Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20064L172 + (01:25:35, 17 December 2024)
- ML20064L178 + (01:25:35, 17 December 2024)
- ML20064L168 + (01:25:36, 17 December 2024)
- ML20064L167 + (01:25:36, 17 December 2024)
- ML20064L166 + (01:25:37, 17 December 2024)
- 05000336/LER-1994-003-02, :on 940218,degration of Sychronizing Capability Between Inverters Potential to Invalidate Assumption for Main Stream Line Break.Adjustments Made to Underfrequency Frequency Limiter Circuit + (01:25:42, 17 December 2024)
- ML20064L151 + (01:25:44, 17 December 2024)
- ML20064L148 + (01:25:45, 17 December 2024)
- L-94-009, Forwards Revised ASME Section XI Pressure Test Program Relief Request PTP-3-03.Relief Request Revised to Include 100% Volmetric Exam of Welded Joints Associated W/Repair as Part of Proposed Alternate Requirement + (01:25:46, 17 December 2024)
- NRC-94-4079, Advises That Review of Proprietary Matl NRC RAI on AP600 Received in ,Indicates That RAI Contains No Info Westinghouse Considers Proprietary + (01:25:46, 17 December 2024)
- 05000324/LER-1983-004-03, /03L-0:on 830105,during Jumper Installation, Reactor Protection Sys Relay C72-K6C Found Melted Around Coil.Caused by Overheating of Relay.Relays to Be Inspected Monthly Until Replaced W/Improved Components + (01:25:48, 17 December 2024)
- ML20064L137 + (01:25:49, 17 December 2024)
- ML20064L134 + (01:25:50, 17 December 2024)
- 05000440/LER-1994-007, :on 940217,passive Seismic Instrument Failure Occurred Due to Intrusion of Water.Affected Instrument, Peak Acceleration Recorder Replaced + (01:25:52, 17 December 2024)
- ML20064L131 + (01:25:53, 17 December 2024)
- ML20064L128 + (01:25:54, 17 December 2024)
- 05000254/LER-1983-001-03, /03L-0:on 830104,diesel Generator 1/2 Tripped on High Crankcase Pressure Signal.Caused by Lubricating Oil Splashing on Pressure Sensor Upon Startup.Sensor Replaced + (01:25:56, 17 December 2024)
- ML20064L125 + (01:25:57, 17 December 2024)
- 05000324/LER-1983-004, Forwards LER 83-004/03L-0 + (01:25:59, 17 December 2024)
- ML20064L123 + (01:25:59, 17 December 2024)
- ML20064L117 + (01:26:00, 17 December 2024)
- 1CAN028306, Submits Updated Info Re Status of Ongoing Steam Generator Tube Inservice insps.Once-through Steam Generator Tube Sheet Maps,Defective Tube Summary & Summary of Operational History of Previous Cycle Encl + (01:26:01, 17 December 2024)
- 05000416/LER-1982-187-99, /99X-0:on 821229,smoke Detection Zone Covering Auxiliary Bldg Corridors at 166-ft Elevation Alarmed & Would Not Reset.Caused by Accumulation of Dust in Detector. Detector Cleaned,Functionally Tested & Returned to Svc + (01:26:03, 17 December 2024)
- 05000254/LER-1983-001, Forwards LER 83-001/03L-0 + (01:26:04, 17 December 2024)
- 05000416/LER-1982-187, Forwards LER 82-187/99X-0 + (01:26:05, 17 December 2024)
- ML20064L092 + (01:26:06, 17 December 2024)
- LG-83-049, Forwards Response to 821210 Request for Addl Info on IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel). Monitoring Program for Clams to Be Established + (01:26:07, 17 December 2024)
- PY-CEI-NRR-1774, Responds to NRC Re Violations Noted in Insp Rept 50-440/93-23 on 931219-940129.Corrective Actions:Restored Continuous Reactor Water Conductivity Measurement on 940116 & Human Performance Enhancement Sys Evaluation Initiated + (01:26:07, 17 December 2024)
- ML20064L071 + (01:26:17, 17 December 2024)
- 2CAN039402, Provides Overview of Program Re Steam Generator Tubes Research Plan.Complete Description of Planned Program Included in Attachment + (01:26:18, 17 December 2024)
- ML20064L061 + (01:26:20, 17 December 2024)
- ML20064L057 + (01:26:21, 17 December 2024)
- ML20064L056 + (01:26:22, 17 December 2024)
- 05000416/LER-1983-010, Forwards LER 83-010/99X-0 + (01:26:23, 17 December 2024)
- ML20064L052 + (01:26:26, 17 December 2024)
- ML20064L049 + (01:26:27, 17 December 2024)
- 05000416/LER-1983-006-03, /03L-0:on 830112,fire Doors OC714 & OCT10 Temporarily Blocked Open to Facilitate Planned Maint.Fire Watch Posted & Doors Closed at Completion of Work + (01:26:29, 17 December 2024)
- ML20064L041 + (01:26:29, 17 December 2024)
- BSEP-94-0103, Special Rept 1-SR-94-002:on 940226,fire Barrier Penetration Between EDG Bldg & Diesel Fuel Oil Day Storage Tank Room Opened.Fire Watch Stationed Prior to Opening Penetration & Remained in Place Until Penetration Fire Seal Operable + (01:26:30, 17 December 2024)
- ML20064L025 + (01:26:32, 17 December 2024)
- 05000416/LER-1983-006, Forwards LER 83-006/03L-0 + (01:26:33, 17 December 2024)
- ML20064L006 + (01:26:34, 17 December 2024)
- ML20064L009 + (01:26:34, 17 December 2024)
- ML20064L005 + (01:26:36, 17 December 2024)
- ML20064L004 + (01:26:36, 17 December 2024)
- ML20064K997 + (01:26:37, 17 December 2024)
- ML20064K992 + (01:26:43, 17 December 2024)
- ML20064K986 + (01:26:44, 17 December 2024)
- ML20064K988 + (01:26:44, 17 December 2024)
- ML20064K973 + (01:26:46, 17 December 2024)
- ML20064K969 + (01:26:47, 17 December 2024)