t Director, Office of Management and Program Analysis Monthly Operating Report

" age 2 -

ruary 10, 1983 l ATTACHMENT I

~ AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. sn /to s

! UNIT v.c. summer I I

DATE 07-10-91 l

COMPLETED BY G.J. Taylor TELEPHONE (803) 345-5209 MONTH JANUARY 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) g 416 37 410 2

412 ,

gg , 169 -

619 qqn 3 19 4 416 20 40R 5 413 21 417 6 416 22 901 7 417 23 398 8 414 24 411 g 413 25 416 l 10 414 26 An?

I t

11 409 y an?

12 409 28 400 13 407 29 ') ? 'l 14 408 30 390 15 411 31 199 18 412 8302150136 830210 DRADOCK05000g

W 4

Director, Office of Management and Program Analysis ATTACHMENT II

& nthly Operating Report Page 3 OPERATING DATA REPORT '

50/395

~ ' ~ ~

February 10, 1983 DOCKET NO.

UNIT V.C. Summer I OATE 02-10-83 G.J. Taylor COMPLETED BY TELEPHONE (803) 345-5209 OPERATING STATUS JANITARY 1983 744 GROSS HOURS IN REPORTING PERIOO:

1. REPORTING PERIOD:

2775 MAX. DEPEND. CAPACITY (MWo. Net): N/A

2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 400 DESIGN ELECTRICAL RATING (MWo. Net):

N/A (50% MWth)

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWo. Net):
4. REASONS FOR RESTRICTION (IF ANY):

The operating license allows operations t THIS MONTH YR TO DATE CUMULATIV E 50% MWth for power operations testing. 77R 5 77R 5 7015_1

5. NUMBER OF HOURS REACTOR WAS CRITICAL 0 0 0
6. REACTOR RESERVE SHUTDOWN HOURS . . . . . . . . . . . . . . . . . . .

710.7 710.7 1472.0

7. HOURS GENERATOR ON LINE .........................

0 0 0

8. UNIT RESERVE SHUTDOWN HOURS ......................

975.351 975.351 1.771.224

9. GROSS THERMAL ENERGY GENERATED (MWH) .............

311,300 311.300 527.517

10. GROSS ELECTRICAL ENERGY GENERATED (MWH) . . . . . . . . . . . . .

287,476 287,476 478,672

11. NET ELECTRICAL ENERGY GENERATED (MWH) .............

N/A N/A N/A

12. R EACTOR SE RV ICE F ACTOR . . . . . . . . . . . . . . . . . . . . . . . . . . .

'N/A N/A N/A

13. REACTOR AV AILABILITY F ACTOR . . . . . . . . . . . . . . . . . . . . . . .

N/A N/A N/A

14. UNIT SE RVICE F ACTOR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

N/A N/A N/A

15. UNIT AVAILABI LITY F ACTOR . . . . . . . . . . . . . . . . . . . . . . . . . .

N/A N/A N/A

16. UNIT CAPACITY FACTOR (Using MDC17. . . . r . . . . . . . . . . . . . . .
17. UNIT CAPACITY FACTOR (Using Design MWel . ...............

^

18. UNIT FORCED OUTAGE R ATE . . . . . . . . . ................
19. SHUTOOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):

D-3 Steam Generator Modification -- March 1983 through May 1983 N/A

20. IF SHUT DOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:

FORECAST ACHIEVED

21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATICN):

10-20-82 10-22-82 INITI AL CRITICALITY 11-17-82 11-16-82 INITIAL ELECTRICITY l

COMMERCI AL OPERATION

Director, Office of Management and Program Analysis ATTACHMENT III DOCKET NO. 50/395 Monthly Operating Report Page 4 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME V.C. Summer I February 10, 1983 02-10-83 1.) ATE COMPLETED BY G.J. Tavlor REPORT MONTil JANUARY 1983 TELEPilONE (803) 345-5209 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER (2) CORRECTIVE ACTIONS / COMMENTS 1 830118 F 16.1 A 3 1) Reactor trip due to Hi bearing vibration in turbine, caused by loose connections in turbine supervisory cabinet.

2 830122 . F 8.9 B 3 .

- 2) Turbine trip, reactor trip while performing a vibration monitoring surveillance.

I 3 830129 F 8.3 B 2 3) Manual reactor trip due to inadvertantly dropping four (4) control rods (instead of two (2) control rods) while performing Nuclear Instrumentation Negative

- Rate Reactor Trip Test.

l o

i e

Director, Office of Management -and Program Analysis Monthly Operating Report Page 5 February 10, 1983 ATTACHMENT IV NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Virgil C. Summer Nuclear Station, Unit No.1, has been in the precess of continuing the power ascension test program at a 50% of rated thermal power level.

A reactor trip occurred at 1051 hours0.0122 days <br />0.292 hours <br />0.00174 weeks <br />3.999055e-4 months <br /> January 18,1983, from a 50%

power level. The trip was due to a turbine trip on Hi bearing vibration. An investigation revealed that a . spurious trip signal was generated due to loose electrical connections in the turbine supervisory cabinet.

A reactor trip occurred at 1150 hours0.0133 days <br />0.319 hours <br />0.0019 weeks <br />4.37575e-4 months <br /> January 22, 1983, from a 50%

power level. The reactor trip was due to a turbine trip while performing a surveillance test on the main turbine control and stop valves.

A reactor trip occurred at 1337 hours0.0155 days <br />0.371 hours <br />0.00221 weeks <br />5.087285e-4 months <br /> January 29,1983, from a 50%

power level. The reactor was tripped manually, when four (4) control rods [instead of two (2)] were inadvertantly dropped, while performing a Nuclear Instrumentation Negative Rate Reactor Trip Test.

Virgil C. Summer Nuclear Station is presently operating at a 50%

power level and continuing the power ascension test program.