Monthly Operating Rept for Jan 1983
ML20064L167
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 02/10/1983
From: Gabe Taylor
SOUTH CAROLINA ELECTRIC & GAS CO.
To:
Shared Package
ML20064L153 List:
References
NUDOCS 8302150136
Download: ML20064L167 (4)


Text

~

t Director, Office of Management and Program Analysis Monthly Operating Report

" age 2 ruary 10, 1983 l

ATTACHMENT I

~ AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. sn /to s UNIT v.c. summer I I

l DATE 07-10-91 COMPLETED BY G.J. Taylor TELEPHONE (803) 345-5209 MONTH JANUARY 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 416 37 410 g

412 169 2

gg,

3 619 19 qqn 4

416 20 40R 5

413 21 417 6

416 22 901 7

417 23 398 8

414 24 411 g

413 25 416 l

10 414 26 An?

I 11 409 y

an?

t 12 409 28 400 13 407 29

') ? 'l 14 408 30 390 15 411 31 199 18 412 8302150136 830210 DRADOCK05000g

W 4

Director, Office of Management and Program Analysis ATTACHMENT II

& nthly Operating Report OPERATING DATA REPORT Page 3

~ ' ~ ~

50/395 February 10, 1983 DOCKET NO.

V.C. Summer I UNIT 02-10-83 OATE G.J. Taylor COMPLETED BY (803) 345-5209 TELEPHONE OPERATING STATUS 744 JANITARY 1983 GROSS HOURS IN REPORTING PERIOO:

1. REPORTING PERIOD:

2775 MAX. DEPEND. CAPACITY (MWo. Net): N/A

2. CURRENTLY AUTHORIZED POWER LEVEL (MWt):

400 DESIGN ELECTRICAL RATING (MWo. Net):

N/A (50% MWth)

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWo. Net):
4. REASONS FOR RESTRICTION (IF ANY):

The operating license allows operations t THIS MONTH YR TO DATE CUMULATIV E 50% MWth for power operations testing.

77R 5 77R 5 7015_1

5. NUMBER OF HOURS REACTOR WAS CRITICAL 0

0 0

6. REACTOR RESERVE SHUTDOWN HOURS...................

710.7 710.7 1472.0

7. HOURS GENERATOR ON LINE.........................

0 0

0

8. UNIT RESERVE SHUTDOWN HOURS......................

975.351 975.351 1.771.224

9. GROSS THERMAL ENERGY GENERATED (MWH) 311,300 311.300 527.517
10. GROSS ELECTRICAL ENERGY GENERATED (MWH).............

287,476 287,476 478,672

11. NET ELECTRICAL ENERGY GENERATED (MWH)

N/A N/A N/A

12. R EACTOR SE RV ICE F ACTOR...........................

'N/A N/A N/A

13. REACTOR AV AILABILITY F ACTOR.......................

N/A N/A N/A

14. UNIT SE RVICE F ACTOR..............................

N/A N/A N/A

15. UNIT AVAILABI LITY F ACTOR..........................

N/A N/A N/A

16. UNIT CAPACITY FACTOR (Using MDC17.... r...............
17. UNIT CAPACITY FACTOR (Using Design MWel.

^

18. UNIT FORCED OUTAGE R ATE.........................
19. SHUTOOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):

D-3 Steam Generator Modification -- March 1983 through May 1983 N/A

20. IF SHUT DOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATICN):

FORECAST ACHIEVED 10-20-82 10-22-82 INITI AL CRITICALITY 11-17-82 11-16-82 INITIAL ELECTRICITY l

COMMERCI AL OPERATION

Director, Office of Management and Program Analysis ATTACHMENT III DOCKET NO. 50/395 Monthly Operating Report Page 4 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME V.C. Summer I February 10, 1983 02-10-83 1.) ATE COMPLETED BY G.J. Tavlor REPORT MONTil JANUARY 1983 TELEPilONE (803) 345-5209 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO.

DATE S: SCHEDULED (HOURS)

REASON (1)

REDUCING POWER (2)

CORRECTIVE ACTIONS / COMMENTS 1

830118 F

16.1 A

3 1)

Reactor trip due to Hi bearing vibration in turbine, caused by loose connections in turbine supervisory cabinet.

2) Turbine trip, reactor trip while F

8.9 B

3 2

830122 performing a vibration monitoring surveillance.

I 3

830129 F

8.3 B

2

3) Manual reactor trip due to inadvertantly dropping four (4) control rods (instead of two (2) control rods) while performing Nuclear Instrumentation Negative Rate Reactor Trip Test.

l o

i e

Director, Office of Management -and Program Analysis Monthly Operating Report Page 5 February 10, 1983 ATTACHMENT IV NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Virgil C.

Summer Nuclear Station, Unit No.1, has been in the precess of continuing the power ascension test program at a 50% of rated thermal power level.

A reactor trip occurred at 1051 hours0.0122 days <br />0.292 hours <br />0.00174 weeks <br />3.999055e-4 months <br /> January 18,1983, from a 50%

power level.

The trip was due to a turbine trip on Hi bearing vibration.

An investigation revealed that a. spurious trip signal was generated due to loose electrical connections in the turbine supervisory cabinet.

A reactor trip occurred at 1150 hours0.0133 days <br />0.319 hours <br />0.0019 weeks <br />4.37575e-4 months <br /> January 22, 1983, from a 50%

power level.

The reactor trip was due to a turbine trip while performing a surveillance test on the main turbine control and stop valves.

A reactor trip occurred at 1337 hours0.0155 days <br />0.371 hours <br />0.00221 weeks <br />5.087285e-4 months <br /> January 29,1983, from a 50%

power level.

The reactor was tripped manually, when four (4) control rods [instead of two (2)] were inadvertantly dropped, while performing a Nuclear Instrumentation Negative Rate Reactor Trip Test.

Virgil C.

Summer Nuclear Station is presently operating at a 50%

power level and continuing the power ascension test program.