Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000333/LER-1994-001, :on 940224,HPCI Sys Had Declared Inoperable Due to Turbine Shaft Seal Leakage.Caused by Corrosion of Gland Seal Casing & Pitting.New Turbine Shaft Seals Installed.W/ + (00:48:17, 17 December 2024)
- ML20065G340 + (00:48:18, 17 December 2024)
- FVY-82-108, Comments on Systematic Assessment of Licensee Performance Rept,Discussed at 820908 Meeting.Rept Fair Appraisal of Activities for Rept Period + (00:48:19, 17 December 2024)
- ML20065G336 + (00:48:19, 17 December 2024)
- ML20065G330 + (00:48:20, 17 December 2024)
- W3P82-2532, Requests Test Exception to Delete Stuck Control Rod Physics Test.Test Has Potential for Placing Reactor in Unsafe Configuration + (00:48:20, 17 December 2024)
- 1CAN098211, Application for Amend to License DPR-51,changing 820517 Tech Spec Change Request to Allow Higher Steam Line Break Instrumentation & Control Sys Setpoint + (00:48:21, 17 December 2024)
- ML20065G316 + (00:48:22, 17 December 2024)
- 05000293/LER-1982-037-03, /03L-0:on 820823,three Monthly Functional Surveillances Performed in Slight Excess of Allowable 25% Tolerance.Caused by Personnel Oversight.Senior Level Compliance Review Implemented.Proposed Test Aids Planned + (00:48:23, 17 December 2024)
- ML20065G311 + (00:48:24, 17 December 2024)
- 05000293/LER-1982-037, Forwards LER 82-037/03L-0 + (00:48:25, 17 December 2024)
- ML20065G292 + (00:48:26, 17 December 2024)
- 05000387/LER-1982-017-03, /03L-0:on 820826,sprinkler Sys for Fire Zone 1-5A Was Out of Svc.Detector Reset Initiated on Fire Protection Panel in Control Room,But Required Reset of Priorities (RSP) Not Performed.Rsp Initiated + (00:48:27, 17 December 2024)
- 05000387/LER-1982-017, Forwards LER 82-017/03L-0 + (00:48:28, 17 December 2024)
- ML20065G275 + (00:48:29, 17 December 2024)
- ML20065G271 + (00:48:30, 17 December 2024)
- 0CAN109002, Application for Amends to Licenses DPR-51 & NPF-6,revising Tech Spec Section 6.0, Administrative Controls, to Delete Specific Refs to Staff Positions & Plant Safety Committee Compositions + (00:48:31, 17 December 2024)
- 05000440/LER-1990-023, :on 900907,reactor Protection Sys Bus Deenergization & Shutdown Cooling Isolation Occurred During Surveillance Testing Due to Personnel Error.Personnel Instructed on Ramifications of Inattention During Tests + (00:48:33, 17 December 2024)
- ML20065G258 + (00:48:34, 17 December 2024)
- ML20065G256 + (00:48:38, 17 December 2024)
- ML20065G250 + (00:48:42, 17 December 2024)
- 05000445/LER-1990-029, :on 900910,turbine/reactor Trip Caused by Failure of Personnel to Assure Availability of Drain Path. Operators Responded to Trip Per EOP & Stabilized Plant in Mode 3 + (00:48:46, 17 December 2024)
- ML20065G248 + (00:48:47, 17 December 2024)
- 05000315/LER-1982-076-03, /03L-0:on 820823,inverter for Emergency Diesel Generator 4B Failed,Leaving Only Centrifugal Charging Pump in Svc W/O Emergency Power Supply.Cause Not Stated.Charging Pump Shifted & Inverter Repaired + (00:48:49, 17 December 2024)
- 05000324/LER-1990-006-01, :on 900604,hydraulic Perturbation of Reactor Vessel Resulted in Isolation of RWCU Sys.Caused by Increased Differential Pressure.Operations Personnel Restored Affected Sys to Svc + (00:48:51, 17 December 2024)
- 05000325/LER-1990-006, :on 900426,hydraulic Perturbation Occurred Causing Reactor Bldg Ventilation Sys to Isolate.Caused by Air in Transmitters During Flushing of Instrument.Procedure Revs Initiated to Change Valving Process + (00:48:57, 17 December 2024)
- 05000315/LER-1982-076, Forwards LER 82-076/03L-0 + (00:48:58, 17 December 2024)
- ML20065G222 + (00:48:58, 17 December 2024)
- ML20065G218 + (00:49:00, 17 December 2024)
- ML20065G200 + (00:49:02, 17 December 2024)
- 05000334/LER-1981-028-03, /03L-0:on 810219,during Power Operation,Results of Surveillance Test Revealed Reactor Coolant Leakage of 2.09 Gpm.Caused by Failure of Gland Flange on Valve.Split Gland Flange Used as Mod to Repair Valve.Work Completed 81022 + (00:49:04, 17 December 2024)
- ML20065G191 + (00:49:05, 17 December 2024)
- AECM-82-434, Advises of Delay in Response to Humphrey Concerns Re Containment Issues Pending 821001 Conference Discussion W/Ge on Local Encroachments,Action Plans 1-4.Commitment Based on 820929 Telcon W/Containment Sys Branch + (00:49:06, 17 December 2024)
- 05000395/LER-1994-002, Forwards LER 94-002 in Response to NRC Insp Rept 50-395/94-07 + (00:49:07, 17 December 2024)
- 05000412/LER-1990-012-01, :on 900913,ESF Actuation Involving Containment Purge Isolation Occurred.Caused by Communication Error by Personnel.Maint Surveillance Procedures for Control Room Radiation Monitors to Be Revised + (00:49:09, 17 December 2024)
- ML20065G142 + (00:49:10, 17 December 2024)
- ML20065G147 + (00:49:10, 17 December 2024)
- 05000454/LER-1990-012-02, :on 900906,determined That Auxiliary Feedwater Discharge Isolation Valves Could Not Be Relied Upon.Caused by Inadequate Emergency Procedures.Revs to Emergency Procedures in Progress + (00:49:12, 17 December 2024)
- ML20065G133 + (00:49:14, 17 December 2024)
- ML20065G126 + (00:49:15, 17 December 2024)
- ML20065G121 + (00:49:16, 17 December 2024)
- ML20065G115 + (00:49:20, 17 December 2024)
- ML20065G113 + (00:49:21, 17 December 2024)
- 05000317/LER-1990-025, :on 900911,power Lost to Sample Pump for Gaseous Effluent Monitoring.Caused by Inadequate Design & Personnel Error.Power Promptly Restored to Sampling Equipment from Designated Receptacle + (00:49:22, 17 December 2024)
- ML20065G110 + (00:49:24, 17 December 2024)
- 05000353/LER-1990-014-02, :on 900906,ESF Actuation of Primary Containment & Reactor Vessel Isolation Control Sys Occurred.Caused by Lack of Attention to Detail Resulting in Procedural Noncompliance.Personnel Counseled + (00:49:25, 17 December 2024)
- ML20065G105 + (00:49:26, 17 December 2024)
- ML20065G102 + (00:49:31, 17 December 2024)
- ML20065G067 + (00:49:32, 17 December 2024)
- RBG-33864, Discusses Progress of Evaluation & Procurement Activities to Meet Reg Guide 1.97 Neutron Monitoring Requirements + (00:49:33, 17 December 2024)
- HL-4550, Informs That in Response to Listed Items from SE for 18 Responses Provided in Util ,Util Has Revised Relief Requests RR-P-6 & RR-P-7 of Second 10-yr Insp Interval IST Program.Revised Relief Requests Encl + (00:49:35, 17 December 2024)