Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20065E146 + (00:54:47, 17 December 2024)
- ML20065E150 + (00:54:47, 17 December 2024)
- ML20065E139 + (00:54:49, 17 December 2024)
- TAC:69009 + (00:54:49, 17 December 2024)
- ML20065E132 + (00:54:51, 17 December 2024)
- 05000354/LER-1994-001-02, :on 940305,ESF Sys Actuation,Isolation & Loss of Shutdowm Cooling Occurred.Caused by Personnel Error.Lead Technician Counseled on Event + (00:54:55, 17 December 2024)
- L-90-027, Responds to Generic Ltr 90-07, Operator Licensing Natl Exam Schedule + (00:54:56, 17 December 2024)
- ML20065E104 + (00:54:57, 17 December 2024)
- PY-CEI-NRR-1778, Responds to NOV & Open Resolved Items Contained within NRC Insp Rept 50-440/93-07,dated 930623.Implementation of Revised Program,Including Licensed Operator Training Expected to Be Completed by Aug 1994 + (00:54:58, 17 December 2024)
- ML20065E097 + (00:54:58, 17 December 2024)
- ML20065E079 + (00:54:59, 17 December 2024)
- ML20065E068 + (00:55:00, 17 December 2024)
- SNRC-1761, Revised Application for Amend to License NPF-82,consisting of License Change Application 7,reflecting Agreements Made During 900912 Telcon W/Nrc.License Condition 2.C.(3) Not Relocated to Item 2.D as Originally Requested + (00:55:00, 17 December 2024)
- ML20065E059 + (00:55:01, 17 December 2024)
- B14793, Responds to NRC Re Violations Noted in Insp Rept 50-423/93-24.Corrective Actions:Scope & Frequency of Slcrs/ Abfs Testing/Trending Will Be Revised to Address Component Timing & Stability.Fee Paid + (00:55:02, 17 December 2024)
- ML20065E027 + (00:55:03, 17 December 2024)
- ML20065E009 + (00:55:04, 17 December 2024)
- ML20065E008 + (00:55:05, 17 December 2024)
- ML20065D998 + (00:55:06, 17 December 2024)
- ML20065D991 + (00:55:07, 17 December 2024)
- ML20065D986 + (00:55:08, 17 December 2024)
- ML20065D984 + (00:55:09, 17 December 2024)
- ML20065D983 + (00:55:09, 17 December 2024)
- ML20065D977 + (00:55:10, 17 December 2024)
- ML20065D979 + (00:55:10, 17 December 2024)
- ML20065D976 + (00:55:11, 17 December 2024)
- ML20065D968 + (00:55:12, 17 December 2024)
- NPL-94-0118, Provides Summary of ECCS Evaluation Model Changes & Errors Discovered in ECCS Evaluation Models for Point Beach Nuclear Plant Units 1 & 2 + (00:55:12, 17 December 2024)
- ML20065D966 + (00:55:14, 17 December 2024)
- ML20065D959 + (00:55:15, 17 December 2024)
- NPL-94-0126, Provides Info About Calculations Performed to Verify Tech Spec Amends 137 & 141 for Units 1 & 2,respectively,re Degraded Voltage Protection Settimg Limit + (00:55:16, 17 December 2024)
- ML20065D953 + (00:55:21, 17 December 2024)
- ML20065D942 + (00:55:24, 17 December 2024)
- 05000346/LER-1982-040-03, /03L-0:on 820823,component Cooling Water Pump 1-3 Failed to Start.Caused by Failure of Circuit Breaker in Cubicle AD108 to Stay Closed Due to Maladjustment Between Interlock Lever & Closing Trigger + (00:55:25, 17 December 2024)
- ST-HL-AE-0562, Forwards 1RE02 Inservice Insp Summary Rept for Repairs & Replacements at South Project Electric Generating Station Unit 1, from 891019-900621 + (00:55:26, 17 December 2024)
- 05000346/LER-1982-040, Forwards LER 82-040/03L-0 + (00:55:27, 17 December 2024)
- 05000280/LER-1982-089-03, /03L-0:on 820826,B Core Cooling Monitor Failed, Causing Spurious Alarms.Caused by Relay Failure on Printed Circuit Cards A-1 & A-2.Boards Repaired & Core Cooling Monitor Returned to Svc + (00:55:29, 17 December 2024)
- ML20065D908 + (00:55:33, 17 December 2024)
- ML20065D906 + (00:55:34, 17 December 2024)
- 05000280/LER-1982-085-03, /03L-0:on 820824,RCS post-reactor Trip Specific Activity Samples Found Greater than Tech Spec Limits.Caused by Fuel Defects in Reactor Core.Acclerated Sampling Frequency Implemented Till RCS Activity Less than Tech Spec + (00:55:35, 17 December 2024)
- RBG-33596, Forwards Rev to 900507 Response to Violations Noted in Insp Rept 50-458/90-02 on 900122-26.Corrective Actions:Affected Prefire Strategies Revised by 900308 to Add Recommendations for Operator Action from FHA + (00:55:36, 17 December 2024)
- ML20065D894 + (00:55:37, 17 December 2024)
- RBG-33590, Forwards Special Rept Re Diesel Generator Control Room Temps in Excess of Tech Spec 3.7.8 for Greater than 8 H + (00:55:38, 17 December 2024)
- ML20065D885 + (00:55:38, 17 December 2024)
- 05000254/LER-1982-028-03, /03L-0:on 820719,while Performing Reactor High Pressure Scram Functional Test,Pressure Switch PS-1-263-55A Found to Trip at 1061 Psig.Caused by Instrument Setpoint Drift.Switch Recalibr + (00:55:40, 17 December 2024)
- 05000254/LER-1982-028, Forwards LER 82-028/03L-0 + (00:55:43, 17 December 2024)
- ML20065D851 + (00:55:51, 17 December 2024)
- ML20065D857 + (00:55:51, 17 December 2024)
- ML20065D849 + (00:55:52, 17 December 2024)
- ML20065D830 + (00:55:53, 17 December 2024)
- ML20065D824 + (00:55:53, 17 December 2024)
- ML20065D821 + (00:55:54, 17 December 2024)