t Director, Office of Management and Program Analysis Monthly Operating Report
" age 2 ruary 10, 1983 l
ATTACHMENT I
~ AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. sn /to s UNIT v.c. summer I I
l DATE 07-10-91 COMPLETED BY G.J. Taylor TELEPHONE (803) 345-5209 MONTH JANUARY 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 416 37 410 g
412 169 2
gg,
3 619 19 qqn 4
416 20 40R 5
413 21 417 6
416 22 901 7
417 23 398 8
414 24 411 g
413 25 416 l
10 414 26 An?
I 11 409 y
an?
t 12 409 28 400 13 407 29
') ? 'l 14 408 30 390 15 411 31 199 18 412 8302150136 830210 DRADOCK05000g
W 4
Director, Office of Management and Program Analysis ATTACHMENT II
& nthly Operating Report OPERATING DATA REPORT Page 3
~ ' ~ ~
50/395 February 10, 1983 DOCKET NO.
V.C. Summer I UNIT 02-10-83 OATE G.J. Taylor COMPLETED BY (803) 345-5209 TELEPHONE OPERATING STATUS 744 JANITARY 1983 GROSS HOURS IN REPORTING PERIOO:
- 1. REPORTING PERIOD:
2775 MAX. DEPEND. CAPACITY (MWo. Net): N/A
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt):
400 DESIGN ELECTRICAL RATING (MWo. Net):
N/A (50% MWth)
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWo. Net):
- 4. REASONS FOR RESTRICTION (IF ANY):
The operating license allows operations t THIS MONTH YR TO DATE CUMULATIV E 50% MWth for power operations testing.
77R 5 77R 5 7015_1
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL 0
0 0
- 6. REACTOR RESERVE SHUTDOWN HOURS...................
710.7 710.7 1472.0
- 7. HOURS GENERATOR ON LINE.........................
0 0
0
- 8. UNIT RESERVE SHUTDOWN HOURS......................
975.351 975.351 1.771.224
- 9. GROSS THERMAL ENERGY GENERATED (MWH) 311,300 311.300 527.517
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH).............
287,476 287,476 478,672
- 11. NET ELECTRICAL ENERGY GENERATED (MWH)
N/A N/A N/A
- 12. R EACTOR SE RV ICE F ACTOR...........................
'N/A N/A N/A
- 13. REACTOR AV AILABILITY F ACTOR.......................
N/A N/A N/A
- 14. UNIT SE RVICE F ACTOR..............................
N/A N/A N/A
- 15. UNIT AVAILABI LITY F ACTOR..........................
N/A N/A N/A
- 16. UNIT CAPACITY FACTOR (Using MDC17.... r...............
- 17. UNIT CAPACITY FACTOR (Using Design MWel.
^
- 18. UNIT FORCED OUTAGE R ATE.........................
- 19. SHUTOOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
D-3 Steam Generator Modification -- March 1983 through May 1983 N/A
- 20. IF SHUT DOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATICN):
FORECAST ACHIEVED 10-20-82 10-22-82 INITI AL CRITICALITY 11-17-82 11-16-82 INITIAL ELECTRICITY l
COMMERCI AL OPERATION
Director, Office of Management and Program Analysis ATTACHMENT III DOCKET NO. 50/395 Monthly Operating Report Page 4 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME V.C. Summer I February 10, 1983 02-10-83 1.) ATE COMPLETED BY G.J. Tavlor REPORT MONTil JANUARY 1983 TELEPilONE (803) 345-5209 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO.
DATE S: SCHEDULED (HOURS)
REASON (1)
REDUCING POWER (2)
CORRECTIVE ACTIONS / COMMENTS 1
830118 F
16.1 A
3 1)
Reactor trip due to Hi bearing vibration in turbine, caused by loose connections in turbine supervisory cabinet.
- 2) Turbine trip, reactor trip while F
8.9 B
3 2
830122 performing a vibration monitoring surveillance.
I 3
830129 F
8.3 B
2
- 3) Manual reactor trip due to inadvertantly dropping four (4) control rods (instead of two (2) control rods) while performing Nuclear Instrumentation Negative Rate Reactor Trip Test.
l o
i e
Director, Office of Management -and Program Analysis Monthly Operating Report Page 5 February 10, 1983 ATTACHMENT IV NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE Virgil C.
Summer Nuclear Station, Unit No.1, has been in the precess of continuing the power ascension test program at a 50% of rated thermal power level.
A reactor trip occurred at 1051 hours0.0122 days <br />0.292 hours <br />0.00174 weeks <br />3.999055e-4 months <br /> January 18,1983, from a 50%
power level.
The trip was due to a turbine trip on Hi bearing vibration.
An investigation revealed that a. spurious trip signal was generated due to loose electrical connections in the turbine supervisory cabinet.
A reactor trip occurred at 1150 hours0.0133 days <br />0.319 hours <br />0.0019 weeks <br />4.37575e-4 months <br /> January 22, 1983, from a 50%
power level.
The reactor trip was due to a turbine trip while performing a surveillance test on the main turbine control and stop valves.
A reactor trip occurred at 1337 hours0.0155 days <br />0.371 hours <br />0.00221 weeks <br />5.087285e-4 months <br /> January 29,1983, from a 50%
power level.
The reactor was tripped manually, when four (4) control rods [instead of two (2)] were inadvertantly dropped, while performing a Nuclear Instrumentation Negative Rate Reactor Trip Test.
Virgil C.
Summer Nuclear Station is presently operating at a 50%
power level and continuing the power ascension test program.