT MONTil December 1993 METIIOD OF l SIIUTIlNG LICENSEE CAUSE & CORRECTIVli DURATION DOWN EVENT SYSTliM COMPONENT ACITON TO NO. DATE TYPIsl (llOURS) REASON 2 REACFOR3 REPORT # CODE 4 CODES PREVENT RECURRENCE 93-07 931207 F 0 H 5 N/A FK XFMR On 12BS3 at 1017 a transformer fire at the Waugh Chapel Substation, located 48 miles north of Calvert Cliffs, required a power reduction to approximately 75% reactor power. The transformer was repaired and the unit was returned to 100%

reactor power on 12nB3 at 2150.

1 F: Forced 2 Reason: 3 Method: 4 IEEE Standard 805-1984 S: Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram.

C - Refueling 3 - Automatic Scram. 5 IEEE Standard 803A-1983 D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Reduced Imad F- Administrative 9 - Other G - Operational Error H - Other l

d AVERAGE DAILY UNIT POWER LEVEL

, ocoo********************************************************************

Docket No. 50-318 Calvert Cliffs Unit No. 2 1 January 13, 1994

]

Prepared by Frank Piazza Telephone: (410) 260-3821 DECEMBER 1993 Average Daily Power Level Average Daily Power Level Day (MWe-Net) Day (MWe-Net) 1 871 17 871 2 871 18 871 3 872 19 871 4 871 20 871 5 871 21 871 6 870 22 870 7 809 23 870 8 867 24 870 9 868 25 871 10 868 26 870 11 870 27 870 12 870 28 869 13 870 29 870 14 871 30 870 15 870 31 871 16 871 l

l l

I l

l l

i 4  !

DOCKET NO. 50-318 CALVERT CLIFFS - UNIT 2 January 13,1994 i l

i SUhth1ARY OF OPERATING EXPERIENCE l i

December 1993 l

The unit began the month at 10096 reactor power and 865 htWe, On 12n/93, at 1017, power was reduced to 7596 reactor power because of a transformer fire at the Waugh Chapel Substation, located 48 miles north of Calvert Cliffs. The power was returned to 10096 at 2150 on 129/93.

The unit ended the month at 10096 reactor power and 870 htWe. -

1

- January 6, 1994 NF.H 94-004

- Page 3 of 4 REFUELING INFORMATION REQUEST i

^

1. Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2 1
2. Scheduled date for next refueling shutdown: Narch 3, 1995. l
3. Scheduled date for restart following refueling: Nay 17, 1995.

l 4. Will refueling or resumption of operation thereafter require a Technical i Specification change or other license amendment?

I Unknown.

5. Scheduled date(s) for submitting proposed licensing action and supporting information.

Unknown.

6. Important licensing considerations associated with the refueling.

None identified at this time.

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel
storage pool.

, (a) 217. (b) 1426. (Note 2) l Spent fuel pools are common to Units 1 and 2.

8. (a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been
requested or is planned, in number of fuel assemblies.
(a) 4710 (NOTE 1) (b) 0. l
9. The projected date of the last refueling that can be discharged to the

. Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.

Narch 2016.

l 1

4 NOTE 1: 4710 total licensed site storage capacity.

(1830 pool + 2880 ISFSI) j NOTE 2: 48 Spent Fuel Assemblies in the ISFSI and 24 in process of being i transferred.

i l

t

. . . . , . , -