Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20065F526 + (00:50:48, 17 December 2024)
- W3P82-2757, Forwards Summary of Five Qualification Tests,Ani Acceptance Ltrs & Excerpts from Five Qualification Test Repts.Repts Include Fire Qualification Test on Silicone Foam Floor Penetration Seals + (00:50:49, 17 December 2024)
- ML20065F516 + (00:50:53, 17 December 2024)
- ML20065F520 + (00:50:53, 17 December 2024)
- 05000412/LER-1990-009-01, :on 900902,letdown Isolation on Loss of Containment Instrument Air Pressure Occurred.Caused by Deviation from Surveillance Procedure to Protect Plant Equipment from Unnecessary Stress + (00:50:55, 17 December 2024)
- ML20065F512 + (00:50:56, 17 December 2024)
- 05000334/LER-1990-014, :on 900831,ESF Actuation Steam Generator Blowdown Isolation Occurred.Caused by Failure of Steam Driven Auxiliary Feedwater Pump Discharge Pressure Switch. Pressure Switch Replaced + (00:50:58, 17 December 2024)
- ML20065F510 + (00:50:59, 17 December 2024)
- 05000456/LER-1990-016-03, :on 900828,auxiliary Bldg Inaccessible Filter Plenum a Charcoal Booster Fan Ob Spuriously Auto Started. Root Cause Undetermined.Fan Breaker & Control Circuitry Checked + (00:51:00, 17 December 2024)
- 05000374/LER-1990-004, :on 900320,local Leak Rate Test Min Pathway Leakage Exceeded.Caused by Incomplete Seating Surface on Valves.Valves Repacked,Seat Lapped & Surface of Valves Cleaned + (00:51:09, 17 December 2024)
- 05000353/LER-1990-013-02, :on 900831,RCIC Sys Isolation Occurred.Caused by Personnel Error Resulting in Procedural Noncompliance. Procedural Compliance & Higher Attention to Detail Reinforced to Personnel + (00:51:11, 17 December 2024)
- 05000353/LER-1994-001-02, :on 940302,operator Determined That ST Procedure for Unit 2 Isolation Actuation Instrument TU Had Not Been Performed.Cause Was Personnel Error.Shift Supervisor Was Counseled + (00:51:13, 17 December 2024)
- ML20065F497 + (00:51:14, 17 December 2024)
- ML20065F480 + (00:51:15, 17 December 2024)
- ML20065F491 + (00:51:15, 17 December 2024)
- 05000311/LER-1982-094-03, /03L-0:on 820825,2C Vital Bus Undervoltage Relay Failed to Trip at Required Setpoint.Caused by Setpoint Drift.Channel Declared Operable & Action Statement 3.3.2a Action 14 Terminated + (00:51:22, 17 December 2024)
- ML20065F439 + (00:51:23, 17 December 2024)
- ML20065F424 + (00:51:25, 17 December 2024)
- ML20065F417 + (00:51:26, 17 December 2024)
- ML20065F411 + (00:51:27, 17 December 2024)
- ML20065F408 + (00:51:28, 17 December 2024)
- ML20065F406 + (00:51:29, 17 December 2024)
- ML20065F401 + (00:51:30, 17 December 2024)
- 05000277/LER-1993-013-01, :on 930819,TS Violation Occurred When Primary Containment Isolation Sys Inoperable & Isolation Valve Not Isolated & Logged.Caused by Insufficient Trouble Shooting. Auxiliary Contact Replaced + (00:51:31, 17 December 2024)
- ML20065F398 + (00:51:33, 17 December 2024)
- 05000311/LER-1982-094, Forwards LER 82-094/03L-0.Detailed Event Analysis Encl + (00:51:34, 17 December 2024)
- ML20065F381 + (00:51:38, 17 December 2024)
- ML20065F377 + (00:51:39, 17 December 2024)
- PY-CEI-NRR-1775, Provides Suppl to Response to GL 91-11 Re Resolution of Generic Issues 48 & 49 + (00:51:39, 17 December 2024)
- ML20065F360 + (00:51:40, 17 December 2024)
- LIC-94-0082, Forwards Documentation Associated W/License Renewal Applications for Senior Reactor Operators Assigned to Plant. W/O Encl + (00:51:41, 17 December 2024)
- ML20065F333 + (00:51:41, 17 December 2024)
- L-82-374, Responds to NRC Re Violations Noted in IE Insp Repts 50-250/82-24 & 50-251/82-24.Corrective Actions:Plant Manager Discussed Need for Increased Control of Activities Affecting Fire Barrier Penetrations W/Const Personnel + (00:51:42, 17 December 2024)
- ML20065F304 + (00:51:43, 17 December 2024)
- LIC-94-0074, Submits Rev to Commitment in Analysis Supporting Compliance w/NUREG-0737,Item II.D.1 Re Relief & Safety Valve Test Requirements + (00:51:44, 17 December 2024)
- ML20065F298 + (00:51:44, 17 December 2024)
- ML20065F295 + (00:51:45, 17 December 2024)
- ML20065F276 + (00:51:46, 17 December 2024)
- RC-94-0096, Forwards Technical Rept 93-3, Seismic Activity Near Vsns for Period Jul-Sept 1993 & Technical Rept 93-4, Seismic Activity Near Vsns for Period Oct-Dec 1993 + (00:51:46, 17 December 2024)
- 05000395/LER-1994-002-01, :on 940128,pressure & Flow Data for Charging/ Safety Injection Pumps Identified Condition Outside of Design Basis.Caused by Personnel Error.Controls Established & Test Procedures Revised + (00:51:48, 17 December 2024)
- ML20065F270 + (00:51:49, 17 December 2024)
- 05000324/LER-1982-083-03, Performance of PT-20.6 Revealed That Drywell to Torus Vacuum Breakers X18A,C & E Were Leaking Excessively.Caused by Accumulation of Dirt, Scale & Silicone Base Sealant on Valve Seating Surfaces + (00:51:52, 17 December 2024)
- ML20065F260 + (00:51:53, 17 December 2024)
- 05000324/LER-1982-083, Forwards Updated LER 82-083/03L-1 + (00:51:54, 17 December 2024)
- ML20065F238 + (00:51:55, 17 December 2024)
- ML20065F251 + (00:51:55, 17 December 2024)
- ML20065F223 + (00:51:56, 17 December 2024)
- ML20065F209 + (00:51:57, 17 December 2024)
- ML20065F205 + (00:51:58, 17 December 2024)
- ML20065F208 + (00:51:58, 17 December 2024)
- ML20065F197 + (00:51:59, 17 December 2024)